evaluate and address the option of removing and replacing
play

Evaluate and address the option of removing and replacing the south - PowerPoint PPT Presentation

Evaluate and address the option of removing and replacing the south school building. Address increased vehicular access parking needs as the enrollment increases and Evaluate the current RTI program needs and the number and size of the


  1. • Evaluate and address the option of removing and replacing the south school building. • Address increased vehicular access parking needs as the enrollment increases and • Evaluate the current RTI program needs and the number and size of the flexible / • Evaluate and address deficiencies in the support spaces (such as the gym, library and Additional Expansion Planning considerations were determined with The Monforton School Expansion 2 Planning P R O J E C T G O A L S A N D O B J E C T I V E S Commituee Members in the Fall of 2012. Enrollment numbers continue to increase and the school is again at full capacity. This Planning needs to anticipate the expansion of school building to accommodate this enrollment growth. The following objectives were identified for the Expansion 2 Planning project: food service areas) for the increased number of students. emergency vehicle access around the school as the school building expands east. small group instructional spaces. MONFORTON SCHOOL - 6001 MONFORTON SCHOOL ROAD, BOZEMAN MT 59718 E X P A N S I O N T W O P L A N N I N G C O M M I T T E E M E E T I N G - O C T O B E R 1 1 , 2 0 1 2 MONFORTON SCHOOL DISTRICT NO. 27

  2. Fire Protection • Current fjre service and domestic water are connected to the local water service. The water main runs downs Monforton Road from the north to the new fjre hydrant to the southeast. • Both Fire Sprinklers and Fire Alarm systems are up to date in the school builidng. E X I S T I N G C O N D I T I O N S Lighting • Power service and system is adequate for normal school activities. The existing ser - vice size is adequate for the next addition. S I T E A N A LY S I S • Light levels at the east exterior of the school have been increased and reconnected at the north parking lot area. Emergency Services • Emergency vehicles currently come from both the north and south. With Monforton School Road closed, there is an emergency vehicle access drive in front of the school. Parking • Pedestrian traffjc, parking, bus & parent drop-off is being improved both at the south and north end of the school building. • Parking spaces have been increased both at the north and south access points to the school and has reduced the number of vehicles parking on the road. • The school property is bi-sected by Monforton Road with no safe crosswalks. Landuse • The property has two levels and is bisected by portions of Monforton Road and the Hubert Ditch. The lower level area adjacent to the school building is becoming too constrained due to the expansion of the building. Transition from the lower level of the site to the upper level should be improved. MONFORTON SCHOOL - 6001 MONFORTON SCHOOL ROAD, BOZEMAN MT 59718 E X P A N S I O N T W O P L A N N I N G C O M M I T T E E M E E T I N G - O C T O B E R 1 1 , 2 0 1 2 MONFORTON SCHOOL DISTRICT NO. 27

  3. 1 ACRE / 100 STUDENTS FINAL BUILDOUT 15 ACRES + Council of Education Facilities Planners Minimum Site Standards MIN. ACRES OF USABLE LAND FOR K - 8TH SCHOOLS: E X I S T I N G C O N D I T I O N S S I T E C O M PA R I S O N ELEM. STUDENT 450 students POPULATION: MIDDLE STUDENT POPULATION: 270 students FINAL BUILDOUT ACREAGE REQUIREMENT: 22.2 acres EASIL Y BUILDABLE TOTAL SITE: SITE: 18.5 acres 24 acres MONFORTON SCHOOL - 6001 MONFORTON SCHOOL ROAD, BOZEMAN MT 59718 E X P A N S I O N T W O P L A N N I N G C O M M I T T E E M E E T I N G - O C T O B E R 1 1 , 2 0 1 2 MONFORTON SCHOOL DISTRICT NO. 27

  4. Civil Items: • The location of the next expansion (at the east) will require the redirection of the on site water fmow at the east side of the building and relocation of the storm drains. • The existing asphalt that remained at the south drop off area should be replaced soon R E C O M M E N D AT I O N S as it is showing signs of deterioration. F U T U R E S PA C E S Structural Items: • If we consider renovating or adding from or to the South portions of the building, will need to consider issues associated with the roof trusses on the 1977 portion of the building. Mechanical Items: • If we continue to use the South Building, we should add fjre sprinkler system to the basement to meet code (or recommend not using the basement at all except for storage). • If we remove the South Building, we will need to relocate the well and irrigation D D D D D D D D D D D F F F F F F F F F F F D D D D D D D D D D D D D D D D D F F F F F F F F F REF. system equipment. F D D D D D D D D F D F F F F F F F F D D D F D F F F F D D D D D D F D F F D D F F F D D D D F D D D D D D D D D D D D D D D D D D D D D D D F D D F F F F F F F F F F D D D D D D D D D D D D D D D D D D D D D D D D D D D D UP P U F F F F F F F F F F F F F F F F F F F F • Will need to evaluate the wells and water connection if we add on to the North Building towards the south. UP UP FD FD • Will need to upgrade the existing boiler pumps (from 3 hp to 5 hp) if we add on to the North Building. • If the Fire Access Lane moves to the west side of the North Building, we should relocated the fjre department access to the riser room (need to verify with the fjre department) Electrical Items: • Improve Site Lighting along new trail – verify with the School. MONFORTON SCHOOL - 6001 MONFORTON SCHOOL ROAD, BOZEMAN MT 59718 E X P A N S I O N T W O P L A N N I N G C O M M I T T E E M E E T I N G - O C T O B E R 1 1 , 2 0 1 2 MONFORTON SCHOOL DISTRICT NO. 27

  5. 37,100 sf 165 sf / student 126 sf / student 132 sf / student S Q . F O O T P E R S T U D E N T C O M PA R I S O N E X I S T I N G C O N D I T I O N S NORTH SOUTH BUILDING: 33,100 sf + BUILDING: 4,000 sf = 2012 BUILDING SPACE: CURRENT CONDITION 295 students 2012 STUDENT POPULATION: 2012 SF PER STUDENT: GUIDELINE SPACE STANDARD FOR REGION: NATIONAL AVERAGE: MONFORTON SCHOOL - 6001 MONFORTON SCHOOL ROAD, BOZEMAN MT 59718 E X P A N S I O N T W O P L A N N I N G C O M M I T T E E M E E T I N G - O C T O B E R 1 1 , 2 0 1 2 MONFORTON SCHOOL DISTRICT NO. 27

  6. EXISTING PROGRAM SPACES Lab S Q . F T. P E R S T U D E N T C O M PA R I S O N K & 1 st Grade CRs: 3,631 ft 2 2 nd & 3 rd Grade CRs: 2,703 ft 2 4 th & 5 th Grade CRs: 2,384 ft 2 F U T U R E S PA C E S 6 th - 8 th Grade CRs: 3,172 ft 2 Small Group / Exceptional: 1,954 ft 2 Span. = Tech Art Music Specialized CRs: 2,940 ft 2 Media center: 1,596 ft 2 Food Service: 1,020 ft 2 Phys Education: 4,928 ft 2 Administration: 1,726 ft 2 MONFORTON SCHOOL - 6001 MONFORTON SCHOOL ROAD, BOZEMAN MT 59718 E X P A N S I O N T W O P L A N N I N G C O M M I T T E E M E E T I N G - O C T O B E R 1 1 , 2 0 1 2 MONFORTON SCHOOL DISTRICT NO. 27

  7. PROGRAM SPACES AT A TYPICAL 300 Lab Current Deficit Small Group/ EXISTING PROGRAM SPACES Small Group/ GUIDELINE STUDENT SCHOOL (132 ft 2 / student) S Q . F T. P E R S T U D E N T C O M PA R I S O N K & 1 st Grade CRs: 3,600 ft 2 K & 1 st Grade CRs: 3,631 ft 2 0 2 nd & 3 rd Grade CRs: 2,700ft 2 2 nd & 3 rd Grade CRs: 2,703 ft 2 0 585 ft 2 4 th & 5 th Grade CRs: 1,800 ft 2 4 th & 5 th Grade CRs: 2,384 ft 2 F U T U R E S PA C E S 272 ft 2 6 th - 8 th Grade CRs: 2,900 ft 2 6 th - 8 th Grade CRs: 3,172 ft 2 354 ft 2 Exceptional: 1,600 ft 2 Exceptional: 1,954 ft 2 Tech Art Music 860 ft 2 Specialized CRs: 3,800 ft 2 Specialized CRs: 2,940 ft 2 Span. Media center: 2,200 ft 2 Media center: 1,596 ft 2 600 ft 2 1,380 ft 2 Food Service: 2,400 ft 2 Food Service: 1,020 ft 2 72 ft 2 Phys Education: 5,000 ft 2 Phys Education: 4,928 ft 2 1,274 ft 2 Administration: 3,000 ft 2 Administration: 1,726 ft 2 2,975 ft 2 total MONFORTON SCHOOL - 6001 MONFORTON SCHOOL ROAD, BOZEMAN MT 59718 E X P A N S I O N T W O P L A N N I N G C O M M I T T E E M E E T I N G - O C T O B E R 1 1 , 2 0 1 2 MONFORTON SCHOOL DISTRICT NO. 27

  8. Current Deficit Small Group / Exceptional: Small Group / Exceptional: PROGRAM SPACES AT A TYPICAL 450 EXISTING PROGRAM SPACES Lab GUIDELINE STUDENT SCHOOL (132 ft 2 / student) tudent) tudent) S Q . F T. P E R S T U D E N T C O M PA R I S O N K & 1 st Grade CRs: 4,500 ft 2 K & 1 st Grade CRs: 3,631 ft 2 869 ft 2 2 nd & 3 rd Grade CRs: 3,600 ft 2 2 nd & 3 rd Grade CRs: 2,703 ft 2 897 ft 2 1,216 ft 2 4 th & 5 th Grade CRs: 3,600 ft 2 4 th & 5 th Grade CRs: 2,384 ft 2 F U T U R E S PA C E S 1,528 ft 2 6 th - 8 th Grade CRs: 4,700 ft 2 6 th - 8 th Grade CRs: 3,172 ft 2 246 ft 2 2,200 ft 2 1,954 ft 2 Tech Art 1,560 ft 2 Music Specialized CRs: 4,500 ft 2 Specialized CRs: 2,940 ft 2 Span. Media center: 4,200 ft 2 Media center: 1,596 ft 2 2,604 ft 2 2,980 ft 2 Food Service: 4,000 ft 2 Food Service: 1,020 ft 2 2,072 ft 2 Phys Education: 7,000 ft 2 Phys Education: 4,928 ft 2 2,874 ft 2 Administration: 4,600 ft 2 Administration: 1,726 ft 2 16,846 ft 2 total MONFORTON SCHOOL - 6001 MONFORTON SCHOOL ROAD, BOZEMAN MT 59718 E X P A N S I O N T W O P L A N N I N G C O M M I T T E E M E E T I N G - O C T O B E R 1 1 , 2 0 1 2 MONFORTON SCHOOL DISTRICT NO. 27

Recommend


More recommend