Appointment of Multi-Disciplinary Professional Team to conduct a detailed re-inspection of construction work done by various contractors on the North Gauteng Testing Corridor. 26 September 2019
AGENDA Opening and Welcome Introductions Attendance register Presentation Q & A 2
SCOPE OF WORKS Appointment of Multi-Disciplinary Professional Team (quantity surveyor, civil, mechanical and electrical engineer) to conduct a detailed re- inspection of construction work done by various contractors on the North Gauteng Testing Corridor (18 Stations) and 4 Staging Yards. Comparison between the initial B.o.Q. and the change in scope of works, Physical construction works inspection and confirmation of execution in-line with the B.o.Q. (original and or revised), Review of payment certificates against actual construction works executed, Review of Final Accounts against final construction works executed, and Review of adherence to the necessary governance processes (JBCC contract and PRASA internal policies and processes).
PROJECT TIMEFRAMES Item No. Milestones Start Date End Date 1 Brieifing 19/09/2019 19/09/2019 2 Closing Date 11/10/2019 11/10/2019 3 Award 14/10/2019 25/10/2019 4 Signing of contract 31/10/2019 07/11/2019 5 Site Verification 11/11/2019 22/11/2019 6 Draft Report 25/11/2019 29/11/2019 7 Final Report 02/12/2019 09/12/2019
CORRIDOR LAYOUT – Site verification important
WORK COMPLETED ON EACH STATION 1 Rissik, Station building upgrade, Ablutions, 62 males,19 Projects Mpfumelelo Construction and Hartebeesspruit, Platform resurfacing, Station females=81 complete SRSQS- Quantity Surveyors as R16.9m Koedoespoort and fencing, Platform facilities, Signage lead Consultants Silverton Stations Electrical and Plumbing 2 48 males,14 Projects Mears, Walker, Ticket office, Platform resurfacing, Chryselda Construction/Hlekabo females=62 complete Devenish and tactile to replace the yellow line, Trading Enterprise JV R13.8m Loftus Train Signage, platform facilities, fencing, andSRSQS- Quantity Surveyors Stations electrical and plumbing as lead Consultants 3 Mabone Building 33 males,9 Projects Rebecca, Pretoria Ticket office, Platform resurfacing, Contractors/Striving mind trading females=43 complete West and Barrack platform facilities, fencing, ablution, R9.2m JV and SRSQS- Quantity Stations electrical and plumbing Surveyors as lead Consultants 4 Eersterust, Station building upgrade, Ablutions, 56 males,19 Projects Swihluke/Skirro Joint Venture Denneboom and Platform resurfacing, Station females=73 complete and SRSQS- Quantity Surveyors R15.2m Eerste Fabrieke fencing, Platform facilities, as lead Consultants Train Stations Electrical and Plumbing 5 Saulsville, Station building upgrade, Ablutions, 38males,10 Projects Machabachaba Construction Kalafong and Platform resurfacing, Station females=48 complete SRSQS- Quantity Surveyors as R12.5m Elektro Train fencing, Platform facilities, lead Consultants Stations) Electrical and Plumbing Station building upgrade, 15 males,2 females=17 Ablutions, Platform resurfacing, Zethu Consulting/Khulani Bosman Station Station fencing, Platform R5.5m Contractors Joint Venture facilities, Electrical and Plumbing
VERIFICATION OF 4 STAGING YARDS
SCOPE DEFINITION & ELEMENTS
Upgraded Ablutions Vandal Proof toilets Covered Subway – weather protection