egee sa2 terena nrens grids joint workshop
play

EGEE SA2 / TERENA NRENs & Grids joint workshop EGEE09, - PowerPoint PPT Presentation

Enabling Grids for E-sciencE EGEE SA2 / TERENA NRENs & Grids joint workshop EGEE09, 2009-09-22, Barcelona X. Jeannin, SA2 manager www.eu-egee.org


  1. Enabling Grids for E-sciencE EGEE SA2 / TERENA NRENs & Grids joint workshop EGEE’09, 2009-09-22, Barcelona X. Jeannin, SA2 manager www.eu-egee.org ������������������������ ����������������������������������������

  2. Network: the invisible layer Enabling Grids for E-sciencE Logging &Bookkeeping System (LB) File Transfer Service (FTS) LB FTS Workload Management Worker Nodes (WN) User Interface System (WMS) WN WN WN WN WN WMS Computing Element (CE) Storage Element (SE) Storage Element (SE) CE SE • GRID, a complex BDIIServer architecture BDII Logical File Catalog (LFC) � Requiring the Network LFC � The role of network is crucial but its role is invisible in the eyes of the Grid 2

  3. Grid and Network Enabling Grids for E-sciencE • “Networks work fine, QOS seems difficult to achieve and anyway our applications are robust enough to cope with network defect” Grid application people • We need to improve • The Grid network operation • Identifying network trouble, Maintenance, Monitoring, Topology Topology • The access to advance network services • What is available? Where? How can I use it? • The multi-domains challenge � � � � a collaboration NRENs / Grids around pragmatic project • Grid is definitely within the competence of the NREN and the Grid is a major stake for the NRENs but we have to propose better services EGEE’09, 2009-09-22, Barcelona X. Jeannin 3

  4. Agenda Enabling Grids for E-sciencE • Advanced Network Services Session (11:00-13:00) • Requirement of application, access to advanced network services thanks to the middleware. Booking system. AuthoBAHN. • Network monitoring session (14:30-16:00) • The foundation of the collaboration between Grid and network people • Troubleshooting • IPv6 session (16:00-16:30) • Project-wide Network Operation Session (17:00-18:00) • The network is crucial for the Grid project but network operation is primitive (maintenance, ticketing system, bandwidth reservation … ) • Grid middleware session (18:00-19:00) EGEE’09, 2009-09-22, Barcelona X. Jeannin 4

  5. Enabling Grids for E-sciencE Demonstrations planning • 14:00PM-14:30PM: Advanced network services – The Harmony and Phosphorus project (i2CAT) – AMPS : An automatic tool to provision premium IP circuit over European NRENs (EGEE-SA2: GRNET - video) • 16:30PM-17:00PM: Network grid monitoring • 16:30PM-17:00PM: Network grid monitoring – PerfSONAR : monitoring of the LHCOPN (DANTE) • 19:00PM: Grid middleware and Grid Operation – Grid certificate within minutes (NDGF, UNINETT, TERENA, NORDUnet A/S, UNINETT, PDC) – Grid Operation: Ticket normalization (EGEE-SA2: GRNET) EGEE’09, 2009-09-22, Barcelona X. Jeannin 5

  6. Others Demonstrations Enabling Grids for E-sciencE • These other demonstrations will be given during the week ( on demand ) – Network troubleshooting : PerfSONAR Lite TSS: A new light tool for network troubleshooting PerfSONAR Lite TSS: A new light tool for network troubleshooting (EGEE-SA2: FAU) – IPv6 : The 2 first IPv6 EGEE sites (EGEE-SA2: CNRS, GARR) EGEE’09, 2009-09-22, Barcelona X. Jeannin 6

Recommend


More recommend