F b February 2012 2012 T RANSIT D IVISION T RANSIT D IVISION T RANSIT D IVISION T RANSIT D IVISION
Balfour Beatty Rail, Inc. � The Transit Division of Balfour Beatty Rail has safely � The Transit Division of Balfour Beatty Rail has safely delivered complex transit projects, proving expertise in track construction, electrification, signaling, communications and asset management. 2
Transit Division RTD Eagle P3 Project RTD West Corridor Project RTD On-Call Services Contract RTD On-Call Services Contract Denver WA MT ME ME ND OR VT MN ID NH SD NY MA WI WY RI MI BART CT PA San Francisco NJ IA NE NE NV NV OH OH MD CO DE UT IL IN CA VA WV KS MO KY NC TPG MTA Gold Line Goldsboro TN AZ OK SCRRA-Metro Link AR NM NM SC SC GA GA AL MTA EXPO Track GA MS Transit Division Office LA LA TX West Covina FL Corporate Office Atlanta 3
Mid-City Exposition LRT Project P ROJECT S TART D ATE P ROJECT S TART D ATE January 2009 P ROJECT C OMPLETION D ATE March 2011 (Forecast) ( ) O WNER Exposition Line Construction Authority P ROJECT V ALUE $35 $35 million illi P ROJECT S COPE Installation of new direct fixation, embedded, and ballasted track for 7 mile LRT extension. Refurbish existing embedded track and tie in to the existing Metro Blue Line. 4
Metrolink Communication and Signal Project P ROJECT S TART D ATE February 2009 P ROJECT C OMPLETION D ATE February 2012 (Forecast) with 2 one-year options p O WNER Southern California Regional Rail Authority (SCRRA) P P ROJECT V ALUE V $45 million P ROJECT S COPE Install, modify, and test wayside electrical , y, y power services and local distribution, wayside signal system, highway-rail guard crossing warning systems and pedestrian devices, wayside hazard detectors, and monitoring devices, communications monitoring devices, communications systems. 5
Denver On-Call Project P ROJECT S TART D ATE March 2009 P ROJECT C OMPLETION D ATE July 2013 O WNER O WNER Denver Regional Transportation District (RTD) P ROJECT V ALUE $ 56 million P ROJECT S COPE Retrofit the TREX project to install new traction power substations for 4 car trains traction power substations for 4 car trains, upgrade the Elati Yard traction power substation and system plc upgrade. 6
Denver West Corridor Project P ROJECT S TART D ATE September 2009 P ROJECT C OMPLETION D ATE December 2012(Forecast) ( ) O WNER Denver Regional Transportation District (RTD ) P ROJECT V ALUE P ROJECT V ALUE $62 million P ROJECT S COPE Provide ten (10) new 1500kW traction Provide ten (10) new 1500kW traction power substations, catenary, signals and communication system for the West Corridor Project. 7
BART Walnut Creek Project P ROJECT S TART D ATE OJ C S August 24, 2009 P ROJECT C OMPLETION D ATE December 23, 2010 O WNER O WNER Bay Area Rapid Transit (BART) JV P ROJECT V ALUE $28 million P ROJECT S COPE Track, system & signal work includes installing owner furnished special track work, train control equipment, 2 No. gap breaker stations complete with DC switchgear, 1000Vd f 1000Vdc feeder and traction power 34.5KV EPR cables d d t ti 34 5KV EPR bl and raceways, contact rail system, modifications of existing train control rooms. 8
Eagle P3 Project P ROJECT S TART D ATE S EPTEMBER 2010 P ROJECT C OMPLETED (D/B) J UNE 2016 J UNE 2016 O WNER R EGIONAL T RANSIT D ISTRICT Estimated P3 Project Value $ 3.0 Billion for Design/Build and Operations and Maintenance for 40 years. Maintenance for 40 years. BBRI is in a 50/50 Joint Venture with Fluor for the Design/Build and also holds 1/3 equity in the O & M Joint Venture. M Joint Venture. 9
Expo Mid-City/Exposition Corridor Light Rail Transit Project � C-5 Track/Train Power, Control & Communications � Farmdale Station/Parking Lot & Street Improvements � No. XP8901-841 � Contract Between: � Contract Between: • Exposition Metro Line Construction Authority • Balfour Beatty Joint Venture Other Important Agencies: Culver City, City of Los Angeles 10
Project Description � Joint Venture with BBII and BBRI for Stations � Joint Venture with BBII and BBRI for Stations � 3400’ of track, traction power, overhead catenary system, & communication systems for Culver City Station Install TPSS8 Hanging OCS Wires Pouring Plinths Building 11
Project Description Farmdale station: construct at-grade station g Hotel Demolition Before � After Farmdale Platform 12
Project Description Option 1 - Bike Path (Complete May 1, 2012) � Construction of 180’ retaining wall � 2575” of bike path that includes 250 tons aggregate base � Portland cement concrete (500 tons) ( ) � Irrigation � Trees � Lighting g g Current Conditions at Bike Path Location 13
Project Description Option 2 – Culver City Lot A (Complete May 1, 2012) p y ( p y , ) � Clean up existing lot � Add concrete gutter and fencing Current Conditions at Lot A 14
Project Description Option 3 – Culver City Lot B � Construction of 30,000SF lot that consists of drainage, placement of “mix seal” (no placement of mix seal (no asphalt), irrigation, landscape and lighting Current Conditions at Lot B 15
Project Description Option 4 – Street Improvements on Washington & National � Includes widening roadway with new underground drainage � Electrical Lights and traffic signals � New asphalt concrete � New asphalt concrete � PCC structural sections Current Conditions on National Current Conditions on Washington 16
Expo Mid-City/Exposition Corridor Light Rail Transit Project � C-6 Venice Blvd Underpass: Bridge & Street Improvements � No. XP8901-828 � Design Build Contract Between : • Exposition Metro Line Construction Authority p y • Balfour Beatty Infrastructure, Inc. � Other Important Agencies • Culver City • City of Los Angeles • Cal trans 17
Additional Work for Expo Authority � Venice Blvd Underpass: $15.7 Million, additional bridge over Venice Blvd – p g approximately 500’ � Complete Date 2013 Location of Proposed Frame 6 18