commonwealth of the bahamas commonwealth of the bahamas
play

COMMONWEALTH OF THE BAHAMAS COMMONWEALTH OF THE BAHAMAS MINISTRY OF - PowerPoint PPT Presentation

COMMONWEALTH OF THE BAHAMAS COMMONWEALTH OF THE BAHAMAS MINISTRY OF PUBLIC WORKS & TRANSPORT MINISTRY OF PUBLIC WORKS & TRANSPORT NASSAU HARBOUR PORT IMPROVEMENT PROJECT AUGUST 2009 Nassau Harbour Port Improvement Project Nassau


  1. COMMONWEALTH OF THE BAHAMAS COMMONWEALTH OF THE BAHAMAS MINISTRY OF PUBLIC WORKS & TRANSPORT MINISTRY OF PUBLIC WORKS & TRANSPORT NASSAU HARBOUR PORT IMPROVEMENT PROJECT AUGUST 2009 Nassau Harbour Port Improvement Project Nassau Harbour Port Improvement Project

  2. OVERALL VIEW OF NASSAU HARBOUR Nassau Harbour Port Improvement Project Nassau Harbour Port Improvement Project

  3. AERIAL VIEW OF NASSAU HARBOUR Nassau Harbour Port Improvement Project Nassau Harbour Port Improvement Project

  4. PROJECT HISTORY · 1960’ ’s initial dredging of Nassau Harbour and formation s initial dredging of Nassau Harbour and formation · 1960 of Kelly Island. of Kelly Island. · 1980’ ’s dredging completed to accommodate cruise lines s dredging completed to accommodate cruise lines · 1980 vessels as presently calling to port. vessels as presently calling to port. · 2007 cruise industry to improve efficiency by increase in · 2007 cruise industry to improve efficiency by increase in vessel size, and reduction in overall fleet size. vessel size, and reduction in overall fleet size. · Evaluation of present manouvering manouvering, and berthing areas , and berthing areas · Evaluation of present to accommodate future ship traffic. to accommodate future ship traffic. · Ministry of Works and Transport tender consultancy · Ministry of Works and Transport tender consultancy services for specialized activity. services for specialized activity. Nassau Harbour Port Improvement Project Nassau Harbour Port Improvement Project

  5. PROJECT HISTORY Cont ’ ’d. d. PROJECT HISTORY Cont · Royal Caribbean Cruise Lines' "Oasis of the Seas“ “ will arrive 11 · Royal Caribbean Cruise Lines' "Oasis of the Seas will arrive 11 December 2009. December 2009. · Ship characteristics: · Ship characteristics: Length: 1,180 ft; Beam: 140 ft; Draft: 35 ft. Length: 1,180 ft; Beam: 140 ft; Draft: 35 ft. Passengers: 6,400 Crew: 3,000 Passengers: 6,400 Crew: 3,000 · This is the first of a number of similar sized ships replacing · This is the first of a number of similar sized ships replacing smaller ships. smaller ships. Nassau Harbour Port Improvement Project Nassau Harbour Port Improvement Project

  6. PROJECT HISTORY Cont’d. Nassau Harbour Port Improvement Project Nassau Harbour Port Improvement Project

  7. PROJECT COMPONENTS · Dredging 1.9 million cubic yards of material. · Dredging 1.9 million cubic yards of material. · Widening of the Approach Channel. · Widening of the Approach Channel. · Lengthening of the Turning Basin. · Lengthening of the Turning Basin. · Installation of 3 Mooring Dolphins. · Installation of 3 Mooring Dolphins. · Westward Extension of Arawak Cay. · Westward Extension of Arawak Cay. · Stockpiling of 1.0 million cubic yards of dredge material dredge material · Stockpiling of 1.0 million cubic yards of for future development. for future development. Nassau Harbour Port Improvement Project Nassau Harbour Port Improvement Project

  8. PROJECT COMPONENTS Cont’d AERIAL VIEW DREDGE AREAS AERIAL VIEW DREDGE AREAS Nassau Harbour Port Improvement Project Nassau Harbour Port Improvement Project

  9. PROJECT COMPONENTS Cont’d DREDGE AREAS 1, 2, 3, 4 , 5 DREDGE AREAS 1, 2, 3, 4 , 5 ARAWAK CAY EXTENSION ARAWAK CAY EXTENSION Nassau Harbour Port Improvement Project Nassau Harbour Port Improvement Project

  10. PROJECT COMPONENTS Cont’d 3 NEW MOORING DOLPHINS 3 NEW MOORING DOLPHINS Nassau Harbour Port Improvement Project Nassau Harbour Port Improvement Project

  11. PROJECT COMPONENTS Cont’d ARAWAK CAY EXTENSION AND STOCKPILE AREA ARAWAK CAY EXTENSION AND STOCKPILE AREA Nassau Harbour Port Improvement Project Nassau Harbour Port Improvement Project

  12. PROJECT EXECUTION Ministry of Public Works & Transport Ministry of Public Works & Transport Input From: Input From: Cox & SHAL Consultants & their Sub- -consultants consultants Cox & SHAL Consultants & their Sub • • Ministry of Environment Ministry of Environment • • Port Department Port Department BEST Commission BEST Commission Ministry of Tourism Ministry of Tourism • • Ministry of Finance Ministry of Finance • • Royal Bahamas Defense Force Royal Bahamas Defense Force • • Nassau Harbour Port Improvement Project Nassau Harbour Port Improvement Project

  13. PROJECT EXECUTION Cont’d Site Investigations & Studies: Site Investigations & Studies: Ship Simulation Study – – Harbour Geometry Ship Simulation Study Harbour Geometry Geotechnical - - Harbour & Arawak Cay Geotechnical Harbour & Arawak Cay Hydrographic Surveys - - Water Depths Hydrographic Surveys Water Depths Coastal Engineering – – Beach Effects Coastal Engineering Beach Effects Environmental EIA – – Harbour & Arawak Cay Environmental EIA Harbour & Arawak Cay Preliminary Engineering Report Preliminary Engineering Report Final Design, Drawings Final Design, Drawings Specifications Specifications Tender Contract Documents Tender Contract Documents Review During Construction Review During Construction Nassau Harbour Port Improvement Project Nassau Harbour Port Improvement Project

  14. PROJECT EXECUTION Cont’d Prequalification of Contractors: August 2008 Prequalification of Contractors: August 2008 Issue for Tender: December 23, 2008 Issue for Tender: December 23, 2008 Pre- -Tender Meeting: January 21, 2009 Tender Meeting: January 21, 2009 Pre Tender Receipt: February 24, 2009 Tender Receipt: February 24, 2009 Contract Award: March 27, 2009 Contract Award: March 27, 2009 Mobilized to site: May 2009 Mobilized to site: May 2009 Nassau Harbour Port Improvement Project Nassau Harbour Port Improvement Project

  15. PROJECT DETAILS Contract Value: US $ 44.2 million Contract Value: US $ 44.2 million Contractor: Boskalis International b.v. . Contractor: Boskalis International b.v Subcontractors: Subcontractors: American Bridge Bahamas American Bridge Bahamas Bahamas Marine Construction Bahamas Marine Construction Project Timing: Project Timing: July 1, 2009 Start fieldwork July 1, 2009 Start fieldwork Aug 13, 2009 Start Dredging Aug 13, 2009 Start Dredging Nov 30, 2009 Complete Dredging Nov 30, 2009 Complete Dredging Dec 11, 2009 Arrival, Oasis of the Seas Dec 11, 2009 Arrival, Oasis of the Seas March 2010 Total Project Completion March 2010 Total Project Completion Nassau Harbour Port Improvement Project Nassau Harbour Port Improvement Project

  16. PROJECT IMPACTS No change to Western Esplanade Beach. No change to Western Esplanade Beach. No change to Saunders Beach. No change to Saunders Beach. No storage of fish and conch within the Project Area No storage of fish and conch within the Project Area (Arawak Cay to Potter’ ’s Cay) s Cay) (Arawak Cay to Potter Turbidity Controls: Florida EPA Standard. Turbidity Controls: Florida EPA Standard. There will be a visible Turbidity Plume within the mixing zone. There will be a visible Turbidity Plume within the mixing zone. Nassau Harbour Port Improvement Project Nassau Harbour Port Improvement Project

  17. PUBLIC AWARENESS Meetings held with Government Stakeholders January 2009. Meetings held with Government Stakeholders January 2009. Meetings held with private stakeholders directly affected Meetings held with private stakeholders directly affected January 2009: January 2009: Mail Boat Association Mail Boat Association Tourism Operators Tourism Operators Shipping Agents Shipping Agents Arawak Cay Vendors Association Arawak Cay Vendors Association Potter’ ’s Cay Dock Vendors Association s Cay Dock Vendors Association Potter Jet- -ski Operators Association ski Operators Association Jet Downtown Development Committee Downtown Development Committee Nassau Harbour Port Improvement Project Nassau Harbour Port Improvement Project

  18. CONTACT INFORMATION CONTACT INFORMATION MINISTRY OF PUBLIC WORKS & TRANSPORT MINISTRY OF PUBLIC WORKS & TRANSPORT CIVIL ENGINEERING SECTION CIVIL ENGINEERING SECTION TEL: (242) 302- -9772 9772 TEL: (242) 302 FAX: (242) 302- -9770 9770 FAX: (242) 302 EMAIL: publicworks@bahamas.gov.bs publicworks@bahamas.gov.bs EMAIL: Nassau Harbour Port Improvement Project Nassau Harbour Port Improvement Project

Recommend


More recommend