Halcombe Community Development Group (HCDG) Annual Plan 2020/21 - PowerPoint PPT Presentation

Halcombe Community Development Group (HCDG) Annual Plan 2020/21 submission November 2019 ANZAC Day Halcombe Community Walkway Halcombe Memorial Hall Halcombe Memorial Hall Approved projects for 2020/21 (as a result of 2019/2020 requests)


  1. Halcombe Community Development Group (HCDG) Annual Plan 2020/21 submission November 2019

  2. ANZAC Day

  3. Halcombe Community Walkway

  4. Halcombe Memorial Hall

  5. Halcombe Memorial Hall

  6. Approved projects for 2020/21 (as a result of 2019/2020 requests) Halcombe Community Walkway – information signs and picnic area TOTAL $17,000 Estimated cost including, design, production and installation of Information signs = $15,000 Installation of picnic tables as per quotes from Recreational Services = $2,000 ‘CBD’/Cenotaph/Rec area development TOTAL $8,200  Tennis Court maintenance – Repair fence to bring up to safety requirements, spray lichen and line mark, 2 new nets $700 = $5,700  Brick work repairs of brick fence between Tennis house and mens toilets = $1,000 Tennis house exterior paint = $1,500

  7. Annual Plan 2020/21 • Community Committee Project Fund (‘$3,000 fund’) • Community Committee Plan Fund (contestable $60K for Community Plan projects) • Other requests to be considered for the 2020/21 Annual Plan • Wastewater Centralisation

  8. Community Committee Project Fund (‘$3,000 fund’) Priority Project Title Project Description Estimated/Quoted Cost 1 ANZAC Day 2020 To be used for the Halcombe Community ANZAC Day $1000 service 2021 2 Welcome packs to new residents $500 Community Communications Phone book update project Signage 3 Other community events Events that bring the community together during the $1,000 year. Some ideas include a Wedding dress evening to e.g. Day or evening get showcase the newly refurbed hall as a wedding venue, togethers Halloween kids disco etc … 4 Walkway To be used to support community input into the walkway. $500

  9. Community Committee Plan Fund & Other Requests. Our Vision: Halcombe village and the surrounding area is a safe, supportive, proud community with a strong heart. It is attractive and connected with appropriate infrastructure and basic services. In summary … Who we are: Halcombe village and surrounding areas. What we are: Safe, supportive, proud, attractive, connected, appropriate infrastructure and basic services. The following are projects that we seek funding for to make this vision a reality.

  10. Community Committee Plan Fund 1. Monteith Street Carpark to Halcombe School Walkway Meeting our vision: Safe, connected Cost: $18,521. Details have been supplied in the original document.

  11. Other requests 1. Monteith Street Carpark to Halcombe School Walkway Meeting our vision: Safe, connected If this is not able to be funded from the Community Committee Plan Fund 2020/21 (Contestable $60,000 fund) then we request that it be funded from other budgets within the 2020/21 Annual Plan.

  12. Other requests 2. Hall re-roofing: Full replacement Meeting our vision: Appropriate infrastructure and basic services Update: • Thank you to Maureen Lambert (HCDG) and James Adamson (MDC). • Work done this year has been effective so far i.e. Flashing between the main roof and the added on piece, fixing the leak in the supper room, work around the fireplace and chimney, the leaking and falling off guttering over the back kitchen window and the flooding that was occurring. Maureen met with Trev (Plumber) 18 th Nov • 2019 and the following was discussed:

  13. Other requests 2. Hall re-roofing: Full replacement Meeting our vision: Appropriate infrastructure and basic services Issue Description Action Front left hand side of hall. Large amount of grass Gutter is old and the join material has probably Grass in gutter and leaking growing in gutter, bending the gutter. Birds are getting perished – all gutters need replacing and bird gutter in behind the guttering. proofing done between roof and gutter. When it rains the water leaks through the joins in the gutter from the side door to front corner of hall. In winter water lies on the path most of the time. The downpipe on the front right hand side of the hall Needs concrete path cut and a pipe put in that Water from downpipe does not have a sump so the water pours across the joins onto a drainpipe that runs along the path footpath. and goes into the stormwater The wood on the back side of the parapet is in a poor Boards need to be replaced. Condition of the parapet condition and not watertight (rotten boards). The flagpole is attached to that and is used. Summary: We would like the re-roof to remain on the longer-term-plan, however for 2020/21 we would the to submit for funding for the above to be done.

  14. Other requests 3. Hall and Playcentre exterior paint Meeting our vision: Attractive, appropriate infrastructure and basic services Cost: $30,000 (estimate)

  15. Other requests 4. Playground/Tennis Courts/ Public Toilets carpark (Willoughby Street) Meeting our vision: Safe, attractive, appropriate infrastructure and basic services

  16. Other requests 4. Playground/Tennis Courts/ Public Toilets carpark (Willoughby Street) Meeting our vision: Safe, attractive, appropriate infrastructure and basic services Cost: $9,022. Details have been supplied in the original document.

  17. Other requests 5. Stanway Road to Gilbert Street Pathway Meeting our vision: Safe and appropriate infrastructure.

  18. Other requests 6. Kimber Street Seal (approx. 250m) Meeting our vision: Appropriate infrastructure and basic services We continue to keep this seal extension request in front of Council for when seal extensions are added back into the budget.

  19. Wastewater Centralisation In a nutshell: • Piping untreated or pre-treated wastewater from 6 villages (Halcombe, Sanson, Rongotea, Awahuri, Cheltenham and Kimbolton) to the Feilding Wastewater Treatment Plant (FWWTP). • Estimated distance = 73km of pipework. • Cost $10m. • Saving $20m over 30 years = $666,667 per year. • The FWWTP has the capacity for X number of houses and Y more ‘Ovations’.

  20. Wastewater Centralisation Earthquake prone buildings: • The Manawatū District has been identified as a high risk area with regards to earthquakes in New Zealand. Ohakea Foam Nightmare: • $12.8m to pipe water to the affected properties (19 – 23 properties based on media reports). • Assumption is they will need less than 73km of pipe.

  21. Wastewater Centralisation OUR QUESTIONS: • All eggs into 1 basket – ‘High -risk ’ area for earthquakes yet we’re planning to run pipelines all over the countryside. It seems counter-intuitive. • Mention has also been made of piping drinking water ‘out’ to the villages when this is done. Cost effective, yes… low risk, no. • $ 10m cost…really ?? • Land based discharge options (Horowhenua examples)? • Alternative technology options? No other options were presented in the LTP 2018-28. • What happens in 50 years when capacity in Feilding runs out? Where to then? • Capital connection charges – how will these become less when we have to start paying for another asset (asset extension) from scratch again??

  22. Wastewater Centralisation We believe this project was ‘lost’ in the 2018 -28 LTP. We ask that Council re-look at the feasibility and logic of this project – ideally re-consulting with the communities before going any further.