B ~ W ARD ' 'COUNTY FLORIDA 1$@M§l : MM (l Stantec EAC Consulting, Inc. IN ASSOCIATION WITH •• r• ••• TIO •• l eac consult.com
EAC by the Numbers 4 Florida Offices 2017 & 2018 Incorporated in Airports Served Employees Professional Engineers 7 1994 88 27 2 IN ASSOCIATION WITH
Our Journey with Broward County Aviation Department More than Twenty Years of Successful Partnership on Projects 1991 – 2000 2001 – 2010 2011 – now ► Pelican Hangars Structural Services ► Terminal 4 Civil Works – Preliminary Concept Desi gn ► Terminal Access Roadway Design Improvements ► Budget Rent A Car Facility Rehabilitation - Civil Engineering Design ► Right-of-Way Wetlands Identification and De lineation ► Stormwater/Drainage Master Plan ERP Modification ► Storm water Master Plan ERP Permit ► Fencing Installation Design Services at North Perry A irport ► Peri meter Road Improvements ► Garage Entrance Roadway Demolition & Improvements ► Rehabilitation of Taxiway N ► Parki ng Garage Repairs - Design Services ► Runway 9L 27R (EMAS) Design Services ► North Perimeter Road Water Main Improvements - Conceptua l ► Commuter Terminal Expansion Report and Design ► Airport Expansion Program Management Services ► Parki ng Garage - Phase 2 - CIS ► South Perimeter Road Force Main Improvements - Conceptua l ► 9R 27L Runway Over US-1 Feasibility Study + Prelim Design Report and Final Design ► Garage Access Roadways ► FEC Railroad Tracks Topographic Survey ► Westside Transmission & Distribution Water Ma in Improvements ► Jet Bri dge Foundations - Special Inspections ► Landscaping Enhancement at North Perry Airport ► Airport-wide Wayfinding Signage Improvements ► Terminal Access Roadways (Design Build) ► Fence Installation Design Services at North Perry Airport ► Development of BIM Standards ► Rent A Car (RAC) Bridges Design Services ► Rehabilitation of Runway 9L-27R (10L 28R) ► East Perimeter Road Water Main Improvements ► GTA Canopy Study ► Relocation of FPL Overhead Power Lines at Taxiway C – East end ► Rehabilitation of Taxiway P ► Garage Access Signage & Roadway Improvements VOR - Relocation Project ► Westside Water Main Improvements – Mater ials Testing ► Concourse B and Apron B1 - ERP Permit Modification ► AEP Construction Trailer Compound at Boater’s Park zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA ► Water and Wastewater On-Call Services ► Water Distribution System Master Plan ► Taxicab and Limo Holding Lot ► Wastewater Collection System Master Plan ► Taxicab and Limo Holding Lot AVI Commun ication Infrastructure ► Rehabilitation of Runway 18L-36R ► Gate 100/101 Lighting and CCTV Improvements ► Wildlife Assessment Study ► Normal Power Load Study ► Terminal 4 Hydrant Fueling System ► Eastside Water Main Improvements – Mater ials Testing ► Demolition Package for Key Power Building ► Terminal 3 Vendor Space Utilities and Concourse F Stairs Removal 3 IN ASSOCIATION WITH
Q.1: Firm’s Experience with Airport Studies, Evaluations and Assessments ► FLL Water Distribution System Master Plan ► FLL Wastewater Collection System Master Plan ► FLL Terminal 4 Hydrant Fueling System ► FLL Normal Power Load Study ► FLL Wildlife Assessment Study ► FLL GTA Canopy Study Prime Consultant with Unique Experience Relevant ► FLL 9R 27L Runway Over US-1 Feasibility Study + Prelim Design ► FLL Concourse B and Apron B1 - ERP Permit Modification to Scope of Services described within the RFP and ► FLL Taylor Road/NE 10th Street Wetland Delineation Study Specific to Airports and Aviation Facilities ► FLL Development of BIM Standards Manual ► FLL Stormwater Master Plan ERP Permit Modification ► FLL AEP Construction Trailer Compound at Boater’s Park ► FLL Terminal 4 Civil Works Conceptual Design ► FLL North Perimeter Road Water Main Improvements – Conceptual Report ► FLL Water and Wastewater On-Call Services ► MIA Roof Top Traffic Calming Assessments & Design ► FLL South Perimeter Road Force Main Improvements – Conceptual Report 4 IN ASSOCIATION WITH
Q.1: Team’s Experience with Airport Studies, Evaluations and Assessments ► RSW Part 150 Noise and Airspace Program Study ► MCO Cost Estimating for Airside 4 Improvement FA & HVAC Replacement ► TPA Non-Aviation Airspace Analysis ► FLL Noise Monitoring ► APF The Ivy Towers Airspace Analysis ► FLL ANOMS & PQS Assistance ► ATL Pavement Evaluation Program ► TUL ALP Development ► IAH Airfield Pavement Management Guide Team with Experience Relevant to ► HWO Master Plan and Airport Layout ► FLL Airfield Modifications Survey ► FLL FAR Part 150 Study Update Scope of Services described within the ► FLL Taxiway and Ramp Rehabilitation Survey ► YFC Assessment Study of Airside Physical Assets ► FLL Terminal 4 Hydrant Fueling System Design Survey RFP and Specific to Airports and ► MIA CONRAC Fueling System Peer Review Support ► FLL Terminal 4 Civil Works Survey Aviation Facilities ► RSW Compatibility Land Development Code ► FLL Taxiway C West Reconstruction Survey ► US Air Force Aviation Calibration Fuel System Studies ► HWO Master Plan Update ► South Carolina Aeronautics Commission Land Use Evaluation ► MIA Monitoring Wells Survey ► MIA - Westside Retention Pond Expansion ► MIA Utility Corridor Link Evaluation ► MIA - South Terminal Expansion Project Office Trailer ► MIA Concourse A Utility Link Evaluation Assessments ► MCO GIS Evaluations and Assessments ► MCO Cost Estimating for South Terminal Complex Design ► MCO Cost Estimating for Airside 4 Improvement FIS/CBP Wing Expansion 5 IN ASSOCIATION WITH
Q.2: Firm’s Knowledge of and Experience at FLL and HWO Prime Consultant with 50+ Individual Projects and Assignments at Both Facilities ► East Perimeter Road Water Main Improvements Fort Lauderdale-Hollywood Intl. Airport (FLL) North Perry General Aviation Airport (HWO) ► Westside Water Main Improvements – Materials Testing ► Water and Wastewater On-Call Services and Miscellaneous Meetings ► Taxicab and Limo Holding Lot ► Taxicab and Limo Holding Lot AVI Communication Infrastructure ► Gate 100/101 Lighting and CCTV Improvements ► Normal Power Load Study ► Eastside Water Main Improvements – Materials Testing ► Water Distribution System Master Plan ► Wastewater Collection System Master Plan ► Terminal 4 Hydrant Fueling System ► Terminal 4 Civil Works Conceptual Design ► Budget Rent A Car Facility Rehabilitation - Civil Engineering Design ► Right-of-Way Wetlands Identification and Delineation ► Stormwater Master Plan ERP Permit ► Terminal 3 Vendor Space Utilities and Concourse F Stairs Removal ► Garage Entrance Roadway Demolition & Improvements Terminal Access Roadway Design Improvements ► Runway 9L 27R (EMAS) Design Services ► Perimeter Road Improvements ► Airport Expansion Program Management Services ► Parking Garage Repairs - Design Services ► Rehabilitation of Runway 9L-27R ► 9R 27L Runway Over US-1 Feasibility Study + Prelim Design ► Commuter Terminal Expansion ► Rehabilitation of Runway 18L-36R ► FEC Railroad Tracks Topographic Survey ► Parking Garage - Phase 2 - CIS ► Landscaping Enhancement at North Perry Airport ► Relocation of FPL Overhead Power Lines at Taxiway C - Eastend VOR - ► Stormwater/Drainage Master Plan - ERP Modifications ► Pelican Hangars Structural Services zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA Relocation Project ► Garage Access Roadways ► Fence Installation Design Services at North Perry Airport ► AEP Construction Trailer Compound at Boater’s Park Preliminary Evaluation ► Jet Bridge Foundations - Special Inspections ► Fencing Installation Design Services at North Perry Airport ► North Perimeter Road Water Main Improvements - Conceptual Report and zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA ► Terminal Access Roadways (Design Build) ► Demolition of Key Power Building at North Perry Airport Design ► Rent A Car (RAC) Bridges Design Services ► Rehabilitation of Taxiway N ► South Perimeter Road Force Main Improvements - Conceptual Report and ► GTA Canopy Study Design ► Airport-wide Wayfinding Signage ► Garage Access Signage & Roadway Improvements ► Westside Water Main Improvements ► Rehabilitation of Taxiway P ► Development of BIM Standards ► Concourse B and Apron B1 - ERP Permit Modification 6 IN ASSOCIATION WITH
·~ ARD 1 lf§@l:!tjfl B ~ Firm’s Experience at FLL and HWO COUNTY FLORIDA N RTH PERRY AIRPORT BROWARD COUNTY, FLOR I DA FLOR I DA DEPARTMENT OF TRANSPORTAT I ON 2013 qenera[}l.viation}l.irport <Preserttea to tfie !Nortli (perry jf_ irport In reco9nition of outstamfi119 acliievemeuts in aitport aestfietics, safety a11a service in tfie Stat e of 'Fforiaa at <Broward County tfie "f f? /) _ C}enera(;4:viation)f.irport of a._Ls:s::< ~ )111antfi <Prasad, P/E. )lanm J{. Smitli State}lviat .i o11 :Manager Secretary EAC Consulting, Inc. 7 Stantec I NTERNA T ION AL () IN ASSOCIATION WITH eac co nsu lt. com
Presentation Outline – RFP Evaluation Criteria Ability of • Criterion 1.1 Professional • Criterion 1.2 Personnel • Criterion 2 Project Approach • Criterion 3 Past Performance Specialized • Criteria 4.1 to 4.7 Experience & Capabilities Workload of the • Criterion 5 Firm zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA 8 IN ASSOCIATION WITH
Criterion 1 / OUR PROJECT TEAM C R I T E R I A 1 2 3 4 5 9 IN ASSOCIATION WITH
Recommend
More recommend