getting to know us getting to know us
play

Getting to Know Us Getting to Know Us July 2008 g Tarpon Systems - PDF document

Getting to Know Us Getting to Know Us July 2008 g Tarpon Systems International Tarpon Systems International LLC Louisiana Location Louisiana Location 9828 Hwy 182 East, Amelia La 985-631-2000 Texas 262 N Sam Houston


  1. Getting to Know Us Getting to Know Us July 2008 g

  2. Tarpon Systems International Tarpon Systems International LLC • Louisiana Location Louisiana Location – 9828 Hwy 182 East, Amelia La – 985-631-2000 • Texas – 262 N Sam Houston Pkwy E., Suite 230, Houston Tx 77060 – 281-260-7500 281 260 7500 • info@tarponsystems.com • www.tarponsystems.com

  3. TARPON SYSTEM TARPON SYSTEM Tarpon Systems International LLC Owns Patents 51 Installations Worldwide Gulf of Mexico (41) W West Africa (5) t Af i (5) S. E. Asia (5) Right Sized Facility Capable of: Installation in Water Depth of 60’ Installation in Water Depth of 60 - 350 350’ Support 8-well Configuration Support Topside Weight up to 350 Tons Process Capacity – 30 MCF Designed to API RP2A to Withstand 100 Year Storm

  4. Right Sized Right Sized Facility for Field Development Facility for Field Development Applications: • High/Low Production Rates – Right Sized for Field Production • Fast Track to Production ast ac to oduct o – 16 weeks Engineering through Installation • Extended/Short Field Production Life – Production Life Considered in Design Stage P d ti Lif C id d i D i St • Minimizes Field Development Cost Without Compromising Safety or Integrity • Ease of Field Abandonment

  5. Commercially Attractive Commercially Attractive • Low Capital Investment • Early Production Availability - Through Stock and E l P d ti A il bilit Th h St k d Pre-owned Equipment • Deployment Opportunity During Drilling Programs Deployment Opportunity During Drilling Programs • Single Point Coordination – Engineering, Fabrication and Installation g g,

  6. COMMERCIAL COMMERCIAL DIFFERENTIATION DIFFERENTIATION • Repeatable Design g • Auto-Cad Drawings Already Standardized • Flexibility Allows Stocking of Number of Components • Simple Fabrication with Use of Standard Material • Pre-owned Equipment Available • Decks, Helidecks and Production Equipment • Ease of Abandonment

  7. Life Cycle Cost Advantages Life Cycle Cost Advantages • Low Capital Expense • Simple Construction • Ease of Installation - Through Proven g Methods • Early Production Capability • Low Abandonment Cost • Recoverable/Reusable Component p

  8. Ease of Installation • Potential Caisson Installation During Drilling Potential Caisson Installation During Drilling Program w/ Drill Rig • Minimization of Offshore / Installation Equipment through Integrated Development Planning • Tarpon Systems Installation Management

  9. Facts About Tarpon • 19 Structures in paths of Hurricane Ivan, Lilly, 19 Structures in paths of Hurricane Ivan, Lilly, Katrina and Rita – No Catastrophic Damage Suffered • 16 Weeks Engineering thru Installation • More Stable Than All Other Similar Designs g • Capable of Larger Deck Loads and Deeper Water Depths Than Competition • Fixed Price Terms

  10. Helideck Deck Boat Landing T Termination i ti Clamp Rod & Block Assembly Caisson Anchor Piles

Recommend


More recommend