Installation of Additional Low Voltage Power at UXC55 Cameron Bravo Eve Emmanuelidu Monday, August 19, 13
Assembled and installed brackets to hold the additional junction boxes for ME4/2 chambers at X2 and X4 Monday, August 19, 13
Installed rails and heat exchangers for the new MARATONs (PSUs) for ME1/1 and ME4/2 chambers Removed cable distributors that need to be modified for the addition of another MARATON Monday, August 19, 13
Removed 4 junction boxes from YE1+X2 Near side Monday, August 19, 13
Monday, August 19, 13
Installed the junction boxes at X4+ Near and X2+ Far Sides Monday, August 19, 13