Drilling to Profit with Extended Reach Drilling Technologies Iain Hutchison CEng MIMechE www.MerlinERD.com
Todays Talk • Merlin ERD • ERD: Unlocking Opportunities • Industry Achievements • Fundamentals • Hole Cleaning • Drilling Loads: Origin & Managing • Soft Issues • Critical Success Factors www.MerlinERD.com
Who is Iain Hutchison? • HWU: Mech Eng, CEng (IMechE) • 25 yr Drilling Engineer • Aberdeen, London, Algeria, Australia • Founder & Principle of Merlin • Spitfire Pilot Tell ‘ em what it’ll take, not why it won’t work www.MerlinERD.com
Who are Merlin ERD? World Leaders in ERD Engineering Support • Independent (no 3 rd party revenue) • Measured by Results • Sakhalin/Qatar/Wytch Farm/Patagonia/ etc • 34 personnel (engineers, associates, rig site support, trainers) Head office Perth, Scotland Operations worldwide: (Caribbean to Australasia) Proudly British, Patriotically Scottish, Globally engaged www.MerlinERD.com
With Who? www.MerlinERD.com
Where? www.MerlinERD.com
ERD: What Value? 1. Marginal Field Development www.MerlinERD.com
Industry Achievements www.MerlinERD.com
Industry Achievements • ExxonMobil Chayvo & Odoptu Fields, Sakhalin Island – Z42: 12,700m MD, 2,344m tvd, 11,732m departure, 73 days – Z43: 12,450m MD, Z42: 38,500’ departure – Z44: 12,376m MD 8 of 10 longest wells in Sakhalin! – OP11: 12,345m MD, 11,475m departure, 60 days • Maersk, Al Shaheen, Qatar : – BD04A: 36,768 ft (11,207m) departure, 36 days • BP, Wytch Farm – M16z: 35,197 ft departure, 5370ft tvd • Total, Patagonia – Cullen Norte 1: 34,728ft departure, 5434ft tvd www.MerlinERD.com
Limited Rig Low rig specs can drill big wells • Maersk, Al Shaheen, Qatar – STANDARD MENA JACK-UP: – BD04A: 36,768 ft (11,207m) departure, 36 days • Apache, West Cycad, Australia – STANDARD JACK-UP: – 22,500 ft md, 5200ft tvd, 29 days D&C • Exxon, California – 18,000 with 800 hp rig, 15 years ago!! You don’t need a big rig! • Screen the opportunities • Identify constraints • Engineer feasibility to spec “What it will take” • Latest technological innovations, teamwork www.MerlinERD.com
Fundamentals 3 Critical Priorities for High Angle Wells Hole Cleaning Hole Cleaning Hole Cleaning www.MerlinERD.com
Hole Cleaning Regimes www.MerlinERD.com
Drilling Loads • BHA & DP weight = > Drag • Stiffness? • Contact Area? (think 1 st principles) www.MerlinERD.com
Critical Success Factors How close to the edge of the cliff are you? How can you tell? Offset Data What is different Modelling (guess) When are extra actions justified? New team Change in design (DP, fluid, inc, azi) Actions prioritised for risks & consequences – No contingencies? www.MerlinERD.com
Hole condition Monitoring www.MerlinERD.com
Project Ahead & AVOID Problems www.MerlinERD.com
Tripping Tubulars & Hole Size 8½” Hole 12¼” Hole 12” Hole & 5” DP & 5” DP & 9½” BHA ` ` ` ```` `` ``` ` ` `` `` ` ` ` ` ` ` ` ` ` ` ` `` ` ` ` ` ` ` ` ` ` ` ` ` ` ` ` ` ` ` ` ` ` ` ` ` ` ` www.MerlinERD.com
Soft Issues - Risk Challenge Identified • Planned • Practiced/Trained • De-Risked www.MerlinERD.com
Problem Cost $ Do NOT want to repeat! Value Lost Time Value Problem Lost www.MerlinERD.com
Performance Value $ Want to repeat! Value Added Time Faster www.MerlinERD.com
Technology Gotchas Stealth Fighter www.MerlinERD.com
Todays Talk • Leverage Experience to D&C 11km wells in 36 days! • Screen Opportunities • Identify the cliff edge & uncertainties • Offset Data quality • Design accuracy (loads) • All drilling loads can be reduced • Latest Technologies – learn from others • Teamwork • (SS-Drlg-Prod-Mgmnt) Ask what it will take, don’t accept why it won’t work! www.MerlinERD.com
Merlin ERD • IADC Manual Update • Government ADT Report • 3 Day ERD Training • Abu Dhabi 03 – 05 March 2015 • Aberdeen 12 -14 May 2015 • London 22 – 24 September 2015 Merlin ERD Limited Perth, UK Tel +44 1738 627922 Email: Dolly.Smith@MerlinERD.com www.MerlinERD.com If we always do what we’ve always done, we’ll only get what we’ve always had! www.MerlinERD.com