Hei Hello Bonjour Guten Tag Goude Middag Hey Nín h ǎ o
My name is Jukka Koskinen and I offer project services in Marine and Offshore industry
PROJECT SERVICES Marine & Offshore Industry Project Management, Package Management, EPIC Management, Turn-Key Management, Procurement Management, Purchasing, Technical Purchasing, Engineering Management, Commissioning Management, Inspections, Factory Acceptance Tests, Interface Coordination, Supply Chain Management, Site Management
INTRODUCTION I am a BSc Engineer (mechanical) and MSc Project Manager with over 25 year of work experience in offshore and shipbuilding industry. I am multilingual with excellent communication skills which I have adopted through my long career managing and coordinating international and multicultural projects and site teams in various countries such as Monaco, France, Norway, China, The Netherlands and Finland. I consider myself as an expert managing complex hydro-electric-mechanical applications for offshore and marine industry meeting the most stringent fabrication and instrumentation requirements and standards. I have successfully completed Turn Key projects in owners’, builders’ and manufacturers’ organizations. I am familiar with the relevant marine and offshore rules of classification societies as DNV GL, ABS, LRS and BV. I have an extensive experience working as a project manager, package manager, purchaser, EPIC manager and designer within various large vessel projects (from 100MEUR to 1000MEUR) as CALM Buoy Terminals, Subsea PLEMs, Navy vessels, Passenger Cruisers, Ferries, Container Carriers, LNG tankers, Cable Layers, Subsea Pipe Layers, Topside removal/installation Vessels, FPSOs, Drilling Ships, Platform Supply Vessels and Offshore Wind Farm Platforms.
LINE OF BUSINESS / POSITION • Naval vessels, shipbuilding / Designer • Commercial vessels, shipbuilding / Designer • Commercial vessels, shipbuilding / Purchaser • Commercial vessels, shipbuilding / EPIC (Turn-Key Contracts) Manager • Offshore vessels / Package Manager • Single Point Mooring (SPM) Terminals, Subsea Equipment / Package Manager • Offshore cranes / Project Manager
Typical Standards and Rules; ISO 9001:2008, API Q1-9th Edition, API 6D (ISO 14313), API 6DSS (ISO 14723), ASME, ASTM, EN 10204, ISO 17292, ISO 10497, NACE MR0175 (ISO 15156), DNV 2.22, EN 13852, EU Machinery Directive, PSA, API 2C, NORSOK R-002, ISO 8383, EN81, ATEX, SOLAS, HSE standards in marine and offshore industry Typical Equipment; Diesel engines, HVAC, valves, slewing rings, electrical and hydraulic motors, pipes, fire prevention systems and material, Offshore cranes, pipe handling equipment, lifting platforms, CALM BUOY emerged/submerged valves, PLEM subsea valves, Buoy HPUs, Buoy Central Pipe Units, Buoy Swivels and Chain Stoppers, marine elevators and escalators Typical Tasks; Engineering Coordination, Interface Coordination, HSE Safety and Security, QA/QC Quality Control, Managing supply chain, Managing time-, cost- and scope baselines, Team management, Site management, Purchasing, Expediting, Invoicing & controlling cash flow, Managing communication, Inspections, FATs, SATs, Coordination of the final acceptance, Documentation, Preservation, Delivery and Logistics
FUNCTIONAL SKILLS LANGUAGE SOFTWARE ENVIRONMENT • Autocad • English – fluent • HSE knowledge • Foran • Swedish – good • Microstation • Norwegian – good • Windows • German – fair • MS Project • Chinese – beginner • Axapta • Finnish – native • SAP • French - beginner • Safran
REFERENCES
Dubai Petroleum Establishment (DPE), Client TOTAL New Terminal Project (Djeno), PETRONAS PENAPISAN SDN BHD (MELAKA) Imodco Terminals S.A. Project localisation (Building upon SBM Offshore Terminals Technology) DPE, Upgrading of Fateh Field Offloading System Project title TOTAL Djeno, New CALM BUOY Terminal MELAKA, PETRONAS PENAPISAN SDN BHD Position : Package Manager Ensure that the assigned owner furnished equipment packages (CALM BUOY and PLEM equipment such as Buoy emerged/submerged valves, PLEM Mission’s objectives subsea valves, Buoy HPUs, Buoy Central Pipe Units, Buoy Swivels, winches) are managed, designed, fabricated, installed, tested, preserved, packed, delivered and transported to site and meet requirements stated in contract. From builder’s point of view review and comment vendors’ documents such as drawings, calculations, equipment/material specifications and functional descriptions etc. Review and comment ITP-/FAT- and commissioning Realised tasks procedures. Create/reply reports, NCRs, change requests and technical queries. Monitor and control vendor’s performance and quality accuracy against project time-, cost- and scope baselines. Participate tests, commissioning, and approval process. Coordinate logistics and final delivery. Software/Methods/Environment : MS Project, Windows Office, Autocad Achieved results Material received on site in time, budget and with acceptable quality.
Client Petrobras Project localisation Jurong Shipyard in Singapore, Poland, Norway Offshore cranes for Drilling ship. • 2x Electro Hydraulic Wire luffing Offshore Pedestal Crane, Project title 63T@48M/7,5T@50M • 2x Electro Hydraulic Knuckle boom Offshore Pedestal Crane, 85T@45M Position : Project Manager Mission’s objectives Manage signed project to meet the contractual requirements From manufactures point of view review and comment internal engineering. Review and comment suppliers’ engineering. Create documents such as schedules, specifications and functional descriptions prior procurement, surface preparation and painting procedures, ITP-/FAT- and commissioning procedures and manuals. Create logical equipment packages for procurement, confirm the accuracy of the offered technical and commercial content. Ensure timely and Realised tasks accurate submittal of approval document packages to classification society and client. Create and communicate reports. Create/reply NCRs, changes requests and technical queries. Monitor and control the manufacturing. Ensure safe execution of the project. Monitor and control project performance and quality accuracy against time-, cost- and scope baselines. Coordinate tests, commissioning, approval process, logistics and final delivery. Manage project closure process, reports and lessons learned. Software/Methods/Environment : Inventor, Autocad, MS Project, Windows Office Achieved results Succesfull deliveries in time and budget
Client Total Project localisation Huyndai Heavy Industries, Korea Offshore cranes to Moho Nord FPU project. Project title • 2x Electro -Hydraulic Stiff-Boom Offshore Pedestal Crane, 27T@19M / 8T@33M Position : Project Manager Mission’s objectives Manage signed project to meet the contractual requirements Realised tasks As above. Software/Methods/Environment Inventor, Autocad, MS Project, Windows Office Resultats obtenus Succesfull deliveries in time and budget
Client Allseas Engineering B.V. Project localisation Delft The Netherlands / DSME South Korea / Shanghai China Pioneering Spirit (a vessel for single-lift installation and removal of large offshore oil Project title and gas platforms, and the installation of subsea oil and gas pipelines, 403342 GT). Position : Package Manager Ensure that the assigned owner furnished equipment packages are managed, designed, fabricated, installed, tested and transported to site and meet requirements stated in contract. Offshore Pedestal Crane, 600T@20m / 50T@58m 2x Offshore Pedestal Crane, 50T@33m / 24T@58m Multipurpose Offshore Travelling Crane, 50T@33m / 24T@58m Mission’s objectives Electric pipe handling Offshore Gantry Crane, 100T/10T Electric pipe handling Offshore Gantry Crane, 50T/10T 4x Electric pipe handling Overhead Crane, 100T/10T Electric pipe handling Overhead Crane, 50T/10T 4x Electro-Hydraulic platform lifts, 2.5T From owner’s point of view review and comment vendors’ documents such as drawings, calculations, equipment/material specifications and functional descriptions etc. Review and comment ITP-/FAT- and commissioning procedures. Create/reply reports, NCRs, Realised tasks changes requests and technical queries. Monitor and control vendor’s performance and quality accuracy against project time-, cost- and scope baselines. Participate tests, commissioning, and approval process. Coordinate logistics and final delivery. Software/Methods/Environment : Autocad, MS Project, Windows Office Achieved results Material received on site in time, budget and with acceptable quality.
Recommend
More recommend