hozhoni automated art easel team 27
play

HOZHONI AUTOMATED ART EASEL Team 27 Abdulrahman Almarri ( Project - PowerPoint PPT Presentation

HOZHONI AUTOMATED ART EASEL Team 27 Abdulrahman Almarri ( Project Manager ) Aly Alharbi ( Web Master) Jarrah Al Bathali ( Contact Client ) Yongzhen Li ( Documentary ) Rakan Alhajraf ( Budget Liaison ) 1 Date: 4/28/2017 Client: Terri Engel


  1. HOZHONI AUTOMATED ART EASEL Team 27 Abdulrahman Almarri ( Project Manager ) Aly Alharbi ( Web Master) Jarrah Al Bathali ( Contact Client ) Yongzhen Li ( Documentary ) Rakan Alhajraf ( Budget Liaison ) 1 Date: 4/28/2017 Client: Terri Engel

  2. ● Overview : ● Project Description. ● Changes made to the project. ● Design Requirement. ● Bill of Materials. ● Customer Requirement. ● Manufacturing. ● Engineering Requirement. ● What we added functionality. ● Designs Considered. ● Testing. ● Design Selected. ● Project Outcome. April 28 ,2017 , Hozhoni Art B, Team 27, Rakan Alhajraf

  3. ● Project Description: ● Main Idea : ➢ Make a device that help adults with disability to draw and paint. ➢ Give them wide options to do their hobby. Support them to be more professional. ➢ ● Sponsor : ➢ Hozhoni Foundation. ● Client: ➢ Terri Engel. 2 April 28 ,2017 , Hozhoni Art B, Team 27, Yongzhen Li

  4. ● Project Description: ● Project supports people with disabilities in artwork. ● Project can be useable by many people with saving electric. ● Project will help them in a creative way. ● Project will let them determine the height that the user want. ● Project is easy to charge and can be in a daily use. ● Project is one of a kind that has never been done in this foundation before. 3 April 28 ,2017 , Hozhoni Art B, Team 27, Abdulrahman Almarri

  5. ● Design Requirements: Design supports people with disabilities while creating art. ● Solution must be comfortable to users. ● Give people with disabilities more options in drawing and painting. ● Provide more opportunities for people with disabilities to explore other art forms. ● 4 April 28 ,2017 , Hozhoni Art B, Team 27, Rakan Alhajraf

  6. Customer Requirements ● Customer Requirements: Safety Easy to store Light weight adjustable Easy To use Comfortable Easy to clean Size Saving time Low cost 5 April 28 ,2017 , Hozhoni Art B, Team 27, Aly Alharbi

  7. ● Engineering Engineering Requirements Requirements : No Sharp Parts Movable Light Material < (20lb) Flexible Simple Design Muscle Less Cleanable Easy to handle Time Low Cost < $600 6 April 28 ,2017 , Hozhoni Art B, Team 27, Jarrah Albathali

  8. ● Designs Considered: 7 April 28 ,2017 , Hozhoni Art B, Team 27, Abdulrahman Almarri

  9. ● Design Selected : 8 April 28 ,2017 , Hozhoni Art B, Team 27, Jarrah Albathali

  10. ● Design Selected : Before After 9 April 28 ,2017 , Hozhoni Art B, Team 27, Abdulrahman Almarri

  11. ● Design Selected: 11 April 28 ,2017 , Hozhoni Art B, Team 27, Rakan Alhajraf

  12. ● Changes Made to the project: ● We have changed the whole idea from Rotational Easel to a Window Regulator Easel. ● We have met some problems with the brake of the rotational easel so we decided to change it by the approve of our client and our instructor. 10 April 28 ,2017 , Hozhoni Art B, Team 27, Yongzhen Li

  13. ● Bill of Material Cost Battery w\ charger $ 76.24 Materials: Tires $ 15.92 Electrical stuff $ 106.05 Wall sticker $ 10.95 Electrical tester $ 15.82 Window Regulator $ 195.72 Screws $ 20.38 Easel $ 13.47 Wood $ 49.3 Corner Brace $ 40.3 Total of expenses $ 544.15 12 April 28 ,2017 , Hozhoni Art B, Team 27, Rakan Alhajraf

  14. ● Manufacturing: We started collecting the parts in the beginning of this semester. ● We started building the base with the stand together. ● Then we started to build the electrical circuit of the regulator. ● ● 13 April 28 ,2017 , Hozhoni Art B, Team 27, Jarrah Albathali

  15. ● Manufacturing: ● Then we did connect the regulator to the stand ● Then we did connect all the wires from the battery to the regulator. ● Then we hid all the wires with the inductors. ● Then we had the wallpaper on the project to give it another look. 14 April 28 ,2017 , Hozhoni Art B, Team 27, Jarrah Albathali

  16. ● What has been added functionality: ● Built a full project, then added the following: ● The battery level tester ● The wallpaper sticker to it. ● The cover of the wires to make it safe for users. ● The University, the Foundation, and the team name to it. ● There were no changes have been done to the project after finishing it. 15 April 28,2017 , Hozhoni Art B, Team27, Aly Alharbi

  17. ● Testing : 16 April 28, 2017 , Hozhoni Art B,Team27, Abdulrahman Almarri

  18. ● Project Outcomes: All the goals of the project were met as demanded. ● The project was working perfect for all the conditions in the foundation. ● Project was built on time. ● Budget was under budget by $600. ● Team met the challenge of advanced mechanical system solution. ● 17 April 28 ,2017 , Hozhoni Art B, Team 27, Aly Alharbi

  19. Questions? 18

Recommend


More recommend