CITY OF CAMARILLO Storm Drain Structure Maintenance Bid Specification MC-2019-2 (REBID) Mandatory Pre-Bid Meeting – January 22, 2020
Mandatory Pre-Bid Meeting Outline (Please sign the attendance sheet before leaving this meeting) 1. Bid Due Date and Submittals 2. Bid Minimum Spec. Requirements 3. Review Storm Drain Structures 4. Review Scope of Work
Bid Due Date and Submittals Due by 10:00am on February 11, 2020 Sealed bid delivered to City Clerk’s Office, 601 Carmen Dr. Camarillo CA 93010 Submittals – Review Bid for all Required Submittals
Bid Minimum Spec. Requirements DIR – Contractor & Subs Prevailing Wage Contractor’s License Encroachment Permit City Business License
Storm Drain Structures: Detention Basins Earthen Ditches Concrete Ditches Concrete Culverts Parkway Drains Fence Line Trash Cleanup
City Storm Drain Structures to be Maintained
Detention Basins #11 – Cerro Vista
Detention Basins #33 – Sares Regis, 2310 Antonio
Detention Basins #17 – Earl Joseph Drive #3b – 6215 Armitos Dr.
Earthen Ditch & DB Standpipe 1 Standpipes 2 Entrance to F Canyon access road #19a – F Canyon Detention Basin/Ditch
Earthen Ditch & DB Standpipe Standpipe 2 #19a – F Canyon Detention Basin/Ditch
Drop Inlet above Ditch #19b – F Canyon Drop Inlet (Woodcreek Rd.)
Earthen Ditch #27 – Pleasant Valley Rd. #16 – Las Posas Rd.
Concrete V-Ditch #45 – 413 Calle Higuera #16 – Del Norte/Central (behind MHP)
Culverts #5 – Ventura Blvd. s/side n/o Cam. Hills Drain #47 – Daily Dr. North
Culverts #25 – Paseo Del Campo/Creekside #26 – Dead End Paseo Noche
Parkway Drains #12 – 4847 Colony #13 – 4707 Colony
Fence Line Trash Cleanup #48 – Del Norte (s/side adjacent to 101 Frwy. from dead end to Harley Davidson driveway) #49 – Daily Dr. (s/side adjacent to 101 Frwy. from Calle La Roda to Carmen)
L a s P o s Ventura Blvd. a s R d Fence Line #48 – Ventura Blvd. starting at Central Ave. Trash Cleanup on north side along fence running parallel to 101 frwy to fencline adjacent to Camarillo Hills Drain ending at Las Posas Rd. Drain
Bid Specification Section 701 – Scope of Work • Stormwater Best Management Practices - SWPCP • Traffic Control Plan • Work Hours – M-F; 7 am – 4 pm (no activity in moving traffic lane between 7-8:30 am or after 4:30 pm
Bid Specification Section 701 – Schedule Cleanout – Start within 2 weeks of issuance of Purchase • Order.
Bid Specification Section 701- Maintenance • City to provide contractor with prioritized list of storm drain structures along with any special conditions. • Contractor shall notify Underground Service Alert (Dig alert) and insure all utility lines have been marked prior to maintenance. • Weeds to be removed by Contractor performing maintenance. • Contractor to remove sediment, debris and trash in storm drain structure. • If use of water – vacuum and dispose of at City Wastewater Treatment Plant; no discharge to storm drain structure.
Bid Specification Section 701- Maintenance • Contractor to complete City maintenance form (see Appendix B1 in Bid Spec.) • Contractor to photo document storm drain structures before and after cleanout per City standard (see Appendix B2). • Contractor shall provide city with flash drive of photos and the maintenance forms within one week after last storm drain structure was cleaned out.
Bid Specification Section 701 – Documentation
APPENDIX B1 Page 2
City Contacts Jessica Ouellette, Stormwater Program Manager – • 805-388-5391 Mike Sanchez, Stormwater Inspector – 805-402-6692 •