HAMPTON HILL MINING NL Presentation 2007 2007
HAMPTON HILL MINING COMPLIANCE STATEMENT The information in the above report that relates to exploration results has been, reviewed and confirmed as accurate by Mr Wilson Forte who is a member of the AusIMM and a competent person as defined in the 2004 edition of the Australian Code for Reporting of Exploration Results Mineral Resources and Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves and has given his consent to its inclusion.
HAMPTON HILL Project Locations MINING
HAMPTON HILL MINING Weld Range Direct Shipping Ore Project (Midwest earning 60%) Jack Hills
HAMPTON HILL MINING Weld Range Direct Shipping Ore Project Weld Range Direct Shipping Ore Project Eastern Iron Ore Lenses Iron ore lense untested Iron ore lense partially tested Western Iron Ore Lenses
Weld Range Direct Shipping Ore Project HAMPTON HILL MINING Midwest Iron Ore Resources
HAMPTON HILL MINING N N Weld Range Direct Shipping Ore Project Recent Midwest drilling results: W45 - 54m @ 55.1% Fe LENS W29 W31 - 66m @ 57.9% Fe LENS W6 W30 - 62m @ 58.4% Fe Iron Ore Lenses Mid Mid Midwest Midwest LENS W20 Hampton/ Midwest Hampton/ Midwest Hampton/ Midwest Hampton/ Midwest promising untested lenses promising untested lenses promising untested lenses promising untested lenses p p p p g g g g 0 2kms
HAMPTON HILL Weld Range Direct Shipping Ore Project MINING •JV with Midwest Corporation Ltd in JV with Chinese company JV ith Mid t C ti Ltd i JV ith Chi Sino Steel Corporation (Midwest earning 60%) Western Iron Ore Lenses Western Iron Ore Lenses •First pass drilling beneath surface hematite returned high grade iron mineralisation •Best result to date:16m @ 59.6% Fe B l d 16 @ 59 6% F •Follow up drilling planned for 2008 Eastern Iron Ore Lenses •All three lenses remain untested 2008 2008 •Extensive drilling campaign to commence in early 2008 •Midwest plan completion of prefeasibility studies by October 2008
HAMPTON HILL MINING Apollo Hill Gold Project JV- Apex Minerals Spending $3million JV Apex Minerals Spending $3million over 3 years to earn 51%
HAMPTON HILL MINING Apollo Hill Apollo Hill Gold Project Main Zone Northern Section 17610N
HAMPTON HILL MINING Mafic Felsic Apollo Hill Gold Project Apollo Hill Gold Project • In excess of $1 million spent on drilling during first year • Including 26 RC and Diamond holes drilled • Including 26 RC and Diamond holes drilled Regional targets • Extending known gold mineralisation • Best intercept 10metres@6.5g/t gold • Regional gold targets to be tested 2008 g g g
HAMPTON HILL MINING Manyingee North Project j Uranium
HAMPTON HILL MINING Manyingee North Project •39 Aircore drillholes on 500 metre grid on 500 metre grid •Buried channels identified •Best results: •Best results: 3m @303ppm U 3 O 8 from 69m incl 1m @507ppm U 3 O 8 Inferred Resource 12,000 tonnes U 3 O 8 •8 Aircore drillholes 8 Ai d illh l on 200 metre grid follow up (awaiting results)
HAMPTON HILL MINING Wheatley Base Metal Wheatley Base Metal Project
HAMPTON HILL MINING Wheatley Base Metal P Project j • Hampton took over management during 2007 d i 2007 • Over $300,000 expended since takeover • Main focus was at Kingsley with 5 diamond holes drilled • Reviewing regional EM anomalies for further drill testing
HAMPTON HILL MINING Murchison Projects Murchison Projects
HAMPTON HILL Murchison Projects MINING Maranoa Bore Meekatharra Glenview Ryansville 20km Weebacarry
HAMPTON HILL MINING Gold Project Weebacarry b W
HAMPTON HILL MINING Weebacarry Gold Project • Aurora recently withdrew from JV • Initial review of data indicates further work required for 2008
HAMPTON HILL MINING Capricorn Nickel Sulphide p p and Sylvania Uranium Projects
HAMPTON HILL MINING Capricorn Nickel Sulphide and Sylvania Uranium Projects
HAMPTON HILL MINING Capricorn Nickel Sulphide •Best drilling results to date: Best drilling results to date: 2 metres@1.36% nickel, 0.62% copper 0.8 ppm platinum •Soil program completed to test extensions of Jimblebar greenstone belt. Results awaited Ji bl b t b lt R lt it d •Seeking JV partner to fund new concepts Sylvania Uranium •Recent - Ground investigation Recent Ground investigation of uranium anomalies. Results awaited •Native Title negotiations for access to prospective eastern anomalies prospective eastern anomalies
HAMPTON HILL MINING Yill Yillaree Nickel Project Ni k l P j JV Breakaway Resources Ltd (Breakaway 81 27%) (Breakaway 81.27%) • Hampton free carried for next $500,000 of expenditure p • Within ultramafic corridor hosting major deposits of Mt Keith,Cosmos and Leinster p , • 2007 activities – 94 RAB, 26Aircore holes for 4510 metres for 4510 metres • 2008 – 61 RAB holes for 2500 metres to test magnetic targets test magnetic targets
HAMPTON HILL 2008 – The Future MINING Weld Range Direct Shipping Ore Project g pp g j • Drilling of untested lenses • Midwest plan to complete prefeasibility study by October 2008 Apollo Hill Gold Project p G j • Drill testing of regional targets Wheatley Base Metal Project • D ill t • Drill testing of regional EM targets ti f i l EM t t Weebacarry Gold Project • Drill testing of targets generated by review of exploration data Leinster Nickel Project • 2,500 metres of RAB drilling over magnetic targets
Recommend
More recommend