Current Development of JCM Scheme in Indonesia 1
Presentation Outline • The JCM inception • JCM Stakeholder • JCM Financing • Project Status • Status of feasibility studies • JCM Infrastructures • City-to-City cooperation under JCM scheme • Sustainable development criteria • Communication and M&E activities 2
JCM development in Indonesia 2015 2010 Implementation of the first JCM informal meetings JCM REDD+ project in between Government of Indonesia Indonesia and Japan 2014 2011 • Indonesia JCM Secretariat JCM formal meetings with established under the Coordinating Ministry for National Climate Change Economic Affairs Counsil and related • First JCM project in Indonesia ministries and in the world is registered 2013 2012 Bilateral Agreement on JCM Establishment of the cooperation between Coordination Team for Indonesia and Japan is Inter-State Carbon Trade signed on the 26 th August Negotiation (TKPPKA ) 2013 3
The JCM Stakeholder Government of Japan Government of Indonesia JCM Joint Joint Committee members Joint Committee members Japan Committee Indonesia Japanese JCM Secretariat Communication New Japanese Project FS/project Participant proposal JCM Projects in Indonesia Indonesian Project Indonesian Partner Participant Candidate 4
Structure of the Indonesia Joint Committee CMEA Joint Committee : Ministry of Ministry of • National Co-Chair by Foreign Development the Assistant Affair Planning Deputy Minister for Multilateral JCM Ministry of Economic Indonesia Environment Coordinating Cooperation Secretariat and Forestry Ministry for and Financing Economic Affair (CMEA) of CMEA • Co-Chair Consists of 10 Director-level Ministry of members from Ministry of Environment 7 Ministries Industry and Forestry and JCM Secretariat. Ministry of Energy and Ministry of Finance Mineral Resources 5
Statistic of the JCM Stakeholders Private sector 81 have joined JCM scheme from Japan (including FS and projects) side Indonesia Government state owned 3 have joined JCM projects of Indonesia companies Private sectors in Local government JCM Private Government 28 have joined JCM projects sectors from of Japan Indonesia side Third party 10 designated JCM TPEs entity 6 *as of November 2015
JCM Financing Scheme in Indonesia Since 2010 it has leveraged around more than US$ 107 million investment in the low- carbon development Since 2010, JCM has mobilised grant from the Japanese government around US$ 41 million for low-carbon development in Indonesia 7
Projects in the Pipeline Energy saving for textile factory Solar power hybrid system facility cooling by high efficiency installation to exisitin base centrifugal chiller transceiver stations in off-grid area Upgrading to air-saving loom Energy saving REDD+ Model Project in at textile factories by double Boalemo District bundle-type Introduction of high efficient heat pump Energy saving by optimum Old Corrugated Cartons operation at oil refinery Energy saving by introduction of high Process at Paper Factory efficiency once-through boiler system in Energy savings at a film factory Remote auto-monitoring convenience store system for thin film solar Installation of Gas Co- power plant in Indonesia Generation System for Automobile Manufacturing Plant Energy Saving for Shopping Mall with Utility facility operation Energy saving for office High Efficiency Centrifugal Chiller optimization technology Industrial Park with Smart Energy saving for air LED Street Lighting System conditioning and process + Energy saving through introduction of Power generation by + cooling at textile factory regenerative burners to the aluminum waste heat recovery in holding furnace of the automotice cement industry 17 = 14 2 1 REDD+ components manufacturer Energy Renewable efficiency energy projects 8
Registered Projects Energy Saving for Air-Conditioning and Process Cooling by Introducing High-efficiency Centrifugal Chiller • Ebara Equipment & Systems and PT Primatexco Indonesia • Estimated total emissions reduction of 799 tCO 2 eq. by 2020 Project of Introducing High Efficiency Refrigerator to a Food Industry Cold Storage in Indonesia • Mayekawa MFG Co., Ltd and PT Adib Global Food Supplies • Expected total emission reduction of 845 tCO 2 by 2020 Project of Introducing High Efficiency Refrigerator to a Frozen Food Processing Plant in Indonesia • Mayekawa MFG Co., Ltd and PT Adib Global Food Supplies • Expected total emission reduction of 151 tCO 2 by 2020 9
FS in Indonesia (2010-2015) CCS 1 5 3 10 4 Low-carbon city 25 5 3 22 3 35 10
JCM Indonesia Infrastructures Since JCM establishment in 2013, it has developed several guidelines, procedure, rules, registry system and methodologies Procedure: Guideline: Rules: 1. Project Design 1. Project Cycle Document 1. Rules of Procedure 2. Proposed Implementation Methodology 2. Rules of 3. Third Party Entity Procedure 4. Validation and Verification Registry system: 5. Sustainable Development Develop with the collaboration with IGES and Implementation it is expected to connect with the National Plan and Report Registry 11
JCM Methodologies in Indonesia The role of Indonesia JCM Secretariat in the proposed methodologies review: • Experts review • Using methodology review form • Discussion meetings between related ministries • Prepare website for public comment 10 Approved Methodologies 1. Power Generation by Waste Heat Recovery in 7. GHG emission reductions through optimization Cement Industry of boiler operation in Indonesia 2. Energy Saving by High-Efficiency Centrifugal 8. Installation of a separate type fridge-freezer Chiller showcase by using natural refrigerant for grocery store to reduce air-conditioning load 3. Installation of Energy-Efficient Refrigerators inside the store Natural Refrigerants at Food Industry Cold Storage and Frozen Food Processing Plant 9. Replacement of conventional burners with regenerative buners for aluminum holding 4. Installation of Air-Conditioning for Grocery Store furnaces 5. Installation of LED lighting for grocery store 10.Introducing double-bundle modular electric 6. GHG emission reductions through optimization heat pumps to a new building 12 of refinery plant
Current development of City-to-City cooperation Surabaya & 1. Energy management in buildings 2. Waste management Kitakyushu Sister city 1. Energy 1. Energy efficiency in management airport Batam & Bandung & in buildings Yokohama Kawasaki 2. Energy 2. Waste efficiency in Management WWTP 3. Street lamps 3. Biomass energy 13
SD Criteria – Proposal from the Government of Indonesia Why we push SD criteria to be part of JCM? 1. One of the JCM purpose is to contribute to sustainable development Social 2. Indicator is needed to evaluate achievement in JCM. 3. Ensure every JCM project will deliver co-benefit for Environment Indonesia. Economic 4. To fulfill global standards for appropriate climate change mitigation action under the UNFCCC Technology 5. Enforcement of sustainable development criteria suitable for Indonesian conditions SD implementation plan (SDIP) will be submitted during request of registration SDIP is assessed during request of issuance 14
Communication and M&E activities 1 2 3 Information sharing Meetings Site visits Way of communication between project participants, Indonesia government, and Japan government Ensure PP from both sides understand JCM scheme: • PP from Japan probably understands JCM scheme, but not host country’s regulation • PP from Indonesia may not know the collaboration they are going through with their Japanese partner(s) is under JCM scheme. 15
Communication and capacity building Business Forum Brochure Participating in Indonesia Pavilion COP 20 Peru, Lima 16 Booklet
Merci beaucoup! Terima kasih! Our website: www.jcmindonesia.com Contact us at secretariat@jcmindonesia.com Sekretariat JCM Indonesia Gedung Kementerian BUMN lantai 18 Jl. Medan Merdeka Selatan 13, Jakarta 10110 17