12/12/2018 Greater Beloi oit Econom omic Develop opment GBED EDC Annual Investors Meeti eting Decem ember er 12, 2018 2 1
12/12/2018 ABC Supply ply Expa pansion • 132,000 SF Office Expansion • New 4 story building • $30,500,000 Investment • 270 Associates will work there initially with projected growth up to 600 3 New Office 4 Story Office Building 2
12/12/2018 New Office 4 Story Office Building New Office 4 Story Office Building 3
12/12/2018 New Office 4 Story Office Building New Office 4 Story Office Building 4
12/12/2018 9 Seal-R l-Rit ite Door • Manufacturer of High-Performance Residential Doors relocating from Rockford, IL • Leasing 105K SF Spec Building II • 16 Million Dollar Project • 84 New Jobs • WEDC Providing a $250K Tax Credit 10 5
12/12/2018 PMP Americas • Provides Support to the Pulp and Paper Industry • Former Beloit Corp. Subsidiary • Recently purchased and rehabbed 16200 Woodmint Lane in South Beloit – Relocated from Machesney ey Park • 12K Building • 17 Employees 11 Beloit Casino Project • Significant Milestone Achiev eved • November Announcement • Department of Interior published the EIS in the Federal Register • Public Hearing held December 11th • ETA for Federal Approv oval – April 2019? • Governor Review ew <12 Months 12 6
12/12/2018 City Center/ r/ Redevelo lopme pment Activity ity Iron onwor orks Pe Pedes estrian Bridge comp mpleted ed and dedica cated ed to the public 7
12/12/2018 Hotel Goodwin win • 500 Public Avenue • 34 Room Boutique Hotel • Velvet Buffalo Café • Rooftop Meeting Space • 35,000 SF Renovation • $5.2 Million Project • Open BMHS Master Plan - Phase I - Welcome Center Administration Offices • $5.5 Million Dollar Project • 26,000 SF • Construction scheduled to be completed by Summer 2019 8
12/12/2018 Continued Redevelopment of the Ironw nworks IronTek Expansion 8K SF - Complete (35 companies currently - waiting list of 18) Ebates Expansion 25K-35K SF - Complete Acculynx Expansion 12K-22K SF – Complete First National Bank & Trust 22K SF - Complete • Plannin ing and fundrais isin ing phases compl plete - $38 Millio ion • 150,0 ,000 SF compl plete renovatio ion • Offic icia ial demo/buil ildin ing phase began last summer • Constructio ion through 2018 - Compl plete by fall 2019 9
12/12/2018 200 West Grand Avenue ue • Former Kerry manufacturing site • Vacant 10+ years • HCP is transforming the building into a 72-unit upscale apartment building Photo provided by the Beloit Daily News • Studio, One, Two and Three- Bedrooms will be available • Unique floor plans, amenities, and materials (brick, steel, etc.) • $12 Million Investment • Construction starts 2019 Truk't Stree eet Tacos and Blue Colla lar Coffee fee Truk’t Street Tacos • 443 East Grand Ave. • International Tacos • Tequila & Whiskey Bar • Open Blue Collar Coffee • 408 Pleasant St. • Unique/Specialty Coffees & Teas • Craft Pastries • Open Combined creates new 50 jobs 10
12/12/2018 Indust strial rial Develo lopme ment nt Kerry Group Kerry Connect Program • Implementation of the North American Phase with over 70 rollouts already taken place across the globe Program involves the standardization of business processes and • data via a global computer (SAP) System • One of Kerry’s most significant capital investments ever undertaken • 120 additional staff members and 3rd party consultants Program will be headquartered in Beloit with the Kerry Connect • Team occupying 25,000 SF at the Ironworks Complex (SAP)= System, Applications, Products 11
12/12/2018 NorthS hStar Medical cal Radioi oisot otop opes Recently gained approval from the USDA to produce radioisotopes in their RadioGenix System Radioisotopes are used in 10 Million medical diagnostic procedures a year in the US Construction on Phase II including a 20,000 SF 50% complete $9 Million Investment (building only) A Pa Pacific Bearing Company • $10 Million Expansion Project of South Beloit Campus • 66,000 SF New Building • Manufacturing • Office / Support • Cafeteria • $6.25 Million • New Machinery & Equipment • $3.75 Million • 2 Year Project • 70% Complete 12
12/12/2018 Riverside Energy Cent nter Alliant Energy pro roposed natural gas-fueled generating station- Town of Beloit Riverside Energy Center 730 Megawa watt $700 Million investment 60% Complete Current onsite labor force over 700 Fully Operational by early 2020 Fairb rbank nks Morse New 18,000 SF Engine Paint Shop New Security Center $2,750,000 Investment 13
12/12/2018 LCS 29 TO BE NAMED USS BELOIT Graphic provided by the U.S. Navy This graphic illustration shows the future Independence- variant littoral combat ship USS Beloit. The new ship was announced October 9th by U.S. Sen. Tammy Baldwin, D-Wis., and recognizes a partnership between Fairbanks Morse in Beloit and the U.S. Navy since 1938. USS BELOIT SPONSOR MARCIA ANDERSON Retired U.S. Army Major General Beloit Native First Black Woman Promoted to Army Major General Will participate in milestones in the life of the ship Keel laying Launching Commissioning Maintains a lifelong relationship with the ship and crew 14
12/12/2018 COMMERCIAL AL/ RETAIL IL ACTIVIT VITY Casey’s Genera ral Store St Town own of Beloit • 4,700SF • Corner of Prairie Avenue and Inman Parkway ay • Opened Nov ovember 9 th 30 15
12/12/2018 G5 Brewing Company Craft micro brewery- restaurant/bar/beer garden 50-70 full and part-time employees 9,750 SF facility $2.8 Million Inv nvestment Construction underway March opening 31 KDN Hospital italit ity New Holiday Inn Express Hotel • • 6 Stories/84K SF • 124 Rooms • 3022 Ford Street (former Wickes Lumber site) • Outlot Development Opportunities Under Construction – Open April 2019 • 16
12/12/2018 Belo loit it Hotel Gro roup LLC Hilton Home 2 (Extended Stay Hotel) 102 Rooms/64K SF Adjacent to Hampton Inn (Cranston/Milwaukee Road) $11,200,000 Investment Out lot Development Opportunities Open Other Notable Commercial Projects ts Bryden Quick Lube Cornerstone Credit Union South Beloit The Rock Bar and Grill -Outdoor Venue Amenities 17
12/12/2018 Resid identia ial Develo lopment nt Town of Beloit Residen denti tial Deve velopm pment Black ckhawk Ru Run • Single family and duplex mix • 3 units under construction • 50 available Courtney Condos os • Duplex condos • 5 buildings constructed • 6-14 expected in 2019 Glen en Hills • Plat approved • Infrastructure and home construction to begin spring • 36 single-family lots River er Bay Estates es • Mix of single and multi-family units • 1 under construction • 25 available 18
12/12/2018 Single Family Eagles Ridge Subdivision on (Gateway) • New Leaf homes continues to pull permits and build homes • 3 homes under construction • New home values range from $154,000 to $206,000 • Construction on Phase III (22 lots) and extension of Eagles Ridge Drive on hold for winter Elm Grove ve Esta tate Condos 4 Buildings 18 Units (Multi-Family) 28,500 SF Under Construction Leasing first 6 unit building underway Ribbon cutting September 20 th 19
12/12/2018 Hawk wk’s Ridge Apartment nts 1 new building 58 units $11.4M Assessed Value Construction underway Construction of a 7th building being considered Major Infr frastr tructu ture Proje jects ts 20
12/12/2018 I- I-39/9 /90 Expansio sion Funded and under construction Project being advanced by 1 year Most local work will take place 2019-2021 Complete by 2021 including new interchange Town Hall Road Reconstr tructi tion Town wnhall Road from Gateway Blvd going south to near the rail ilroad tracks Compl plete reconstructio ion New pavement & base Curb & gutter Ditches & sidewalk Lightin ing Re-pa pavement from rail ilroad tracks ks to curve Constructio ion compl plete 21
12/12/2018 Gateway Water Extension Creates loop/ p/resil ilien iency in system Prepa pares the Dougan Meadows ws site for future single-f -family resid identia ial South Beloit Wastewater Treatment Plant June 2018 Groundbreakin king $34.7 .7 Millio ion 20% Compl plete Operatio ional 2020 22
12/12/2018 STRATEG EGIC IC INITIA IATIVE IVES Gateway Housi sing Mast ster Planning and Marketing - 15 15 acres es Multi-Fami mily - Master er Plan prepa pared ed - Re Reques est for Propos posals issued ed - 1 propos posal Forward Constructi ction on Grou oup, p, LLC 23
12/12/2018 Concept Plan Vision Beloit Vision Beloit Partners gave up space at 500 Public Ave. to support space needs for the Hotel Goodwin Project. Currently exploring several options for reestablish new Vision Beloit offices • Existing facilities • Existing with additions • New build 24
12/12/2018 ECONOM ONOMIC IC INDIC ICATORS RS 25
Recommend
More recommend