CR 455 Extension Project Development and Environment (PD&E) - PowerPoint PPT Presentation

CR 455 Extension Project Development and Environment (PD&E) Study RSQ 17-0014 1 June 20, 2019 WELCOME Alternative Concepts Public Workshop June 20, 2019 Open House Format Presentation Runs Every 10 Minutes 2 Clermont Arts &


  1. CR 455 Extension Project Development and Environment (PD&E) Study RSQ 17-0014 1 June 20, 2019

  2. WELCOME Alternative Concepts Public Workshop June 20, 2019 Open House Format Presentation Runs Every 10 Minutes 2 Clermont Arts & Recreation Center 3700 S. Highway 27, Clermont, Florida 34711 5:30 p.m. to 7:30 p.m.

  3. CR 455 Extension Project Development & Environment (PD&E) Study 3 Project Background The need for improvements was identified by several entities. Lake-Sumter Metropolitan Planning Organization (MPO) • 2035 Long Range Transportation Plan • Identified the need for an additional north-south corridor • Wellness Way Area Plan (WWAP) • Identified as an area with significant economic development opportunities • Mix of residential, commercial, office, education, medical and recreational • uses to provide employment in Lake County Identified a north-south corridor extension of CR 455 •

  4. CR 455 Extension Project Development & Environment (PD&E) Study 4 What is a PD&E Study? A Project Development and Environment (PD&E) Study is an environmental and engineering process used to document social, economic, and environmental impacts associated with a proposed transportation improvement project.

  5. CR 455 Extension Project Development & Environment (PD&E) Study 5 Study Area

  6. CR 455 Extension Project Development & Environment (PD&E) Study 6 Existing Traffic Conditions (2018) Level of Service A Level of Service F Free flow traffic Forced flow traffic

  7. CR 455 Extension Project Development & Environment (PD&E) Study Existing Traffic Volumes (2018) 7 Average Daily Roadway From To Traffic (vpd) U.S. 27 Hartwood Marsh Road Schofield Road 25,500 Hancock Road S.R. 50 Johns Lake Road 20,087 Johns Lake Road Hartwood Marsh Road 11,175 Lake/Orange County Hartwood Marsh Hancock Road 12,123 Road Line Lake/Orange County Schofield Road U.S. 27 198 Line

  8. CR 455 Extension Project Development & Environment (PD&E) Study 8 Future Traffic Conditions No-Build Scenario (2045)

  9. CR 455 Extension Project Development & Environment (PD&E) Study Future Traffic Volumes (2045) 9 No-Build Scenario Average Daily Roadway From To Traffic (vpd) % Change U.S. 27 Hartwood Marsh Road CFX Connector 62,063 143% Hancock Road S.R. 50 Johns Lake Road 28,577 42% Johns Lake Road Hartwood Marsh Road 23,484 110% Hartwood Marsh Road Wellness Way 22,458 - Hartwood Marsh Hancock Road CR 455 Extension 20,669 70% Road Lake/Orange County CR 455 Extension 13,012 7% Line Lake/Orange County Wellness Way U.S. 27 31,655 - Line Lake/Orange County Schofield Road Hancock Road 11,449 5682% Line CFX Connector U.S. 27 S.R. 429 22,645 -

  10. CR 455 Extension Project Development & Environment (PD&E) Study 10 Purpose and Need of the Corridor Sustain projected future growth while providing additional ▪ multimodal options Provide a long-term north-south corridor for southeast Lake ▪ County Provide a regional link between areas of the county ▪ Identified in Lake-Sumter MPO 2035 Long Range Transportation ▪ Plan and Lake County’s Wellness Way Area Plan Direct connection to other proposed roads ▪

  11. CR 455 Extension Project Development & Environment (PD&E) Study 11 Public & Neighborhood Meetings Public Concerns ▪ Impacts to rural character ▪ Environmental impacts ▪ Divided Community ▪ Property value ▪ Project need ▪ Planned developments in Wellness Way Area Plan

  12. CR 455 Extension Project Development & Environment (PD&E) Study 12 Additional Stakeholder Input ▪ Coordination Meetings o Property Owners o Water Conserv II o Central Florida Expressway (CFX) Authority ▪ Emails ▪ Website Comments ▪ Letters

  13. CR 455 Extension Project Development & Environment (PD&E) Study 13 13 Typical Section – 4 Lanes

  14. CR 455 Extension Project Development & Environment (PD&E) Study 14 Traffic Analysis (2045) CR 455 Extension Corridor

  15. CR 455 Extension Project Development & Environment (PD&E) Study Alternatives Overview 15 15 Purple Green Yellow Blue Pink

  16. CR 455 Extension Project Development & Environment (PD&E) Study CR 455 Purple Alternative 16 16 Overall North Detail South Detail

  17. CR 455 Extension Project Development & Environment (PD&E) Study CR 455 Green Alternative 17 17 Overall North Detail South Detail

  18. CR 455 Extension Project Development & Environment (PD&E) Study CR 455 Yellow Alternative 18 18 Overall North Detail South Detail

  19. CR 455 Extension Project Development & Environment (PD&E) Study CR 455 Blue Alternative 19 19 Overall North Detail South Detail

  20. CR 455 Extension Project Development & Environment (PD&E) Study CR 455 Pink Alternative 20 20 Overall North Detail South Detail

  21. CR 455 Extension Project Development & Environment (PD&E) Study CR 455 Alternatives Evaluation Matrix 21

  22. CR 455 Extension Project Development & Environment (PD&E) Study 22 Project Benefits Objectives Opportunities Provide short-term improvements that will Coordinate with other ▪ ▪ improve safety FDOT/County/City projects Support the Wellness Way Area Plan ▪ Joint use ponds ▪ Select a corridor that accommodates a four- ▪ Improved traffic safety ▪ lane divided facility and meets standard criteria Continuous north/south corridor ▪ Develop an improvement that is consistent with ▪ Alternate emergency evacuation ▪ projected growth route Balanced project approach ▪ Pedestrian/bicycle amenities ▪ Context sensitive design ▪ On-going stakeholder engagement

  23. CR 455 Extension Project Development & Environment (PD&E) Study 23 Project Schedule Notice to Proceed | March 2018 Alternatives Workshop | June 2019 Preferred Alternative Meeting | October 2019 Public Hearing | December 2019 Document Closeout | January 2020

  24. CR 455 Extension Project Development & Environment (PD&E) Study 24 Stay Informed! Stay Involved For additional information, please contact: George Gadiel, PE Dwayne Darbonne, PE Lake County Project Manager Consultant Project Manager Lake County Public Works METRO Consulting Group, LLC 350 N. Sinclair Ave 604 Courtland St. Ste. 140 Tavares, FL 32778 Orlando, FL 32804 Phone: (352) 253-9092 Phone: (407) 960-3973 Email: Email: ggadiel@lakecountyfl.gov dwayne.darbonne@metrocgllc.com Visit the study website, www.cr455extensionstudy.com , to stay informed about the study’s progress. www.cr455extensionstudy.com

  25. Lake County Alternative Concepts Public Workshop June 20, 2019 Meeting THANK YOU! CR 455 Extension Project Development and Environment (PD&E) Study RSQ 17-0014 www.cr455extensionstudy.com