appointment of multi disciplinary professional
play

Appointment of Multi-Disciplinary Professional Team to conduct a - PowerPoint PPT Presentation

Appointment of Multi-Disciplinary Professional Team to conduct a detailed re-inspection of construction work done by various contractors on the North Gauteng Testing Corridor. 26 September 2019 AGENDA Opening and Welcome Introductions


  1. Appointment of Multi-Disciplinary Professional Team to conduct a detailed re-inspection of construction work done by various contractors on the North Gauteng Testing Corridor. 26 September 2019

  2. AGENDA  Opening and Welcome  Introductions  Attendance register  Presentation  Q & A 2

  3. SCOPE OF WORKS Appointment of Multi-Disciplinary Professional Team (quantity surveyor, civil, mechanical and electrical engineer) to conduct a detailed re- inspection of construction work done by various contractors on the North Gauteng Testing Corridor (18 Stations) and 4 Staging Yards.  Comparison between the initial B.o.Q. and the change in scope of works,  Physical construction works inspection and confirmation of execution in-line with the B.o.Q. (original and or revised),  Review of payment certificates against actual construction works executed,  Review of Final Accounts against final construction works executed, and  Review of adherence to the necessary governance processes (JBCC contract and PRASA internal policies and processes).

  4. PROJECT TIMEFRAMES Item No. Milestones Start Date End Date 1 Brieifing 19/09/2019 19/09/2019 2 Closing Date 11/10/2019 11/10/2019 3 Award 14/10/2019 25/10/2019 4 Signing of contract 31/10/2019 07/11/2019 5 Site Verification 11/11/2019 22/11/2019 6 Draft Report 25/11/2019 29/11/2019 7 Final Report 02/12/2019 09/12/2019

  5. CORRIDOR LAYOUT – Site verification important

  6. WORK COMPLETED ON EACH STATION 1 Rissik, Station building upgrade, Ablutions, 62 males,19 Projects Mpfumelelo Construction and Hartebeesspruit, Platform resurfacing, Station females=81 complete SRSQS- Quantity Surveyors as R16.9m Koedoespoort and fencing, Platform facilities, Signage lead Consultants Silverton Stations Electrical and Plumbing 2 48 males,14 Projects Mears, Walker, Ticket office, Platform resurfacing, Chryselda Construction/Hlekabo females=62 complete Devenish and tactile to replace the yellow line, Trading Enterprise JV R13.8m Loftus Train Signage, platform facilities, fencing, andSRSQS- Quantity Surveyors Stations electrical and plumbing as lead Consultants 3 Mabone Building 33 males,9 Projects Rebecca, Pretoria Ticket office, Platform resurfacing, Contractors/Striving mind trading females=43 complete West and Barrack platform facilities, fencing, ablution, R9.2m JV and SRSQS- Quantity Stations electrical and plumbing Surveyors as lead Consultants 4 Eersterust, Station building upgrade, Ablutions, 56 males,19 Projects Swihluke/Skirro Joint Venture Denneboom and Platform resurfacing, Station females=73 complete and SRSQS- Quantity Surveyors R15.2m Eerste Fabrieke fencing, Platform facilities, as lead Consultants Train Stations Electrical and Plumbing 5 Saulsville, Station building upgrade, Ablutions, 38males,10 Projects Machabachaba Construction Kalafong and Platform resurfacing, Station females=48 complete SRSQS- Quantity Surveyors as R12.5m Elektro Train fencing, Platform facilities, lead Consultants Stations) Electrical and Plumbing Station building upgrade, 15 males,2 females=17 Ablutions, Platform resurfacing, Zethu Consulting/Khulani Bosman Station Station fencing, Platform R5.5m Contractors Joint Venture facilities, Electrical and Plumbing

  7. VERIFICATION OF 4 STAGING YARDS

  8. SCOPE DEFINITION & ELEMENTS

  9. Upgraded Ablutions Vandal Proof toilets Covered Subway – weather protection

  10. Question and answers 10