Miami-Dade MPO FTAC August 10, 2016 | Miami, FL Carlos A. Castro, District Freight Coordinator Dolphin Truck Travel Center (TTC) PD&E (FM #: 437533-1)
FDOT Mission, Vision and Values The Department will provide a safe transportation system that ensures the mobility of people and goods , enhances economic prosperity and preserves the quality of our environment and communities. 2
Presentation Agenda & Goals Agenda Goals Site Location & Background Provide an overview of the Information project’s background and history 2016 Project Development Introduce the latest site and Environment (PD&E) concepts Study Illustrate the project’s freight Project Delivery Approach benefits / addressing Q & A truck parking shortage Explain the project delivery approach 3
Project Location N 4
Project History 2012 Ongoing 2010 Identified Recommended 2015 Development Developed Dolphin TTC Truck Parking Dolphin Site for of Truck Conceptual Layout Freight PACE Study Shortage Further Study PD&E (SEIR) Parking for Dolphin TTC Parking Study Facilities Develop Recommended Alternative Layout 2016 Dolphin Station Park-and-Ride PD&E (PEIR) Developed Recommended Alternative Layout 5
Planning And Conceptual Engineering (PACE) Study A A Pl Plan anning ning Le Level el Assessmen Assessment For a new Truck Parking Facility and Park-and-Ride Facility FDOT Study Selected sites prioritized by MPO Truck Parking studies N Site feasibility Develop and evaluate conceptual alternatives Recommend layout for facilities Explored potential road connection from PACE Study NW 12 th St to NW 25 th St Conceptual Alternative 6
Project Development & Environment (PD&E) Study Purpose : To advance the development of the Dolphin Truck Travel Center to support freight movement and improve safety. Addresses Deficiencies in: Truck Parking Shortfall Safety Operations Key Stakeholders: Miami-Dade County Miami-Dade MPO Freight & Logistics Community State Environmental Impact Report (SEIR) 7
PD&E Study DRI - Retail Builds upon PACE Study conceptual alternative for truck parking facility ‒ Environmental analysis and concept development Considerations ‒ Neighboring property owners ‒ Adjacent Beacon Lakes DRI development ‒ Dolphin Station Park-and-Ride and Dolphin Station Road Future NW 122 nd Ave ‒ County’s Proposed NW 122 nd Ave Roadway Platting/ Alignment 8
PD&E Preliminary Design Concept Potential NW 122nd Ave Alignment Dolphin TTC Dolphin Station Park-and-Ride NW 12 th St. DRI - Retail 9
PD&E Recommended Altern rnative Elements 147 Total Parking Spaces ‒ 124 Truck ‒ 12 Tandem Truck ‒ 9 Regular Vehicles ‒ 2 Handicap Maintenance Facility with Static Scale Truck Wash with Leaky Load Containment Truck Electrification System Vehicle and Diesel Fuel Pumps 10
Project Updates Preliminary Engineering Report (PER) is almost complete Wetlands ‒ One wetland and one Other Surface Water (OSW) were documented ‒ Estimated functional loss from the proposed Build Alternative totals 8.824 UMAM functional units Endangered Species Biological Assessment ‒ No effect on state listed species ‒ May affect, but not likely to adversely affect, several federally listed species Cultural Resources Assessment Survey (CRAS) ‒ No effect on historic properties listed or eligible for listing in the National Register of Historic Places Contamination Screening Evaluation Report (CSER) ‒ Identified: High ranking for no sites, Medium ranking for 3 sites, Low ranking for 3sites, and No ranking for 2 sites Drainage ‒ Requires extensive onsite retention ponds 11
Project Benefits Enhances Mobility Enhances Economic Development Maximizes economic benefit Comfort and of improved freight mobility Convenience Helps address severe truck Safety and Security parking shortage Capacity Benefits nearby industrial and warehousing businesses Complements other investments in freight mobility 12
Project Delivery Approach 13
Project Delivery Pub Publi lic c Priv Private te Par artne tnership ship Golden Glades TTC + MTF PD&E Reevaluation Dolphin TTC PD&E (SEIR) Florida’s Turnpike Enterprise (FTE ) / FDOT FDOT Effort Effort Design-Build RFP Development Design-Build-Finance-Operate-Maintain RFP Development Golden Glades MTF Golden Glades TTC Dolphin TTC FDOT Effort FTE Effort Advertise & Select Private Sector Partner(s) Design - Build Design - Build Private Sector Partner – Design & Construct Private Sector Partner – Private Sector FTE/FDOT will lease land to Design & Construct Partner – Finance Private Sector Partner FDOT – Finance FDOT to lease land to DTPW Operations & Maintenance Operations & Maintenance Private Sector Partner Responsibility DTPW Responsibility through MOA with FDOT Private Sector Partner will pay FDOT an agreed upon sum 14
Public Private Partners rship Goals Goals Leverage State resources to finance, design and build facility Operator responsible for operations & maintenance ‒ FDOT established performance standards Upgraded level of architecture and landscaping Multiple TTC profit centers ‒ Flexibility for private sector financial feasibility 15
Project Schedule Calendar Year Phase 2013 2014 2015 2016 2017 2018 2019 Public Hearing Planning Project (PACE Study) Advertisement (DBFOM) Dolphin TTC PD&E DBFOM Contract Request for Proposal Execution Development DBFOM Contractor Procurement Design - Build DBFOM : Design-Build-Finance-Operate-Maintain 16 16
QUESTIONS ?
Dolphin Truck Travel Center SEIR – Preliminary Design Concept NW 25 th St. NW 12 th St. 8/10/2016 - Miami-Dade MPO FTAC