building committee update
play

BUILDING COMMITTEE UPDATE FEBRUARY 27, 2018 PROJECT UPDATE - - PowerPoint PPT Presentation

ROCKWELL AND JOHNSON ELEMENTARY SCHOOL PROJECTS BUILDING COMMITTEE UPDATE FEBRUARY 27, 2018 PROJECT UPDATE - Schem Schematic Design Updat Design Update - Buildin Building Design U Design Updat dates - Typica pical floor plan la l


  1. ROCKWELL AND JOHNSON ELEMENTARY SCHOOL PROJECTS BUILDING COMMITTEE UPDATE FEBRUARY 27, 2018

  2. PROJECT UPDATE - Schem Schematic Design Updat Design Update - Buildin Building Design U Design Updat dates - Typica pical floor plan la l floor plan layouts - uts - Updat pdates es - Mecha Mechanic ical Syst Systems U s Upda date - Site te/Civil U Update te - Schedule Schedule

  3. SCHEMATIC DESIGN UPDATE - Sit Site plan re plan revisions visions - Revised Floor P vised Floor Plans ans - - Suites Design s Designed ed - - Lock ockers in rs in corrid corridors ( (Grades 1-5) s 1-5) - - MEP and T EP and Technolog chnology spac spaces locat located - Updat Updated Ele d Elevations – ations – Ext xterior Building Mat erior Building Materials; F rials; Fenestrat nestration on - Increased Floor t Increased Floor to Floor in Johnson Ad Floor in Johnson Addit dition on - CT High P CT High Performance Building Checklist - ormance Building Checklist - DRAFT RAFT

  4. ROCKWELL - DESIGN UPDATE

  5. ROCKWELL SCHOOL Existing Site Plan

  6. ROCKWELL SCHOOL Site Plan

  7. ROCKWELL SCHOOL – LEVEL 1

  8. ROCKWELL SCHOOL – LEVEL 2

  9. ROCKWELL SCHOOL Front Door & Cafeteria

  10. ROCKWELL SCHOOL Entry & Cafeteria - Current

  11. ROCKWELL SCHOOL Aerial View 1 GYM PLATFORM CLASSROOMS OUTDOOR MAIN ENTRY PERFORMANCE AREA CAFETERIA KITCHEN LOADING DOCK

  12. ROCKWELL SCHOOL Aerial View 2 CAFETERIA ADMIN MAIN ENTRY CLASSROOMS CLASSROOMS

  13. JOHNSON - DESIGN UPDATE

  14. JOHNSON SCHOOL Exist Existing Site Plan

  15. JOHNSON SCHOOL Site Plan

  16. JOHNSON SCHOOL – LEVEL 1

  17. JOHNSON SCHOOL – LEVEL 2

  18. JOHNSON SCHOOL Front Door & Cafeteria

  19. JOHNSON SCHOOL Front Door - Current

  20. JOHNSON SCHOOL Aerial View 1 CLASSROOMS GYM MAIN ENTRY CAFETERIA KITCHEN ENTRY STAIR LOADING

  21. JOHNSON SCHOOL Aerial View 2 CLASSROOMS MAIN ENTRY SECONDARY ENTRY MEDIA CENTER

  22. JOHNSON SCHOOL Typ. Classroom Windows

  23. ROCKWELL SCHOOL Typ. Classroom Windows

  24. ENLARGED PLANS Typical Classroom

  25. ENLARGED PLANS Typical Classroom - RCP

  26. ENLARGED PLANS Typ. Kindergarten Classroom

  27. ENLARGED PLANS Media Center - Rockwell

  28. ENLARGED PLANS Media Center - Johnson

  29. ENLARGED PLANS Cafeteria - Rockwell

  30. ENLARGED PLANS Cafeteria - Johnson

  31. MEP UPDATE - Mecha Mechanic ical Syst System U Upda date

  32. PROPOSED MECHANICAL SYSTEM Classr Classrooms & ooms & Administration ministration • New High Efficiency Boilers (97%) • 4-Pipe Fain Coil Unit • Hydronic Radiant Coiling Panes in Perimeter

  33. PROPOSED MECHANICAL SYSTEM Classr Classrooms & ooms & Admin. (Continued) min. (Continued) • Dedicate Outdoor Air Units (DOAS) for Ventilation Gas Fired with DX (Electric Cooling) • Dedicated Outdoor Air (DOAs) Unit

  34. PROPOSED MECHANICAL SYSTEM Gymn Gymnasi asium, Caf Cafeteria and a and Media Cent Media Center er • Package Roof Top Units for Heat & Ventilation, Gas Fired and DX Cooling (Electric)

  35. SITE/CIVIL UPDATE - Traf affic Study fic Study - Geo Geotechnical In echnical Investigation stigation - Sur Survey - En Envir vironmen ental l - Pe Permits

  36. SCHEDULE UPDATE

  37. SCHEDULE UPDATE

  38. NEXT STEPS: - OSCG&R OSCG&R SD R SD Revi view Mee Meeting ing - - 3/22 at /22 at 9:30 9:30 am am - - 3/29 at /29 at 10:00 am :00 am - Ne Next xt Meet Meeting: 3/2 g: 3/27 - DD del DD delivera rable due 4/1 due 4/15 - Mee Meet with CM f with CM follo llowin ing selec g selection ion - Meet with Commissioning A Meet with Commissioning Agent ent follo llowin ing selec g selection ion