Indiana Statewide Model Update, 2030 Forecasts and Levels of Service INDOT Long Range Planning Section prepared by B ERNARDIN, L OCHMUELLER & A SSOCIATES, INC. Cambridge Systematics, Inc. June 18, 2004 Major Topics 2030 Congestion


  1. Indiana Statewide Model Update, 2030 Forecasts and Levels of Service INDOT Long Range Planning Section prepared by B ERNARDIN, L OCHMUELLER & A SSOCIATES, INC. Cambridge Systematics, Inc. June 18, 2004

  2. Major Topics � 2030 Congestion Deficiencies Analysis � Key Assumptions � Evaluation Criteria � Deficiencies � Categorization of Congested Corridors � 2025 Plan vs. 2030 Needs

  3. 2030 Congestion Deficiencies Analysis � Key Assumptions � Analysis period � Percent traffic in peak hour (K factor) � Percent traffic in peak direction (D factor) Approach � Make generous but realistic assumptions � � Greater certainty of deficiencies � Not worst case scenario

  4. 2030 Congestion Deficiencies Analysis � Analysis Period � Average Peak Hour 150 th -200 th highest hour � � K factors � Based on Indiana Data Functional Class K factor Rural Interstates 8.5% Rural Arterials 8.2% Rural Collectors & Locals 7.6% Urban Interstates, Freeways & Expressways 8.2% Urban Arterials, Collectors & Locals 8.0% Source: Gunawardena and Sinha, 1994

  5. 2030 Congestion Deficiencies Analysis � D factors � By functional type Radial – 65% � � Intermediate – 59% � Circumferential – 53% � Rural – 55%

  6. Major Topics � 2030 Congestion Deficiencies Analysis � Key Assumptions � Evaluation Criteria � Deficiencies � Categorization of Congested Corridors � 2025 Plan vs. 2030 Needs

  7. 2030 Congestion Deficiencies Analysis � Evaluation Criteria � Measures of Severity � Level of Service from Volume to Capacity Ratio � Level of Service from Highway Capacity Manual 2000 � Measure of Magnitude � Total Delay (vehicle hours of delay)

  8. 2030 Congestion Deficiencies Analysis � Level of Service by Two Methods � Level of Service by V/C ratio LOS A LOS B LOS C LOS D LOS E LOS F V/C < 0.26 0.26 - 0.43 0.43 - 0.62 0.62 - 0.82 0.82 - 1.00 > 1.00 � Level of Service by HCM 2000 criteria Freeways/Multilane Divided Two Lane Rural Highway Flow Density (pc/lane-mile) Speed/Delay % Following LOS A < 11 None < 35% LOS B 11 - 18 < 9% 35 - 50% LOS C 18 - 26 < 18% 50 - 65% LOS D 26 - 35 < 27% 65 - 80% LOS E 35 - 45 > 27% > 80% LOS F > 45 > 1700 pc/hr

  9. 2030 Levels of Service � Existing plus Committed Network

  10. 2030 Levels of Service � Long Range Plan Network

  11. Major Topics � 2030 Congestion Deficiencies Analysis � Key Assumptions � Evaluation Criteria � Deficiencies � Categorization of Congested Corridors � 2025 Plan vs. 2030 Needs

  12. 2030 Congestion Deficiencies Analysis

  13. 2030 Congestion Deficiencies Analysis � Impact of Long Range Plan on Deficiencies � Deficient road miles reduced from 2,178 to 1,616 � Deficient VMT reduced from 56.4 to 45.6 million � Total system delay reduced from 173,025 to 134,498 vehicle hours

  14. Major Topics � 2030 Congestion Deficiencies Analysis � Key Assumptions � Evaluation Criteria � Deficiencies � Categorization of Congested Corridors � 2025 Plan vs. 2030 Needs

  15. 2030 Congestion Deficiencies Analysis � Magnitude of Congestion: Delay

  16. 2030 Congestion Deficiencies Analysis � Categorization of Congested Corridors � Existing plus Committed Delay LOS E/F LOS D LOS A/B/C Class I 7 2000+ 7 4 2 13 Class II 9 1000+ 5 8 8 21 Class III 19 500+ 9 9 13 31 Class IV 25 250+ 8 20 15 43 Class V 70 0+ 37 141 959 1137 Class VI 156 66 182 997 1245 286 � Long Range Plan Delay LOS E/F LOS D LOS A/B/C Class I 5 2000+ 5 1 2 8 Class II 1 1000+ 0 10 13 23 Class III 18 500+ 6 4 18 28 Class IV 20 250+ 3 14 28 45 Class V 62 0+ 30 106 1005 1141 Class VI 134 44 135 1066 1245 240

  17. 2030 Congestion Deficiencies Analysis � Classes of Congested Corridors Existing plus Committed Long Range Plan

  18. Major Topics � 2030 Congestion Deficiencies Analysis � Key Assumptions � Evaluation Criteria � Deficiencies � Categorization of Congested Corridors � 2025 Plan vs. 2030 Needs

  19. 2025 Plan vs. 2030 Needs � Major statewide corridors � I-70 Improvements meet needs except east of I-465 into Hancock Co. and I-65 common section. � I-65 improvements meet needs from north of Clarksville to I-70 common section (improving US 31 as well) and from SR 267 to Lafayette. � I-65 shows further needs in Clarksville, on the common section with I-70, between I-865 and SR 267, north of Lafayette to SR18/US 231, and in Lake Co. (although US 231 to US 30 looks good). � I-80, I-90, & I-94 all show deficiencies in Lake and Porter regardless of improvements, but improvements do reduce their severity.

  20. 2025 Plan vs. 2030 Needs � Major statewide corridors � I-69 shows deficiencies from I-465 to SR 238, but improvement between SR 238 and SR 32, while the section from SR 32 to I-469 is approaching LOS D. � US 24 Fort to Port project remedies deficiencies east of I-469, and the Hoosier Heartland project eliminates SR 25 deficiency. US 31 projects show improvements, particularly in Hamilton � County. US 231 Jasper-Huntingburg bypasses relieve congestion on � existing route but may create congestion on SR 162 to I-64; projects between SR 46 and Lafayette look good except perhaps a small section on the north side of Greencastle. Deficiencies are now evident north of Lafayette.

  21. 2025 Plan vs. 2030 Needs � Major urban corridors � I-465 projects bring the loop to just about the minimal acceptable LOS (but may require improvement to I-865). � I-64 still shows deficiency in Floyd County but it is reduced by planned improvements. � I-164 may need additional lanes by 2030 given national I-69 traffic. US 41 still shows some, albeit lessened, deficiencies in Terre Haute � and Evansville despite planned improvements. � SR 62 (W. Lloyd Expy.) improvements remove deficiencies. � US 6 Projects address deficiencies in Lake and Porter Cos. � US 40, US 36, and US 136 still generally show deficiencies west of I- 465, and SR 267 begins to show deficiencies as well. � US 50 shows serious deficiencies in Lawrenceburg, Aurora area. � SR 37 and SR 67 (I-69 Corridor) show reduced or eliminated deficiencies to the south of I-465.

  22. 2025 Plan vs. 2030 Needs � Urban corridors � US 421 between SR 334 and SR 32 shows improvement, but south of SR 334 to I-465 and north of SR 32 still show some deficiency. � I-74 may need more capacity on the west out to Pittsboro. � SR 32 widened section looks good, but west of US 31 shows some trouble. SR 238 between SR 67 and SR 37 appears deficient, and SR 38 � likewise between Pendleton and Noblesville. � SR 37 looks good north of I-69 to north of Noblesville but bad from there to Elwood. � SR 39 through the Martinsville area looks good. � SR 130 appears deficient. � US 20 west of US 31 may not meet standards, while the improved section east of the bypass in Elkhart Co. would, but additional improvements may be required further east.

  23. 2025 Plan vs. 2030 Needs � More corridors US 6 begins to show deficiencies from around US 31 east to Ohio. � SR 23 between Edison and Cleveland in South Bend/Mishawaka and � SR 933 along old US 31 in South Bend and between old and new SR 331 show some deficiencies. � SR 19 and SR 13 improvements remedy deficiencies. � US 33 improved southeast of Goshen looks good but improvements may need to go further east. � US 33 improved northwest of I-69 is good, but then after the project’s end shows deficiency to SR 205. � Some sections of SR 1 and US 27 south of Ft. Wayne may become deficient. � SR 3 north of Rushville is improved but between SR 46 and US 50 may become deficient.

  24. 2025 Plan vs. 2030 Needs � More corridors SR 46 projects reduce or eliminate deficiencies throughout its corridor � east and west of Bloomington. � SR 45 improvements outside Bloomington also help there. � SR 60 projects eliminate deficiencies from Clark into Washington Co. � SR 66 improvement in Spencer Co. results in reduced or eliminated deficiencies. � US 50 improvements east of Washington to Ohio eliminate deficiencies in the corridor except in the aforementioned area near Ohio. � SR 62 shows deficiencies between Charlestown in Clark Co. and Lawrenceburg in Dearborn Co.

  25. Thank You!