COSGRAY ROAD E XT E NSI ON City o f Hillia rd Ohio De pa rtme nt o f T ra nspo rta tio n F RA-COSGRAY ROAD, PI D 90989 Aug ust 12, 2014
EXISTING CONDITIONS • Lack of north ‐ south connectivity • Long queues at intersections today Contributes to rear ‐ end collisions • • Congestion predicted to worsen • Lack of bicycle/pedestrian facilities
PROJECT PURPOSE • Improve north ‐ south connectivity • Reduce congestion • Improve safety • Enhance alternative travel modes
ZONING • Includes Jerman Tract • Retail, office, and recreational land uses • Zoning approved in 2010 by City and Big Darby Accord
ZONING 2008/2010: • Includes Jerman Tract Willoway Wholesale/MJC Holdings LLC • Retail, office, and (Campus at Alton Darby) recreational land uses • Zoning approved in 2010 by City and Big Darby Accord 2013: Planned Development Company of Ohio (Heritage Preserve)
• Project focuses on transportation network • Considers stormwater & future development • Project will not focus on zoning &/or land uses
RECOMMENDED ALTERNATIVE “Green” median with • bioswales Multi ‐ use paths on both sides • and on ‐ street bike accommodations Enhanced pedestrian crossing • for regional bike trail Roundabout with access to • public soccer fields & Jerman site Roundabout at Alton & Darby • Creek Road intersection 35 ‐ mph speed limit •
COSGRAY ROAD EXTENSION TYPICAL ROADWAY ELEVATION VIEW
• Roundabout at Soccer Field/Main Site Drive Intersection • Allows for safe bike/ped crossing of Cosgray Extension • Maximizes median/bioswale length • Slower speeds (20 ‐ 25 mph design speed)
• Roundabout at Alton & Darby Creek intersection • Slower speeds (20 ‐ 25 mph design speed) • Traditional (4 ‐ leg) intersection on curve not desirable
PEDESTRIANS & BICYCLES Multi ‐ use path • Future regional trail • connection On ‐ street bicycle facilities • Split median pedestrian • crossings Future extensions to Municipal • Park & Prairie Oaks Metro Park
TYPICAL SPLIT MEDIAN CROSSING ELEVATION VIEW
Cosgray Road Extension Will Exceed Stormwater Requirements 79 Runoff Storage Volume (acre ‐ feet) COSGRAY ROAD EXTENSION PROJECT 34 28 City of Hilliard Big Darby Creek Zero Runoff in 2 ‐ Year Watershed Rain Storm
NEXT STEPS • 2014/2015: Finish environmental studies & preliminary design • 2015/2016: Final Design • 2016: Right ‐ of ‐ Way Acquisition • 2017: Construction *All dates are subject to funding availability.