In the Name of God
Hami Pasargad Kish Petroleum and Refining Company
Introduction • The oil industry as a pioneer economy has a special and basic role in advancing major objectives of the national economy of the IRI Iran in the next 20 years horizon being the motivating engine of national economy, promoting economic diplomacy of IRI Iran, ensuring national security through developing cooperation and regional & international interactions. It is undeniable that it has a share of 28% in GDP, 84% in foreign exchange earnings and more than 95% in supplying primary energy of the country. • The oil industry is one of the main advantages of Iranian economy and it has a major part of the total state budget, so it is appropriate by relying on oil industry, while maintaining state budget independence from oil revenues, provide stable economic development. • Iran by reserving more than 154.58 Billion barrels of coverable liquid hydrocarbons and 33.62 Trillion cubic meters of coverable natural gas is one of the major countries in supplying the world’s energy.
• The study on oil sector indicates that the growth of this industry in various areas has been achieved which this shows the signs of future success and will be promising in the future years. • In this regard in order achieve resistance economy emphasized by our supreme leader and in order to avoid raw retail in the sector of oil and gas condensates ,Hami Pasargad Kish Oil & Refining Company was established at 2013. • This company will be active in the main fields of energy sector which includes oil & gas upstream and downstream , refineries , petrochemical , power , renewable energies and trade and commerce. • This company intends to establish a potent and network share holding including of various companies for recovering the domestic and foreign opportunities in the field of energy sector investment.
Project Introduction Constructing a Complex with the capacity of 25,000 barrels of Gas Condensates at Assalouyeh
Project’s Products
Project’s Economical Indicators
Item Subject Description Unit 1 Amount of Investment in USD Million USD 45 2 Amount of Working Capital 30 Million USD Total Amount of Investment (Static 3 Million USD & Working) 75 4 Total Cost of Prouducts per Year Million USD 264.5 5 Income of Products Sales per Year 303.5 Million USD Products Sales Annual Profit 6 Million USD Prediction 39 7 Payback Period Of Capital 2.5 Years 8 Rate of Payback Period(IRR) 34% Percentage
Breakdown of Product’s Selling Price
Item Products Products Incomes (USD Per Year) 1 Gasoline 76,500,000 2 Gas oil 112,625,000 3 Naphta 81,000,000 Liquid Gas & Low 4 Density Ones 33,375,000
Process and Technical Issues
Process • This process is done as a fractional distillation and according to the analysis (from feed) which has been specified at the laboratory heat is applied on the initial feed and according to the analysis the required products are extracted in certain temperatures .In this system the control on extracted products are in control of the operator which could apply for changes on the type of products and volumes by changing the points of compliances. • In this refining method three factors of temperature , pressure and fracture has been used and special catalysts will be used for the mean of quality improvement and also the fuel usage of units will be supplied from this system. Liquid gas and low density gases which are produced by this system around 24 Tonnes per day will be used as fuel.
Distillation Unit • The distillation unit is as BATCH which in this method by changes in temperature, distillation is carried out and more volume of required products could be derived and also in this system considering the easiness and abundant of performance, the variety of products are plenty because the distillation and boiling point of material are various and since the temperature control is the operator’s authority all the required and designated products could be produced. • The quantity of 10 distillation towers with the capacity of 2500 barrels in three working shifts have been designed.
Feed’s Method of Heating • Heat is applied on the reactor directly with fireproof systems and the produced temperature leads to different boiling points which refines the feeds.
Distillation Duration of Each BATCH and the Duration between two BATCHES • The distillation duration of one refining unit BATCH is six hours and also the duration between two refining units BATCHES is two hours.
Desulfurization Unit • Crude oil and gas condensates consist of mercaptan and sulfur which in this method mercaptan, sulphides , thiophenes and their derivatives are separated in two ways . • 1) With the use of chemicals • 2) With the use of required catalysts
Analysis of Feeds Obtained from Gas Refineries of South Pars Phases
Location of Project Askari Village – Assalouyeh City
Terrestrial Connections Terrestrial Connections • Lengeh Port – Bushehr : Links Assalouyeh to the country’s main highways. • Jam – Firouzabad highway • Parsian Highway :Substantially reduces the distance of Assalouyeh to Shiraz • Subsidiary ways also exist connecting all villages in this area.
Air Distances Air Distances Air distance of project’s area from Kish Island is 170 KM, Chabahar 850 KM and Imam port 621 KM. The distance between this area to Bandar Abbas is 570 KM and to Tehran is 1200 Km.
Proceedings
• Technical / Economical feasibility studies. • Completing records in the Special Economic Energy Zone. • Applying consultants to conduct market studies, environmental studies, technical / economics studies etc. • Holding meetings in the level of management and expert and presenting project in the operating banks in the line of obtaining facilities and preparing preliminary dedicated facilities for manufacturing refinery complex. • Organizing Steering Committee’s project by presentation of Chairman and Managing Director of the Prison’s Cooperative Foundation in the regular meetings. • Identifying contractors and consultants. • Extracting estimation of building’s construction, leveling and consolidation, fencing, road building, equipment foundations ... • Having negotiation with the owners of technical knowledge and receiving technical and financial proposals. • Expert visiting and investigating from land’s project and Holding meetings with local authorities. • Purchasing 10 acres of land at the cost of 40 billion IRI Rials in the public area of Assalouyeh - Askari • Enclosing land and completely consolidating the land’s ownership in the region. • Holding tender, selection of an EPC contractor and making contract with contractors for the project’s process sector. • Complete enclosing and preparation of land for mobilization of workshop.
Item Phase Activity Situation Obtaining the license of gas condensate feed DONE Execution of Technical / Economical feasibility studies DONE Phase Zero 1 Obtaining Project's approval at the board of ……….. DONE Execution of organization structure and company registration DONE Purchase of land DONE Phase One Fencing and enclosing the land 2 DONE Preparing basic drawings and general plan of construction DONE Contract with consultant of designing and contractor of the In progress process sector Land preparation and workshop mobilization In progress Phase Two 3 Detailed drawings preparation NOT DONE Holding tender procedures NOT DONE Contract with contractors NOT DONE Phase Three 4 Implementation of convention NOT DONE Temporary delivery ( test and commissioning ) NOT DONE Phase Four Operation 5 NOT DONE
Obtaining feed’s permission
هاگشیلباپ تیاس
یداهنشیپ هیلوا ییامناج
یرادرب هشقن
یرادرب هشقن
یشک سنفنیمز
نیمز یشک سنف
نیمز یشک سنف
قربیناسر
یناسر قرب
یناسر قرب
و حیطستهاگشیلباپ تیاس ژلبگر
هداج زا حیطست یرگسع یاتسور یلصا هداج ات یسرتسدهبهاگشیلباپ
ژلبگر و حیطست
یرادا تقوم نامتخاس
یرادا تقوم نامتخاس
یرادا تقوم نامتخاس
یرادا تقوم نامتخاس
یرادا تقوم نامتخاس
سنارت1250رپمآ تلو ولیک
ینیچ راوید
ینیچ گنس
یزیر هسام
یزیر نتب
یرادا تقوم نامتخاس تلکسا
یرادا تقوم نامتخاس تلکسا
یرادا تقوم نامتخاس تلکسا
یرادا تقوم نامتخاس
یرادا تقوم نامتخاس