Caltrain Advanced Signal System August / September 2011 Stakeholder - PowerPoint PPT Presentation

Caltrain Advanced Signal System August / September 2011 Stakeholder Meetings Purpose Rail Corridor Need Enhanced Safety Growing Caltrain Operations Increase Capacity Increase Efficiency 3 Enhanced Safety 2008 Metrolink


  1. Caltrain Advanced Signal System August / September 2011 Stakeholder Meetings

  2. Purpose

  3. Rail Corridor Need • Enhanced Safety • Growing Caltrain Operations – Increase Capacity – Increase Efficiency 3

  4. Enhanced Safety • 2008 Metrolink Accident • Rail Safety Improvement Act 2008 • FRA Unfunded Mandate • Install Positive Train Control (PTC) • End of 2015 4

  5. Growing Caltrain Operations • Growing transit market • Existing services – Caltrain – ACE and Capital Corridor – Freight • New services planned – HSR – Dumbarton 5

  6. Project Scope

  7. Advanced Signal System • CBOSS – Communication based overlay signal system – Acronym (not a product) • System Purpose – PTC Requirements – Caltrain Operating Needs 7

  8. PTC Requirements • Prevent collisions • Enforce speed limits • Protect work zones • Interoperability 8

  9. Caltrain Operating Needs • Improving Crossing Safety/ Performance • Efficient running of mixed traffic • Enforce Scheduled Station Stopping 9

  10. Technology Considerations • FRA interoperable requirement • Class I railroad standards Caltrain I-ETMS Advanced Signal (US Class I) System PTC PTC Base 220mhz 220mhz Frequency Band required Customization Caltrain Needs Freight Needs 10

  11. Project Status

  12. Request for Proposal • Project Cost: Approximately $250M • Package – Design – Materials and Equipment – Installation / Testing / Commissioning – FRA Safety Certifications – Training – Backup Center Control Faculty – Operations and Maintenance Support – Warranty 12

  13. Project Schedule • 2011 - 2013 – Award Contract – Design – Manufacturing • 2013 - 2014 – Installation – Testing • 2015 – Safety Certification – Revenue Service 13

  14. HSR Coordination CALTRAIN Procurement HSR HSR & Interoperability Critical Design Caltrain Requirements (2012) FRA Grant Agreement Final Design Procurement (2013) Design (Date?) Implementation (2013 - 2015) Implementation (Post) 2015 14

  15. Discussion Contact Information: Caltrain Modernization Program caltrainptc@samtrans.com www.caltrain.com