HOBK-00070 7/22/2015 CITY OF HOBOKEN FIREHOUSE PARKING LOT BASE BID Item Description Quantity Unit Unit Price Amount 1 CLEARING/GRADING SITE 1 LS $5,000.00 $5,000.00 2 HOT MIX ASPHALT 9.5M64 SURFACE COURSE, 2" THICK 60 TON $125.00 $7,500.00 3 DENSE GRADED AGGREGATE BASE COURSE, 6" THICK 402 SY $5.00 $2,010.00 4 HOT MIX ASPHALT 19M64 BASE COURSE, 4" THICK 120 TON $125.00 $15,000.00 5 COURSE AGGREGATE NO. 4, BROKEN STONE, 18" THICK 28 SY $55.00 $1,540.00 6 9"X18" CONCRETE VERTICAL CURB 60 LF $50.00 $3,000.00 7 GEOTEXTILE, ROADWAY STABILIZATION 402 SY $2.00 $804.00 8 WASTE CLASSIFICATION TESTING & SAMPLING 1 LS $1,000.00 $1,000.00 9 CONTAMINATED SOIL DISPOSAL 170 TON $75.00 $12,750.00 10 TRAFFIC STRIPES, LONG-LIFE, THERMOPLASTIC (IF & WHERE DIRECTED) 360 LF $2.00 $720.00 TOTAL CONSTRUCTION COST: $49,324.00 K:\HOBK\00070\Calculations & Reports\Engineer's Estimate.xlsx
Proposed Construction Budget Estimate For: New Storage Facility Hoboken Fire Department 201 Jefferson Street Hoboken, NJ 07030 1-Dec-14 Description Quantity Unit Unit cost Sub-total SITEWOKR: Fencing removal & rework 17.00 LF $25.00 $425.00 Asphalt demo/repair 250.00 SF $16.00 $4,000.00 Excavation 200.00 CY $40.00 $8,000.00 $12,425.00 Total Sitework: CONCRETE & STEEL Concrete Footing/Slabs 50.00 CY $450.00 $22,500.00 Concrete Stairs/Railings 1.00 Lump $12,000.00 $12,000.00 Steel Beams/Decking 1,200.00 SF $30.00 $36,000.00 CMU Walls 2,560.00 SF $20.00 $51,200.00 $121,700.00 Total Concrete: EXTERIOR WORK & FINISHES: Roofing and Framing 1,100.00 SF $15.00 $16,500.00 Sheet Metal 60.00 LF $8.00 $480.00 PVC Trim 100.00 LF $10.00 $1,000.00 Aluminum Gutters and Leaders 100.00 LF $8.00 $800.00 Waterproofing Paint Finish 2,000.00 SF $1.50 $3,000.00 Overhead Door 1.00 Lump $2,500.00 $2,500.00 Doors and Hardware 4.00 Ea $1,000.00 $4,000.00 Total Exterior Work & Finishes: $28,280.00 ELECTRICAL: Electrical power 1,200.00 SF $3.00 $3,600.00 Lighting 1,200.00 SF $6.00 $7,200.00 $10,800.00 Total Electrical: Total Construction Costs: $173,205.00 Brick Veneer Alternate #1 250.00 SF $16.00 $4,000.00 General Allowance: 10% $17,320.50 Total Project Costs: $194,525.50 46.13.005_Hoboken Fire Department Storage.xlsx 1 of 1 12/1/2014
Recommend
More recommend