integrated mission completion acquisition site tour
play

Integrated Mission Completion Acquisition Site Tour Handout - PowerPoint PPT Presentation

Integrated Mission Completion Acquisition Site Tour Handout Aerial View of Savannah River Site Liquid Waste System Liquid Waste System Information Composite Waste Inventories Liquid Waste System Disposition Paths


  1. Integrated Mission Completion Acquisition Site Tour Handout • Aerial View of Savannah River Site Liquid Waste System • Liquid Waste System Information • Composite Waste Inventories • Liquid Waste System Disposition Paths • Liquid Waste System Gear Chart • F-Tank Farm Layout • F-Tank Farm Aerial Photo with Labels • H-Tank Farm Layout • H-Tank Farm Aerial Photo with Labels • Effluent Treatment Facility Aerial Photo with Labels • Saltstone Mixer and Grout Pump • Saltstone Disposal Unit (SDU) Location Map • SDU Aerial Progress Photo

  2. F-Area Tank Farm

  3. H-Area Tank Farm

  4. Critical Saltstone Production Facility Equipment Grout Pump Grout Mixer

  5. SDUs – Planned Layout and Statistics Tank Dimensions 375’ diameter x 43’ high Volume 32.8 million gallons (41’) Mud Mat Concrete 4,252 cubic yards Tank Concrete ~16,872 cubic yards Wall Panels 25 total, 24” thick at base, 12” thick at top Floor Area 110,000 sq. ft. Columns 208 – 24” diameter Roof Coating System to reflect solar absorption and minimize thermal stress 425 post tensioning rods in walls 7 layers of prestress cables (341 miles) Liner panels >7,000 pieces, 11’x41’x3mm thick Piping 2,400 linear feet and 17 valves

Recommend


More recommend