inland waterborne transport in mekong river and its
play

Inland Waterborne Transport in Mekong River and its effect for the - PowerPoint PPT Presentation

INTERNATIONAL SEMINAR INTERNATIONAL SEMINAR ON INLAND AND COASTAL WATERBORNE TRANSPORT ON INLAND AND COASTAL WATERBORNE TRANSPORT AND REGIONAL DEVELOPMENT AND REGIONAL DEVELOPMENT Inland Waterborne Transport in Mekong River and its effect


  1. INTERNATIONAL SEMINAR INTERNATIONAL SEMINAR ON INLAND AND COASTAL WATERBORNE TRANSPORT ON INLAND AND COASTAL WATERBORNE TRANSPORT AND REGIONAL DEVELOPMENT AND REGIONAL DEVELOPMENT Inland Waterborne Transport in Mekong River and its effect for the regional development Vanthong SOMPHAVATH Department of Waterways Ministry of Public Works and Transport PIANC 125 th Anniversary Celebration in ASIA, Nagoya JAPAN 12-14 September 2010

  2. CONTENT 1. Mekong River condition in brief 2. Water borne transport in Lao PDR 3. IWT improvement 4. Institutional Strengthening 5. Future Plan PIANC 125 th Anniversary Celebration in ASIA, Nagoya JAPAN 1 12-14 September 2010

  3. 1. Mekong River condition in brief • The Total length of Mekong River is 4,800 km, and 1,989 km runs through the Lao territory. • Major domestic and international waterways for the Lao PDR and GMS countries. PIANC 125 th Anniversary Celebration in ASIA, Nagoya JAPAN 2 12-14 September 2010

  4. Mekong River Basin No Mai Tributaries 1 Nam Tha 2 Nam Ou 3 Mam suang 5 Nam khan 6 Nam Ngum 7 Nam Theun 8 Nam Hinboun 9 Se Bang Fai 10 Se Bang Hieng 11 Se Done PIANC 125 th Anniversary Celebration in ASIA, Nagoya JAPAN 3 12-14 September 2010

  5. PIANC 125 th Anniversary Celebration in ASIA, Nagoya JAPAN 4 12-14 September 2010

  6. 2. Water borne transport in Lao PDR • Mekong River is one corridor from North to South, which can economically linked Laos to the other five riparian countries, Navigation on Mekong River are divided into 5 stretches with difference navigation condition depending on seasonal and water level in the river. • Navigation is hindering by rapids, shoals, sand bars, rock outcrops. The main barrier along the Mekong River is the Khone falls as the Border Cambodian, in colonial time to transit goods between top and bottom of the falls by the rail line on the Khone and Deth islands. PIANC 125 th Anniversary Celebration in ASIA, Nagoya JAPAN 5 12-14 September 2010

  7. T it P t t Kh F ll Rapid

  8. 2. Water borne transport in Lao PDR(cont ) • IWT had been playing an important role since several hundred years ago until now, the IWT was a traditional mode of transport for our previous generation. • IWT is shared the freight transport about 31% and passenger transport about 6% of total yearly carried capacity among all modes • Main commodity or goods: timber, wood products, construction material, rice, fuel, sand, rock, wood products, foods grains, steel product and logs. PIANC 125 th Anniversary Celebration in ASIA, Nagoya JAPAN 7 12-14 September 2010

  9. 2. Water borne transport in Lao PDR(cont) • The implementation of the Quadripartite Agreement is under going. • The development of international transport along the Upper Mekong shows the potential use of the river for urging trade, tourist and friendship among China, Laos, Myanmar and Thailand. PIANC 125 th Anniversary Celebration in ASIA, Nagoya JAPAN 8 12-14 September 2010

  10. 2. Water borne transport in Lao PDR ( cont.) FLEET FLEET • The fleet has different capacity both Cargo barges and passenger boats which refer to condition of the waterways stretch: – 71 cargo barges with carrying capacity 50 T and over and 902 cargo barges less than 50 T ; – 84 passenger boats with carrying over 50 persons, 303 boats (15-50 persons) and 5,812 boats with carrying less than 15 persons; – 33 ferry boats. PIANC 125 th Anniversary Celebration in ASIA, Nagoya JAPAN 9 12-14 September 2010

  11. 2. Water borne transport in Lao PDR ( cont.) Mekong River Port Mekong in Laos has more than 29 river ports have been constructed to ensure loading and unloading process between boats and trucks. PIANC 125 th Anniversary Celebration in ASIA, Nagoya JAPAN 10 12-14 September 2010

  12. 11 PIANC 125 th Anniversary Celebration in ASIA, Nagoya JAPAN Tourism boat 12-14 September 2010

  13. Speed/Passenger Boat, Laos

  14. Big size of Cargo Boat PIANC 125 th Anniversary Celebration in ASIA, Nagoya JAPAN 13 12-14 September 2010

  15. 3. IWT improvement Aids to Navigation • There are 541 unlighted Concrete beacons in Lao PDR from Bokeo to Khone, Between 1910 ‐ 1930, 600 beacons were built, some of them disappeared. In 1995, 28 beacons have been built and painted green for the left bank and red for the right PIANC 125 th Anniversary Celebration in ASIA, Nagoya JAPAN 14 12-14 September 2010

  16. Aids to Navigation (cont.) • The MRC and ESCAP joint project on Recommended System of Aids to Navigation for GMS countries were introduced. PIANC 125 th Anniversary Celebration in ASIA, Nagoya JAPAN 15 12-14 September 2010

  17. Aids to Navigation (cont.) • In 2008, the Mekong River Commission (MRC) carried out condition survey of hot spots and dangerous areas and then installed aids to navigation on the river section in the Lao PDR and Thailand. PIANC 125 th Anniversary Celebration in ASIA, Nagoya JAPAN 16 12-14 September 2010

  18. Concrete Beacon • Aids to navigation are one of the priority areas of the Lao PDR, the MPWT has been trying to rehabilitate the existing beacons and install more beacons. However, the annual budget for aids to navigation is very limited. PIANC 125 th Anniversary Celebration in ASIA, Nagoya JAPAN 17 12-14 September 2010

  19. Channel Improvement PIANC 125 th Anniversary Celebration in ASIA, Nagoya JAPAN 18 12-14 September 2010

  20. 4. Institutional Strengthening.) • The Ministry of Public Works and Transport is responsible for all aspects related to IWT, inland waterways works, as well as maritime transport; • The Department of Waterways in general is taken the responsibility for management, construction and maintenance of waterways facilities, including ports and navigation aids, navigation channel improvement and all river works engineering. • All ports are under responsibility of the Provincial Department of Public Works and Transport except private port. PIANC 125 th Anniversary Celebration in ASIA, Nagoya JAPAN 19 12-14 September 2010

  21. 2000 Upper Mekong-Lancang Navigation Agreement and Protocols, Between China, Myanmar, Lao PDR, and Thailand, between Jinghong and Luang Prabang LEGAL FRAMEWORK FOR NAVIGATION BETWEEN THE LAO PDR AND THAILAND, DOWNSTREAM OF LUANG PRABANG, BY MRC Bi-lateral Agreement on water transportation between Cambodia and Viet Nam, facilitated by MRC PIANC 125 th Anniversary Celebration in ASIA, Nagoya JAPAN 20 12-14 September 2010

  22. 5. Future Plan • Formulate strategic plan for development of IWT, • Modernize statistics collection system of IWT, • Navigation chart drawing; • Draft inland water transport law, • Enhance the implementation of the Quadripartite Agreement; • Set up national navigation training center; • Improve and harmonize standard of national aids to navigation; • Compile aids to navigation systems and adopt to national standard; • Installation and rehabilitation of MRC and ESCAP recommended system of aids to navigation; PIANC 125 th Anniversary Celebration in ASIA, Nagoya JAPAN 21 12-14 September 2010

  23. PIANC 125 th Anniversary Celebration in ASIA, Nagoya JAPAN 22 12-14 September 2010