Non-Terminal Facilities Naming Convention Patrick Haley – Air Cargo Facilities Manager March 11, 2020
2019 Working Group Presentation March 11, 2020
Improved Communication and Airport Facilities Coordination 3
Non-Terminal Facilities Naming Convention Initial Charge and Challenges – Multiple buildings and facilities – Door/Key Plan was needed for reverting to Port of Seattle reverted buildings ownership – 2017, 2018 – Convention requires Sustainable – Various “historical names” Airport Master Plan (SAMP) growth - Former “United Cargo” Building with Near-Term Project additions - “Drayage” Building - “Amazon” Building – ACC receives maintenance calls, - “BT” Properties which building, where do we go? – Airport Communication Center, – New Port staff are not aware of Aviation Maintenance, Aviation historical or “tribal” names Operations and EMS did not have consistency for calls or work orders 4
Non-Terminal Facilities Naming Convention Current Examples 5
Non-Terminal Facilities Naming Convention Current Examples 6
Non-Terminal Facilities Naming Convention Current Examples 7
Non-Terminal Facilities Naming Convention Initial Charge and Goals – Initial Scope Description and Charge – Cross Departmental Working Group – Establish Facility Naming Convention - 911 Center for short and long term facilities - Air Service Development management - Airport Communications Center – Provide understandable name - Aviation Maintenance Shops & Administration recognition for all affected parties, - Aviation Operations tenants and departments - Aviation Properties Administration – Implementation with strong - Emergency Services (Fire & Police) communication - Engineering General Services – Signage and Wayfinding design & - Facilities & Infrastructure plans; building, AOA and street side 8
Non-Terminal Facilities Naming Convention Project Progress – Initial Working Group Meeting – Jan 2019 – 2019 Maintenance Budget Variance - 25+ physical attendees, multiple Skype call-ins - AVM support (PNTR, CARP, FCWR) - Report to members and Aviation Division Leaders – Capital Small-Works Projects - Concept Review submission - Monument signs, Building Fascia signs - Feedback consolidation & draft presentation – 2019/2020 Air Cargo Facilities Budget – Report to Aviation Directors – May 2019 - Maps, Phone “You are here” cards - F&I, AV Security feedback and updates – Group report and Implementation - Quarter 4 2019 & Quarter 1 2020 9
Non-Terminal Facilities Naming Convention Updated Naming Convention – Building Name numbers aligned with street access – East/West airfield split along 34R/16L – Building Name “Alpha” Character established Clockwise for each street – Building Names/Numbers/Alpha can be added/subtracted as needed – Encompass SAMP/”L” Shape/SASA/West Field Development needs – Update Maximo/Door/Key Plan to four digits with East/West Alpha character first (e.g. 161F [old Cargo 4N] or 168W [future POS AVM campus]) – Building & Pedestal Sign designs for each building 10
Non-Terminal Facilities Naming Convention Updated Naming Convention 11
Non-Terminal Facilities Naming Convention Updated Naming Convention – Examples of the renaming: - Air Cargo 4: 161G with door numbers 161G – 1000 1F - Cargo 4N: 161F with door numbers 161F – 1000 1F - New POS AVM Campus: 168W - Cargo 6: 167A/167B with door numbers 167A – 1000 1F 12
Non-Terminal Facilities Naming Convention Updated Naming Convention – “You are Here” Cards for each tenant 13
Non-Terminal Facilities Naming Convention Updated Naming Convention 14
Non-Terminal Facilities Naming Convention Updated Building Names S 146 th St (permanent structures only) S 167 th St • • NEPL North Warming House: 146A Cargo 6 (16745 Air Cargo Rd): 167A • • NEPL Mid-Warming House: 146C Cargo 6 (16749 Air Cargo Rd): 167B S 168 th St • NEPL Guard House 146D • • NEPL South Warming House: 146E Future West Side Maintenance Campus: 168W S 170 th St • Boeing Company: 146B S 148 th St • West Side Field Office: 170W • “L” Shape Building: 148A, 148B, 148C, etc. • Fire Department: 170A S 154 th St • Doug Fox Parking Facilities: 170B, 170C • Airfield Lighting Control Vault: 154A • E100 Guard Shack 170D • S 188 th St Flying Food Fare: 154B • Sky Chefs, Inc: 154C • Signature Flight Support: 188WA S 156 th St (permanent structures only) • PACCAR: 188WB • Cargo 1: 156A • Future Airport Fire Department: 188WC • Transiplex E: 156B • Snow Shed: 188WD • Transiplex F: 156C • IWS Treatment Plant: 188WE • Transiplex G: 156D • Alaska Airlines Maintenance West: 188F • Transiplex A: 156E • Alaska Airlines Maintenance East: 188G • E190 Guard Shack: 156F • Delta Air Lines Maintenance: 188H S 160 th St • E45 Guard Shack: 188I • FedEx R: 160A • Delta Air Lines Cargo: 188J • Rental Car Facility: 160B S 190 th St • Water Tower Field Office: 160C • Fuel Farm Office: 190A • Gate Gourmet: 160D • SEPL North Warming Shack: 190B S 161 st St • SEPL Gate Shack: 190C • United Airlines Maintenance: 161A • SEPL South Warming Shack: 190D • Bolanos (Future FedEx SEART): 161B S 194 th St • Pump House: 161C • Logistics Buildings: 194A, 194B, 194C • Former BT Properties: 161D • Elcon Corp: 194D • Cargo 4E: 161E • PCS Structures: 194E • Cargo 4N: 161F • Distribution Center: 194F • Air Cargo 4: 161G • Airport Transit Operations: 194G S 165 th St S 196 th St • Alaska Air Cargo: 165A • Training Center: 196A S 166 th St • CBP Cargo Office: 196B • E125 Guard Shack: 166A • Learning Center: 196C • Cargo 4S: 166B • Future Truck Staging Shack: 196D • Air Traffic Control Tower: 166C 15
Thank You! Operated by the Port of Seattle FlySEA.org