BLAIR COVERED BRIDGE CAMPTON, NH Removal of Pavement Preparation - PowerPoint PPT Presentation

BLAIR COVERED BRIDGE CAMPTON, NH Removal of Pavement Preparation for Concrete Siding Removal Siding and Flooring Removed Original Floor Joists Staging Sandbags Cofferdam New Concrete Poured Shoring truss being inserted Truss inserted


  1. BLAIR COVERED BRIDGE CAMPTON, NH

  2. Removal of Pavement

  3. Preparation for Concrete

  4. Siding Removal

  5. Siding and Flooring Removed

  6. Original Floor Joists

  7. Staging

  8. Sandbags – Cofferdam – New Concrete Poured

  9. Shoring truss being inserted

  10. Truss inserted – Jacking stations set -- Blair Bridge is suspended – Trusses are out of compression and can be examined and repaired

  11. Jacking stations at needle beams

  12. Typical conditions of the original bridge

  13. New arch leaves

  14. Only beam left from the original bridge that was destroyed by arson. Located at the center pier.

  15. Sawtooth Joinery

  16. Original sawtooth joinery done by Arnold M Graton from the 1980’s restoration

  17. Diagonal and vertical replacements

  18. Repairs complete – truss removal

  19. Preparing for the 30 day shutdown

  20. Never Ending Winter

  21. Pier – Ice Breaker

  22. {

  23. Repair Detail

  24. {

  25. {

  26. {

  27. { New floor joists

  28. {

  29. { New oak flooring

  30. {

  31. { New standing seam roof

  32. { Wedge Counter Brace-Defining characteristic of Long Truss

  33. { Pegged joinery in process

  34. { Rebuild of the south east wing wall using traditional dry stack masonry

  35. {

  36. New siding