i 5 north coast corridor project phase 1 cm gc flatiron
play

I-5 North Coast Corridor Project Phase 1 (CM/GC) - PowerPoint PPT Presentation

I-5 North Coast Corridor Project Phase 1 (CM/GC) Flatiron-Skanska-Stacy and Witbeck (FSSW) FSSW Joint Venture is comprised of nationally recognized contractors: Flatiron West, Inc. Skanska USA Civil West California District Inc.


  1. I-5 North Coast Corridor Project Phase 1 (CM/GC)

  2. Flatiron-Skanska-Stacy and Witbeck (FSSW) FSSW Joint Venture is comprised of nationally recognized contractors: Flatiron West, Inc. • Skanska USA Civil West California District Inc. • Stacy and Witbeck, Inc. •

  3. Flatiron-Skanska-Stacy and Witbeck (FSSW) Local Contractors • Leading CMGC experienced firms • Significant CALTRANS and SANDAG contracting experience • Dedicated to supporting small, local and minority business •

  4. North Coast Corridor Project Overview • 14 Miles of HOV between L. Santa Fe and Hwy 78 • New Sound and Retaining Walls • Bridge Reconstruction • Pavement Widening and Reconstruction • 4 Miles of LOSSAN Double Track • Rail Bridge replacement • Lagoon Enhancement

  5. NCC PHASE 1 5

  6. What is CM/GC • CM/GC team selected based on qualifications and experience • CM/GC consults with Owner during the design phase • CM/GC evaluates costs, schedule and constructability • Multiple segment GMPs issued for bid

  7. Minority Goals • I-5 Highway and Lagoon Work: DBE Goal for Pre-Construction Services: 5.1 percent • LOSSAN Rail Work: UDBE Goal for Pre-Construction: 5.1 percent • DBE Goals for Construction Services will be determined near completion of Pre-Construction Services

  8. Potential Opportunities Construction Phase • Articulated Concrete Block • GRE Wall Materials • Quality Control • Asphalt Paving • Grind Existing Concrete Pavement • Railroad Signals • Ground Anchors and Soil Nails • Railroad Track Materials • Biological Monitoring • Bridge Concrete Barrier • Guardrail • Reinforcing Steel • Bridge Demolition • Habitat Restoration • Revegetation and Planting • Channel Lining • Rip Rap • Hydrographic Surveys • CIDH Pile • Roadside Signs • Jack and Bore • Clear and Grub • Joint Seal • Roadway Concrete Barrier • Cold Plane Asphalt • Landscape and Irrigation • Shotcrete • Concrete Supply • Masonry • Slope Protection • Construction Area Signs • Minor Concrete • Striping • Driven Pile • Miscellaneous Metal • Survey • Miscellaneous Iron and Steel • Electrical • SWPPP • Environmental Compliance Officer • Overhead Signs • Transparent Soundwalls • Erosion Control • Pipe Supply

  9. Assistance to DBE/UDBE/SBE Firms FSSW is committed to helping Caltrans and SANDAG meet/exceed its • overall U/DBE goals Work packages will be broken down into economically feasible portions of • work FSSW is available to assist subcontractors in obtaining bonding, lines of • credit, and insurance as required Project website to facilitate communication of project opportunities and • events

  10. PROJECT WEBSITE – i5northcoast.com

  11. REGISTER ON THE WEBSITE TO STAY INFORMED

  12. DBE RESOURCES AND WORKSHOPS

  13. Contact Information Flatiron-Skanska-Stacy and Witbeck, a Joint Venture (FSSW) 1770 La Costa Meadows Drive San Marcos, CA 92078 Email: info@i5northcoast.com Phone: (760) 916-9151 FAX: (760) 471-4860

  14. Questions ????