Pillar Point Marina Dock H Replacement Built in 1987 (32 years old)
Pillar Point Marina – Dock H Replacement Project Status Contract Award May 2017 Board Presentation August 2017 Public Presentation January 2018 Public Presentation May 2018 65% Submitted Sept 2018 95% Submittal March 2019 Board Presentation March 2019 Combine with Johnson Pier Project? 100% Submittal TBD
Pillar Point Marina – Dock H Replacement Proposed Layout Proposed: 62 berths (35) 50-ft berths – 10 more than existing (26) 50-ft berths Existing: 45 berths (plus 2 end ties) (12) 55-ft berths – 5 more than existing (7) 55-ft berths (plus 2 end ties) (15) 65-ft berths – 4 more than existing (12) 65-ft berths (2) end ties (2) end ties
Pillar Point Marina – Dock H Replacement Furnishings guide pile pedestal hose bibb “Lighthouse” pedestal: Rounded finger pier end Electrical (metered) Existing Guide Pile & Pedestal at Knee Braces all slips: 30A/50A to each slip end tie #1: 30A/50A 50A/100A end tie #2: 30A/50A Water: Integrated hose bibbs (non-metered)
Pillar Point Marina – Dock H Replacement Questions / Comments
Recommend
More recommend