hidraes ingenieros consultores
play

HIDRAES Ingenieros Consultores 39 Avenida 6-55. Km. 9.5 Carretera a - PowerPoint PPT Presentation

HIDRAES Ingenieros Consultores 39 Avenida 6-55. Km. 9.5 Carretera a El Salvador, Montebello I, Santa Catarina Pinula, GUATEMALA PBX: +502 2318-8500 www.hidraes.com estudios@hidraes.com HIDRAES Global Partner in Engineering and Project


  1. HIDRAES Ingenieros Consultores 39 Avenida 6-55. Km. 9.5 Carretera a El Salvador, Montebello I, Santa Catarina Pinula, GUATEMALA PBX: +502 2318-8500 www.hidraes.com estudios@hidraes.com HIDRAES Global Partner in Engineering and Project Development 1

  2. CONTENT Branches……………………… 3 Company Profile …………….. 4 Service Catalog……………… 5 Some figures…………………. 7 Field work ……………………. 9 Roads …………………..…… 10 Integral project development ……………………………..… .11 Outstanding projects……….. 12 Methodology ……………… 16 2

  3. COMPANY PROFILE HIDRAES Ingenieros Consultores we are a global company, strongly internationalized, of Spanish origin with offices in Guatemala and Ecuador and works throughout Latin America. We are dedicated to the Engineering, Consulting and Development of Civil Works Projects. The company serves clients both public and private, of all geographical origin, with special mention to Europeans and Americans, as well as to multilateral entities. The company has worked in numerous fields: road, energy, water and sanitation, building and industrial projects. HIDRAES has a large portfolio of projects carried out, and a staff of senior engineers and engineers with extensive experience in various fields of Civil Engineering. Private Public Roads Engineering Multilateral Energy Entities Consultancy Water and Sanitation Project Industrial works development Edification 4

  4. SERVICES CATALOG HIDRAES Ingenieros Consultores has expert professionals in various branches of engineering, graduates from prestigious universities and with master's degrees in related areas. With experience in the Latin American and European markets, HIDRAES offers its clients services such as: • Engineering studies • Project Identification • Project Feasibility • Technical Review of Projects • Detail Engineering (Final Design) • Tender documents • Supplier Supervision • Owner’s Engineering. Supervision of works • Due diligence • Technical Accompaniment • Independent Engineering • Project development • Location • Processing • Acquisition 5 • EPC control

  5. Roads, bridges and tunnels Engineering Drinking water and sanitation Consultancy Photovoltaic Energy Project WORK AREAS Industrial Civil Works development Wineries and building Supervision and supervision of works Hydroelectric uses Conditioning and project planning 6

  6. THE COMPANY IN FIGURES More of Projects in 50 more than 10 employees and countries collaborators More of 10 years in the Latin American market More of More of 30 15 engineers millions of senior dollars billed 7

  7. More of 25 More of 20 water and sanitation Warehouse and prefeasibility industry designs More than studies 800 km of new or conditioned roads More of 40 More of 10 Geotechnic al studies More of CIVIL building 20 ENGINEERING designs PROJECTS Environmental assessments 8

  8. SPECIFIC AND FIELD WORK Among the tasks carried out by HIDRAES Ingenieros Consultores, it is worth mentioning the analysis of the different traffic indicators in the sections of interest, in order to obtain the most reliable data necessary for the design and evaluation of the road infrastructure. For hydrological tasks, personnel with extensive experience in the design, conservation and expansion of crossing works, drains and similar structures, as well as experts in river capacity and Geographic Information Systems (GIS) are assigned. In the same way, topography works are developed, both in the initial phases of the project and during the construction work itself for control and layout. Regarding geological and geotechnical research, there is a large group of professionals with foundations of different types and tunnels in their professional experience, capable of interpreting the results of calicates, probes and laboratory results. 9

  9. ROADS: HIDRAES carries out road projects (both new opening as conditioning) for different More of Public administrations and for private clients: 800 km The scope of road projects includes all possible aspects: of new or • Field work (topography, geotechnics, hydrology, traffic studies, works inventory, among others.) conditioned • Geometric design roads • Pavement design • Sanitation and drainage • Structures (bridges, frames, vaults, slopes) • Tunnels • Earthworks and slope stabilization • Economic and legal studies More of • Construction supervision 40 • Residential and industrial development • Flood studies. Bridges and • EPC control tunnels The documentation is prepared according to the AASHTO regulations or the reference regulations of the country and reference indexes. More of 20 Road sections 10

  10. INTEGRAL PROJECT DEVELOPMENT: HIDRAES, through its Business Development Department, seeks collaboration with clients interested in the Development of Public and Private Projects (often starting from scratch) in the most comprehensive way More of possible. 300 Among the services offered are: • Location of road projects: planning, evaluation, design, negotiated construction and supervision. land • Negotiation with land owners • Negotiation with financial entities • EPC control • Reports on the regional market in the countries of our competition: Central America and the Caribbean, More of Mexico, Ecuador, Colombia, Peru and Spain 20 For these tasks, HIDRAES has senior engineers supervised and other professionals based in Latin America - suppliers both local and experienced foreigners - with leadership skills, negotiation skills and strongly customer-oriented. 11

  11. FEATURED PROJECTS (I): DETAIL ENGINEERING STUDIES AND TECHNICAL, ECONOMIC, ENVIRONMENTAL AND RISK ASSESSMENT OF THE SECTIONS: Section 1. Rancho de Teja - Momostenango Section 2. Chinchilá Village - San Luis, Petén. Section 3. Tecpán Guatemala - Patzún Section 4. Las Cruces - Bethel Border Post, Petén. Section 5. Station 16 + 740 (Entrance to Paquip) to Station 29 + 440 (Río Motagua). GENERAL DATA COUNTRY: Guatemala CONTRACTING ENTITY: General Directorate of Roads (DGC) Approx. Length: 101.7 Km. 12

  12. FEATURED PROJECTS (II): DETAIL ENGINEERING STUDIES AND TECHNICAL, ECONOMIC, ENVIRONMENTAL AND RISK ASSESSMENT OF THE SECTIONS: RN-12 South Road Improvement, Section: San Marcos - Guativil - El Quetzal - Sintana GENERAL DATA COUNTRY: Guatemala CONTRACTING ENTITY: General Directorate of Roads (DGC) Approximate Length: 50 Km. 13

  13. FEATURED PROJECTS (III): DETAIL ENGINEERING STUDIES AND TECHNICAL, ECONOMIC, ENVIRONMENTAL AND RISK ASSESSMENT OF THE SECTION: Uneven Access to Palencia GENERAL DATA COUNTRY: Guatemala CONTRACTING ENTITY: General Directorate of Roads (DGC) 14

  14. FEATURED PROJECTS (IV): DETAIL ENGINEERING STUDIES AND TECHNICAL, ECONOMIC, ENVIRONMENTAL AND RISK ASSESSMENT OF THE SECTION: Return to Return Elevation - San Lucas GENERAL DATA COUNTRY: Guatemala CONTRACTING ENTITY: General Directorate of Roads (DGC) 15

  15. METHODOLOGY (I) Initial Stage: It consists of a detailed diagnosis, under inspection, description and inventory, of each of the sections. Where the depth of technical engineering studies is defined for the proposal of final designs. Operation Stage: Work done to obtain data prior to design, the logistics plan for its construction: - Topographic surveys of detail, complying with the georeferenced monumentation according to specifications. - Traffic counts - Soil studies and location of material banks, for use. 16

  16. METHODOLOGY (II) Design Based on the initial inventory, we proceeded to: - Horizontal and vertical geometric designs, with the greatest adaptation to the existing and to the proposal of a section of roadway according to results of the operation data. - Design of the pavement structure according to methodologies and standards used internationally. - Design of the drainage works, carrying out a whole hydrological and hydraulic study of the capacity of the existing structures and proposals along the length of each section. - Design of signaling, demarcation and road safety with the use of the Central American Manual of Uniform Signs. Delivery Stage: The following reports were submitted for the construction of the designed section: - Estimated amounts of work. - Unit costs. - Technical specifications and documents of bidding rules of the work. - Risk analysis of structures designed in accordance with the - Central American Manual on Bridge Management, - Environmental Impact Study, thus complying with the requirements established by MARN. 17

  17. HIDRAES Global Partner in Engineering and Project Development Web: www.hidraes.com LinkedIn: https://www.linkedin.com/company/hidraes Facebook: http://www.facebook.com/Hidraes Twitter: @ hidraesing PBX: +502 2318 8500 18

Recommend


More recommend