energy absolute
play

Energy Absolute Energy for Future AGENDA Over View 1 Our Power - PowerPoint PPT Presentation

For Q4/2018 Energy Absolute Energy for Future AGENDA Over View 1 Our Power Business 2 Our Biodiesel Business 3 Our Financial Results 4 Our Growth 5 2 E@ at a Glance Established In 2006 to produce palm oil Core Business Energy


  1. For Q4/2018 Energy Absolute Energy for Future

  2. AGENDA Over View 1 Our Power Business 2 Our Biodiesel Business 3 Our Financial Results 4 Our Growth 5 2

  3. E@ at a Glance Established In 2006 to produce palm oil Core Business Energy (Renewable and Utilities) Secondary Market The Stock Exchange of Thailand since 30 Jan 2013 Approximately THB 178.11 billion (US$ 5.57 billion) Market Capitalization As of 1 Mar 2019 1 Jul 2017 15 Sep 2017 18 Oct 2018 Credit Rating Corporate rating : A- Liquidity Free Float 39.87% Closed price : THB/share ‘ 000 shares 80 250,000.00 70 200,000.00 60 50 150,000.00 40 100,000.00 30 20 50,000.00 10 0 0.00 3 3-Jan-18 3-Feb-18 3-Mar-18 3-Apr-18 3-May-18 3-Jun-18 3-Jul-18 3-Aug-18 3-Sep-18 3-Oct-18 3-Nov-18 3-Dec-18 3-Jan-19 3-Feb-19

  4. Shareholder Structure Mr.Somphote Ahunai Chief Executive Officer Edu ducation • MBA from University of Pittsburgh, USA • Bachelor of Engineering from Chulalongkorn University, Thailand Previous s Work ork • Analyst and Researcher in USA. • Managing Director of a Securities Brokerage company in Thailand • Managing Director of a Renewable Energy company in Thailand Mr.Amorn Sapthaweekul Deputy to CEO and Chief Finance Officer Edu ducation • Master of Science from Chulalongkorn University, Thailand • Bachelor of Business Administration Number of Total Shareholders = 17,888 (Finance and Banking) from Thammasat University, Thailand Free Float = 39.86% Previous s Work ork • Investment Banker and Financial Advisor, • Director in a Renewable Energy company 4

  5. Our Business & Group Structure E@ “A leader in alternative energy business, by using the modern technology and environmentally friendly” 2009 2011 2015 2016 2017 2018 2019 Biodiesel EV Car & Electric Ferry Solar Power Wind Power Energy EV Charging B100 Green Diesel & Storage Glycerin PCM Renewable Power Plant 5

  6. AGENDA Over View 1 Our Power Business 2 Our Biodiesel Business 3 Our Financial Results 4 Our Growth 5 6

  7. Electricity Price Structure Ft Base Adder Baht/ Fuel 10 years Tariff kWh Adjustment from COD Charge Solar ind Sola Win Peak eak Time Time: -0.116 Bt./kWh Weekdays For Jan – Apr 2019 t. t. t. 8 8 Bt. 6.5 5 Bt. 3.5 5 Bt. 09.00 – 22.00 4.22 2243 Bt./kWh Lop Lopburi Nak akornsa sawan HKH KH 1 = 36 MWh 8 MWh 90 MWh Until Mar 2027 Off-Peak Time Of Time: Until Oct 2022 Until Dec 2023 Weekdays 22.00 – 09.00 Lam Lampang HKH KH 2& 2&3 3 = 90 MWh + Weekend + Holidays 90 MWh Until Jun 2027 2.35 3567 Bt./kWh Until Feb 2025 Phi hitsa sanulok Han anuman Proj ojects 90 MWh 260 MWh Until Apr 2026 7

  8. Solar Power 278 MW 3 4 Lampang (THB 8.07 bil) Phitsanulok (THB 9.5 bil) Contracted Cap: 90 MW Contracted Cap: 90 MW Installed Cap : 128.396 MW Installed Cap : 133.92 MW Technology: Tracking system Technology: Tracking system COD : 17 Feb 2015 COD : 1 Apr 2016 Land area : 2,354 Rais (930 acres) Land area : 1,800 Rais (732 acres) Adder : 6.50 baht/kwh Adder : 6.50 baht/kwh 2 1 Nakornsawan (THB 6.7 bil) Lopburi (THB 812 mil) Contracted Cap: 90 MW Contracted Cap: 8 MW Installed Cap : 126.126 MW Installed Cap : 9.33 MW Technology: Fixed system Technology: Fixed System COD : 23 Dec 2013 COD : 17 Oct 2012 Land area: 1,858 Rais (735 acres) Land area: 315 Rais (124.5 acres) Adder : 6.50 baht/kwh Adder : 8 baht/kwh 1 acre = 2.529 rais 8

  9. Wind Power 386 MW 1 2 Hadkanghan : HKH Hanuman : HNM (East Coast Southern) (Chaiyaphum) THB 10.4 bil. THB 20 bil. Contracted Cap: 126 MW Contracted Cap: 260 MW COD : SCOD : Q1/2019 HKH 1 = 36 MW COD 3 Mar 17 Adder : 3.50 baht/kwh HKH 2 = 45 MW COD 10 Jun 17 Status: To be COD in 1Q19 HKH 3 = 45 MW COD 23 Jun 17 Project Specification : Adder : 3.50 baht/kwh Technology from Siemens Gamesa, Spain Project Specification : Technology from 103 sets of Wind Turbine  Generator at 2.5 MWh each Vestas, Denmark 70 sets of Wind Turbine Hub height 163 m.   Generator at 1.8 MWh each Blade length 67 m.  Hub height 137 m.  Cut in wind speed = 3 m/sec  Blade length 51 m.  Cut in wind speed = 3 m/sec  9

  10. Output from power production Total Capacity : YOY Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec P90 (Base case) P50 (Best case) Total Capacity : QOQ In n Q4/2018 : : Full operation of 4 Solar Power Plants and 3 Wind Power Plants with the total contract capacity of 404 MWh Power pr production outp output fr from om Wind ind Power Plan lants s QoQ decreased 48.28% due to delaying of monsoon that normally occurs at the end of year (Dec) to the beginning of year (Jan), average capacity factor in Q4/2018 = 21.41% (Q4/2017 = 29.32%) and for 2018 = 26.48% Power pr production outp output fr from om Sola Solar Power er Plan lants s increased QoQ 11.03% and decreased YoY 2.59% there was more rain in this year compared to previous year. 10

  11. AGENDA Over View 1 Our Power Business 2 Our Biodiesel Business 3 Our Financial Results 4 Our Growth 5 11

  12. Biodiesel Production 200 150 100 50 0 2013 2014 2015 2016 2017 2018 Kabinburi Industrial Estate, Prachinburi Location Loc under BOI promotion & privileges • Biodiesel 800,000 Liters per day Plan lant • Pilot production of green diesel/PCM 1 Ton per day apacity Cap • Refined Glycerin 80 Tons per day (by product) • B100 volume 2018 = 158.36 mil.liters decreased 24.04%. • Blending of B100 to high speed diesel = 7-20% • Glycerin volume 2018 = 11.85 mil.kg. decreased 1.41% price increased 12.46% due to stronger demand Add a footer 12

  13. Oleochemicals : Green Diesel and PCM Green Diesel and PCM : Total feed capacity 130 tons/day Total Investment of New Plant in Rayong THB 2 bil.  Started pilot plant in Q2 with production capacity of GD at 1 liter/hour and PCM at 1 ton/day  Phase I : Capacity = 65 tons (feed)/day is during construction, to be completed within Dec 2019  Phase II : To be completed within Dec 2020 Green Diese sel or or Bio o Hyd ydrogenated Diese sel (BHD) : Adv dvance pr prod oduct of of bi biod odiese sel While making free energy from the sun using PV solar; we can turn on and off a reverse cycle air conditioner to push and pull the BioPCM, delivering performance independent of outside air temperatures. BioPCM works as a thermal storage battery and is pre-frozen or warmed for a particularly hot or cold evening . Mat Q24 can deliver the maximum comfort and zero net running costs. Source : http://phasechange.com.au Add a footer 13

  14. AGENDA Over View 1 Our Power Business 2 Our Biodiesel Business 3 Our Financial Results 4 Our Growth 5 14

  15. Strong Growth in Revenue and Net Profit • Tot otal revenue for or 2018 2018 was THB 12,490.22 mil. THB Mil. including accounting gain on a business combination 14,000 (AMITA) THB 894.58 mil. 12,490 11,674 • Tot otal revenue fr from norm normal al ope operation for or 2018 2018 was THB 12,000 10,439 11,595 mil. increased 7.5% 9,212 10,000 • Net pr profi fit fr from om norm normal ope operation for or 2018 2018 was THB 4,080 mil. increased 39.6% 7,601 8,000 • Inc ncremental al ope operating revenue and and ne net pr profi fit resulted from full operation of power business, contributed 6,000 4,975 from 4 Solar Power Plants (278 MW) and 3 Wind Power 3,817 Plants (126 MW) 3,252 4,000 2,955 2,773 2,688 • Suc Successful in in po power busi business s strengthen operating EA’s 1,608 2,000 896 769 cash flow of 2018 to reach THB 7.19 bil.,which is planned to invest in new projects - 2014 2014 2015 2015 2016 2016 2017 2017 2018 2018 Q4/2017 Q4/2018 Revenu nue Net Profit fit 15