Delivering on the promise of digitalization Rider International August 16, 2018 Never miss a critical step 3 Asset Types Never miss a critical step 2 Data Streams Training Equipment sensors Work planning Competency Control


  1. Delivering on the promise of digitalization Rider International – August 16, 2018 Never miss a critical step

  2. 3 Asset Types Never miss a critical step 2

  3. Data Streams ü Training ü Equipment sensors ─ Work planning ü Competency ü Control systems × Procedural adherence ─ Experience/Currency ü Electronic Data × Procedural performance ─ Safety performance Recorder ─ Safety system/control of work ─ Productivity ü Electronic Telemetry performance ─ Barrier management ü Alarm management system Never miss a critical step 3

  4. Never miss a critical step 4

  5. Benefits: Operator • Digital handover • Contract management • Well planning to well • Workforce readiness construction • Procedural adherence • Bridging document integration • Safety barrier visibility • Performance vs AFE Never miss a critical step 5

  6. Operator Dashboard Never miss a critical step 6

  7. Benefits: Drilling Contractor Management • Actionable Information • Performance Improvement • Workforce readiness • Invisible lost time • Invisible risk • Safety barriers • Incident investigation in “replay” • Operational productivity mode • Predictive maintenance Never miss a critical step 7

  8. Contractor Dashboard Never miss a critical step 8

  9. Benefits: Drilling Contractor Operations Never miss a critical step 9

  10. Preparing to Run in the Hole Action Data Set Visibility Define job to be done, with safety and productivity Work plan, O, DCM, DCO expectations procedures Crew assigned to job, with capabilities Workforce O, DCM. DCO (DR, AD, TP , FH, DH) Job preparations: trip sheet, pipe tallies, equipment Equipment, DCM, DCO checks, equipment setpoints, set alarms, etc. workforce, procedures Safety procedures: Haz-IDs, Toolbox talk, safety barrier Equipment, O, DCM, DCO check workforce, procedures Never miss a critical step 10

  11. Running in the Hole with Event Action Data Set Visibility Start RIH procedure Workforce, DCM. DCO procedures Pick up stand and make up to torque Equipment, DCM, DCO workforce, procedures Check casing pressure before opening blind rams Equipment, DCM, DCO procedures EVENT: Positive Casing Pressure Equipment O, DCM, DCO RIH procedure interrupted, casing pressure procedure Workforce, DCM, DCO initiated, procedures distributed to workforce procedures Never miss a critical step 11

  12. Breakout Procedures Action Data Set Visibility Safety barriers maintained, perform diagnosis Equipment, DCM, DCO workforce, procedures Relieve pressure, parameters within acceptable range Equipment, DCM, DCO workforce, procedures Resume RIH procedure Workforce, O, DCM, DCO procedures Show productivity variance and why Equipment, O, DCM workforce, procedures Never miss a critical step 12

  13. Current State • Progress to Date • Rider deployed on 15 drilling rigs and an LNG plant • Rider 360 proof of concept complete • Next Steps • Rider 360 testing on simulator in September • Looking for contractor and operator for joint pilot project Never miss a critical step 13

  14. Going to Market • MVBs (Most Valuable Benefits) • Benefit/Cost sharing • Product and service mix Never miss a critical step 14

  15. Thank you! www.ridercorp.com Netherlands United States +31 20 261 8330 +1 713-298-5741 Diamantlaan 15 5847 San Felipe, Ste 1700 2132 WV Hoofddorp Houston, TX 77057 Never miss a critical step 15