Import to Israel Import to Israel August 2019 Ophir Benjamin Gamliel CEO Address 1 Bat-Sheva St. POB 6117 , LOD 711 6 00 2 Israel Tel 972-8-9186101 Mobile +972543530530 Fax 972-8-9153101 Mail ogamliel@itlglobal.org Web import.itlglobal.org
Import Law in Israel 2007‐2016 ITL Leads the import revolution in Israel’s parliament 2017 Private labs
Changes in Import Standards Law • Opening up of the Import Access to Private Laboratories • Designation of – “Recognized Laboratories” – Testing and COC to SI – “Approved Laboratories” – COC for Market Access
ITL – The Market Leaders Since 1992 Testing Laboratory ‐ ISO/IEC 17025 • 1992 ‐ First safety Lab in Israel ‐ A2LA ILAC‐MRA • IECEE ‐ First • IECEx – First and Only Certification Body CB – ISO/IEC 17065 • IECEx – First and only • IECEE ‐ First • A2LA – ILAC MRA – First & Only ITL Mark • ITL Mark Inspection Body‐ ISO/IEC 17020 • IECEx • OSHA NRTL • 2017 ‐ First ‐ inspection body Natural Gas • Global Partners
ITL Reconitions National National
Import Overview 1.Introduction 2.Country Guideline 3.Certification of Conformity (COC) 4.Import Permit 5.Shipment 6.Conclusions, Q&A
Import service – Electrical products
Guideline - Compliance with Israeli standard • Any product entering to Israel must comply with Israeli Standard – Test Reports is sufficient • Certification Mark is not required for product entry – Can help faster entry to Israel – Voluntary but mandatory for listed products
Country Information • Location: Asia/Middle East • Rated voltage:220-240V • Frequency: 50Hz • Official language: Hebrew • Plug standard: SI 32 – IEC 60884 • Standards - SI adapting mainly International Standards, harmonization whenever possible. 12/09/2019 Slide 10
Main relevant Ministries National National
Import Procedure Stage 1 ‐ Obtain CoC (certificate of Compliance) ‐ Safety and EMC • Recognition = No Testing • Recognition = No Testing • CB Scheme • CB Scheme • MOUs based on ILAC or CB Scheme • MOUs based on ILAC or CB Scheme • Testing ‐ When there is no agreement or a product without • Testing ‐ When there is no agreement or a product without Appropriate Test Reports Appropriate Test Reports • Additional Approval – Ministry of Communication, Health, Energy, • Additional Approval – Ministry of Communication, Health, Energy, Transportation Transportation • Recommended to designate an Importer name at this stage. • Recommended to designate an Importer name at this stage.
Global Recognitions & Acceptance MOUs MOUs between Labs and between Labs and CB CB MRAs MRAs between between countries countries
Partial - ITL Partners (MOUs)
Import Procedure Stage 1 – Localization • Plugs need to be as SI 32 – IEC 60884‐1 • Plugs need to be as SI 32 – IEC 60884‐1 • Plug can be purchased locally • Plug can be purchased locally • Operation/User manuals and Safety Instructions – Hebrew • Operation/User manuals and Safety Instructions – Hebrew • Optional at this stage • Optional at this stage
Import Procedure Stage 2 – Import Permit Before actual shipping, the following is required • Designate a local importer • Designate a local importer • Submit request for Import by the local importer • Submit request for Import by the local importer
Import Procedure Stage 2 – Import Permit • Localization – • Localization – • Voluntary in stage 1 ‐ COC • Voluntary in stage 1 ‐ COC • Required with Shipment for Import Permit – Stage 2 • Required with Shipment for Import Permit – Stage 2 • Operation/User manuals and Safety Instructions ‐ Hebrew • Operation/User manuals and Safety Instructions ‐ Hebrew • Labels – On the packaging only not on Product • Labels – On the packaging only not on Product •Manufacture Name – English allowed •Manufacture Name – English allowed •Manufacturing Year •Manufacturing Year •Country of Manufacturing – Hebrew •Country of Manufacturing – Hebrew •Name of local Importer ‐ Hebrew •Name of local Importer ‐ Hebrew •Importer Address – Hebrew •Importer Address – Hebrew •Registered trademark – English allowed •Registered trademark – English allowed •Optional – Company # •Optional – Company #
Import Procedure Stage 3 – Shipment verification • Upon arrival, Each shipment is being verified • Upon arrival, Each shipment is being verified • The designated laboratory picks up randomly one Sample from • The designated laboratory picks up randomly one Sample from the Shipment for evaluation at the lab. the Shipment for evaluation at the lab. • The sample will be verified against the originally tested product • The sample will be verified against the originally tested product for authenticity for authenticity
Import Procedure Stage 4 – Custom Release • Compliance approval • Compliance approval • The designated laboratory recommend a release from • The designated laboratory recommend a release from Custom electronically. Custom electronically. • Halleluiah = Custom Release • Halleluiah = Custom Release
ITL Mark • True certification mark for easy market access • Save cost on shipping/s • Factory Inspections using CIG format with partners under MOU
Why Choose ITL? • Fast time to market • Widest support of Israel Ministries • Professional service and 27 years of hands on experience – Import department is 100% supported by the experienced team in the safety and EMC labs • Proactive client support during approval process – To avoid complications and delay in shipments.
ITL Partnership Expertise Experience Quality Delivery Market Access You can trust The Market Leaders
ITL Thank You! Ophir Benjamin Gamliel CEO Address 1 Bat-Sheva St. POB 6117 , LOD 711 6 00 2 Israel Tel 972-8-9186101 Mobile +972543530530 Fax 972-8-9153101 Mail ogamliel@itlglobal.org Web import.itlglobal.org
Energy Rating Label Introduction On September 18th, 2008, the Energy Rating Label government decided to promote energy efficiency measures in order to label for air label for refrigerator reduce electricity consumption. As part conditioner of this decision, the government had set a guiding objective ‐ to reduce electricity consumption by 20% until the year 2020. 14.5 cm x 12.2 cm The purpose of this paper is to assess the extent of energy efficiency that can be attained in all sectors; and as a consequence – the energy efficiency programs that should be actualized until the year 2020. Any regulated product can not be imported or put into market without satisfying the efficiency energy requirements in Israel. 12/09/2019 Slide 24
Regulated Products product energy source regulations Israel standard International Standard Description… IEC 60335‐2‐40 ENERGY EFFICIENCY, ENERGY MARKINGS AND ENERGY air conditioner SI 994‐1 ISO 5151‐1994 Description… RATINGS OF AIR CONDITIONERS) 5765‐2004 ISO 13253‐1995 Description… The Energy Sources Regulations (Maximum Electric TV set SI 62087 IEC 62087 Output for a Television Receiver), 5771‐2011 Maximum Electric Output in Standby Mode for Domestic standby mode SI 62301 IEC 62301 and Office Electric Appliances), 5771‐2011 Washing Machines SI 900‐2.7 EN 60456 IEC 60704‐3 Dish Washers SI 900‐2.5 EN 50242 Dryers SI 900‐2.1 EN 61121 Electric Ovens SI 900‐2.6 EN 50304 Energy Resources Regulations(Energy Efficiency and Energy Information of Cooling Appliances) ISO 15502 tropical Refrigerators SI 721 5744 ‐ 2004 environment. Minimal Energetic Efficiency for Indoor Light Bulb) 5771‐ Lamps SI 60432 IEC 60432 2011* TÜV SÜD 12/09/2019 Slide 25
Energy Rating Label Application Requirements Items Requirements 1. Acceptance of test report Reports issued by an approved laboratory 2. Local Representative Required, for permit to release 3. License holder local importer 4. Factory inspection requirement Not required 12/09/2019 Slide 26
Recommend
More recommend