common bmp deficiencies
play

Common BMP Deficiencies By: Bobbie Teixeira, Department of Health - PowerPoint PPT Presentation

Common BMP Deficiencies By: Bobbie Teixeira, Department of Health August 13, 2019 Sediment Control- Silt Fence Sediment Control- Silt Fence Sediment Control- Silt Fence Sediment Control- Silt Fence Sediment Control- Silt Fence Erosion


  1. Common BMP Deficiencies By: Bobbie Teixeira, Department of Health August 13, 2019

  2. Sediment Control- Silt Fence

  3. Sediment Control- Silt Fence

  4. Sediment Control- Silt Fence

  5. Sediment Control- Silt Fence

  6. Sediment Control- Silt Fence

  7. Erosion Control vs Sediment Control

  8. Perimeter Controls and Storm Drain Inlets

  9. Storm Drain Inlets and Portable Toilets

  10. Stockpiles and Slopes

  11. Material Storage

  12. Waste Containers

  13. Oil Staining

  14. Tracking

  15. Concrete Waste

  16. Concrete Waste

  17. Sediment Basins

  18. • Appendix C • Maxim ize your basin’s requirem ents function Sediment How the requirem ents allow it Basins Basins are m eant to… • Size basin based on your project area or • Retain/ Detain storm m inim um 2-year, 24 - water hour storm • Utilize an outlet • Allow dirt to settle structure that skim s from the top • Contain storm water if possible • Stabilize your basin • Use velocity dissipation • Be a part of your storm for your basin’s water m anagem ent discharges system – not be the • Must be situated outside only physical BMP! of State waters • Rem ove accum ulation to m aintain capacity

  19. Don’t put • your basin in line with Culvert a State Intermittent water Stream Don’t • allow off- site water into your basin

  20. Clean Water Branch 2827 Waimano Home Road #225 Pearl City, Hawaii 96782 Phone: 586-4309

Recommend


More recommend