energy and water efficiency solutions
play

Energy and Water Efficiency Solutions Aashish Sharma DGM Sales - PowerPoint PPT Presentation

Energy and Water Efficiency Solutions Aashish Sharma DGM Sales & Business Development Cell. No. 9826079408 Email: aashish.s@cqm-raj.com C.Q.M. Cooling Quality Management Ltd. founded in 1994, is a company headquartered in


  1. Energy and Water Efficiency Solutions Aashish Sharma DGM– Sales & Business Development Cell. No. 9826079408 Email: aashish.s@cqm-raj.com

  2. C.Q.M. – Cooling Quality Management Ltd. founded in 1994, is a company  headquartered in Israel headquartered in Israel. C.Q.M. is a global provider of on-line mechanical anti-fouling solutions. We fit in  “Make in India” programme of Govt. Of India with our office and works in Pune, I di India. CQM products are developed through in house R & D and patented worldwide,  delivers increased productivity and energy efficiency to facilities such as p y gy y Thermal Power Plants, Oil Refineries, Petro Chemical Complexes, Fertiliser plants, Pharmaceutical Industries, Shopping Malls, Hotels, and Institutions etc. CQM systems are highly acclaimed and well accepted in over 22 countries with CQM systems are highly acclaimed and well accepted in over 22 countries with   more than 10000 units in the field spread over America, Europe, and Asia. All the CQM systems and services are fully compliant with CE Directives, ISO  9001: 2000 and having Green Label Certification Standards. CQM is a member of NAESCO, the US National Association for Energy Services  Companies (ESCO). CQM systems result in energy saving, elimination of costly downtime, extension  of capital equipment life cycle and optimization of heat transfer performance.

  3. CQM Solutions Energy, Water and Ecology Efficiencies e gy, ate a d co ogy c e c es • Up to 4% on power stations • Significant energy savings in industrial processes using heat exchangers • Up to 30% energy savings in HVAC • Up to 30% energy savings in HVAC • More than 50% savings in bleed water of CTs g • 100% savings of refuse water when replacing RO water treatment for CTs • 100% chemical free • 100% re-use of chemical-free water 100% f h i l f t

  4. CQM Solution Overview ATCS ATCS SR SR- -CT CT Improve Efficiency Improve Efficiency Tw o Pronged Approach 1 . Keep Condenser Tubes Clean Autom atic Tube Cleaning System ( ATCS) 2 . Manage W ater Chem istry Scale Rem oval System ( SRS )

  5. Automatic Tube Cleaning System • Condenser Ball cleaning technology has existed for 50 years and is a well accepted principle. • However, CQM has intensified ATCS technology (Patented) to level where it meets fullest potential in (Patented) to level where it meets fullest potential in energy savings contribution.

  6. SRS-CT - How it Works CQM SR-CT CQM SR-CT  Electrochemical Process  Creates High Ph instead of chemical  Free Chlorine Generation  Self Flushing  Redundant Sand Filtration  Scale/Bio/Corrosion Control  Low Cost of Operation

  7. The Problem MUD, ALGAE, HARD SCALE, BIO-FILM, ZEBRA MUSSELS, CLAMS, SEA SHELLS With out CQM

  8. N0 Problem of: MUD, ALGAE, HARD SCALE, BIO-FILM, ZEBRA MUSSELS, CLAMS, SEA SHELLS With CQM

  9. AUTOMATIC TUBE CLEANING SYSTEM (ATCS) All balls are injected at once Balls reach the tube sheet at the a s eac t e tube s eet at t e same time Balls randomly disperse cleaning central and peripheral tubes Ball travel does not interfere with condenser water flow Ball trap with very big open area to collect the balls ll t th b ll No moving parts in ball trap with absolutely zero loss of sponge balls Screen with round holes, balls can not escape No need to count the balls Balls do not pass through the pump Simple PLC operation from the control room

  10. CQM - Power Plant Installations – Last 5 years No. Name Unit No. Capacity Size Cooling BT Type 1 1 Leqing Leqing 4 4 600MW 600MW 88 88" Sea Water Sea Water T T 2 Taizhou 10 300MW 72" Sea Water A 3 Lanxi 2 600MW 88" CT T 4 Changxing 3 300MW 72" CT T 5 Guangan 32 300MW 72" CT T 6 6 Wangting i 1 14 300 300MW 72" 2 C CT T 7 Qingdao 1 300MW 72" Sea Water T 8 Xingjiang 4 200MW 56" CT T 9 Fengtai 1 600MW 88" CT T 11 Changxing 4 300MW 72" CT T 12 Taizhou 9 300MW 72" Sea Water A 13 Leqing 2 600MW 88" Sea Water T 14 Lanxi 4 600MW 88" CT T 15 Guangan 33 300MW 72" CT T 17 17 Xingjiang Xingjiang 3 3 200MW 200MW 56 56" CT CT T T 18 Changxing 1 300MW 72" CT T 19 Zouxian 34 300MW 72" CT T 20 Qingdao 1 300MW 72" Sea Water T 21 Gongxian 1 600MW 88" CT T 22 22 F Fengtai t i 2 2 600MW 600MW 88" 88" CT CT T T 24 Lanxi 3 600MW 88" CT T 25 Guangan 34 300MW 72" CT T 26 Xingjiang 3 200MW 56" CT T

  11. CQM Power Plant Installations Changxing Unit 2 start 11-2010 Unit 1 start 10-2012 Unit 3 start 09-2013 Unit 4 start 02-2014

  12. Changxing Power Plant 3 rd party Energy saving report on unit-2 China Zhejiang Provincial Power Research Institution (Oct 2011)

  13. CQM Power Plant Installations Guangan Unit 32 start 10 -201 2 Unit 33 start 1 1 -201 3 Unit 34 will start 07-2014

  14. CQM Power Plant Installations L Lanxi Unit 2 start 06-2012 i U it 2 t t 06 2012 Commissioning Handing Over Report for 24# Lanxi Unit 4 start 11-2013 600MW unit-3 2 x 88 T CT 1 Unit 3 start 05-2014 Unit 3 start 05-2014

  15. CQM Power Plant Installations CQM Power Plant Installations Power Plant Country MW Application Ball Traps Start Up Bosen Turkey 136 CC Condenser 1x36" & 1x28" 2/28/2000 Zorlu Turkey 120 Condenser 2x24" 1/2/2005 Modern Enerji Turkey 60 CC Condenser 2x16" 6/23/1997 IKPP IKPP I d Indonesia i 300 300 C Condenser d 1 46" & 1 42" 1x46" & 1x42" 11/18/2003 11/18/2003 Haifa Israel (unit stop) Condenser 2x40" 6/15/2006 Energetika KG&TK‐2 Czech Condenser 2x20" & 2x10" 2/1/2007 Energetika TG 12&14 Energetika TG 12&14 Czech Czech Condenser Condenser 2x24" & 2x24" 2x24 & 2x24 6/1/2008 6/1/2008 Energetika TG 32 Czech Condenser 2x20" 7/1/2009 AEM Torino Italy 400 CC Condenser 1x72" 3/12/2004 Hwaseong Korea 529 CC Condenser 1x60" 8/16/2006 Chanqxin #3 China 400 coal Condenser 2x72" 10/31/2010 Bis Enerji Turkey 150 CC Absorption unit 10" 4/18/2007 Soda Sanayii A.S. Turkey 150 Oil cooler 2x3" & 4x4" 6/21/1998 Serang Mill Indonesia Oil cooler 3x6" 6/22/2002 Rotenberg Israel Vacuum pump 1x6" 2/1/2005

  16. Why we are most suitable for India • Most of old power plant may not have ATCS and if i installed may not be working efficiently. ll d b ki ffi i l If used CQM ATCS, increase in efficiency and saving in terms of revenue. terms of revenue • We can customize our system to fit in your existing system. system. • We fit in Make in India programme of Govt. of India – Have full fledged manufacturing unit in Pune, India. g g , • Backed by efficient R&D team in Israel and excellent service team in India.

  17. ATCS is suitable for - All types of power plants. Heat exchangers in refineries. Heat exchangers/ condensers in any Heat exchangers/ condensers in any process industry. Heat e change s/ condense s in fe tilise Heat exchangers/ condensers in fertiliser plants. HVAC / Chillers. 19

  18. Typical HVAC System 1 mm of fouling accumulation in the condenser tubes increases energy consumption by 30% % change in energy consumption (Kwh) per cubic ton at 4 ° C 140% 140% + 30% 130% 120% 110% 100% 100% -1.33E-15 0.3 0.6 0.9 1.2 Grosor del deposito - mm thickness of fouling (mm) Fuente: Philip Kotz, Air Conditioning Heating, Piping and Air Conditioning Journal

  19. CQM – HVAC Installation in India No. Name SystemSize Buildingtype CompletionDate 1 1 Glenmark GenericsLtd.,Gujarat Gl k G i Ltd G j t 8” 8” PharmaIndustry Ph I d t 2011 2011 2 Fourrts Laboratories Ltd.,Chennai 8” PharmaIndustry 2012 3 IPCALaboratoriesLtd.,Ratlam 10” PharmaIndustry 2012 4 S.K.OilIndustriesLtd.,Jalgaon 4” FoodIndustry 2013 5 MaharashtraSolventExtractionPLtd., Dhulia 4” Food Industry 2013 6 ITCSonar,Kolkatta 8” Hotel 2013 7 Infosys,Bangalore 4” Office 2013 8 The MedicityHospital 14” Hospital 2014 9 IHDP ,NewDelhi 8” Office 2014 10 ITCBiscuitFactory,Haridwar 8” FoodIndustry 2014 11 CiplaLtd.,Pune 3” PharmaIndustry 2014 12 EsterIndustriesLtd., Khatima,Bihar 10” ProcessIndustry 2014 13 ITCWelcomeSheraton,NewDelhi 8” Hotel 2015 14 Taj Palace,Delhi 10” Hotel 2015 15 HindalcoIndustriesLtd.,Renukoot,U.P . 6”&10” AluminumIndustry 2015 16 Dinanath Mangeskar Hospital,Pune 8” Hospital 2015 17 HotelRenaissance,Mumbai 10” Hotel 2015 18 HotelJWMarriott,Mumbai 10” Hotel 2015 19 HotelITCGrandMaratha, Mumbai 10” Hotel 2015 20 Dr.ReddyLaboratories,Hyderabad 10” PharmaIndustry 2015 21 TitanCompanyLtd.,Hosur Bangalore 6” WatchIndustry 2016 22 Jindal Polyfilms Ltd.,Nashik 10” PlasticIndustry 2016 23 GodrejIndustriesLtd.,Ankaleswar 4” Industry 2016 24 IMFA, Bhubaneswar(2x60MW) ( ) 36” CaptivePowerplant p p 2013

  20. Typical installations Typical installations ATCS in combine cycle power plant ATCS in combine cycle power plant

Recommend


More recommend