BLAIR COVERED BRIDGE CAMPTON, NH
Removal of Pavement
Preparation for Concrete
Siding Removal
Siding and Flooring Removed
Original Floor Joists
Staging
Sandbags – Cofferdam – New Concrete Poured
Shoring truss being inserted
Truss inserted – Jacking stations set -- Blair Bridge is suspended – Trusses are out of compression and can be examined and repaired
Jacking stations at needle beams
Typical conditions of the original bridge
New arch leaves
Only beam left from the original bridge that was destroyed by arson. Located at the center pier.
Sawtooth Joinery
Original sawtooth joinery done by Arnold M Graton from the 1980’s restoration
Diagonal and vertical replacements
Repairs complete – truss removal
Preparing for the 30 day shutdown
Never Ending Winter
Pier – Ice Breaker
{
Repair Detail
{
{
{
{ New floor joists
{
{ New oak flooring
{
{ New standing seam roof
{ Wedge Counter Brace-Defining characteristic of Long Truss
{ Pegged joinery in process
{ Rebuild of the south east wing wall using traditional dry stack masonry
{
New siding