A project in Seattle with a 30,000 square feet total site area is planning to earn the A. 4,500 credit under Site Development for on-site B. 5,000 restoration. What is the minimum amount C. 6,000 of native/adapted vegetation the site D.


  1. A project in Seattle with a 30,000 square feet total site area is planning to earn the A. 4,500 credit under Site Development for on-site B. 5,000 restoration. What is the minimum amount C. 6,000 of native/adapted vegetation the site D. 7,000 should have in-place to promote biodiversity? Answer

  2. The total site area for a retail project is 45,000 sq.ft. How much should be the A. $200 minimum financial contribution to earn SS B. $225 credit 1- site development? C. $450 D. $500 Answer

  3. A School project is planning to earn SS credit - rainwater management. What is A. 1 the maximum number of point that the B. 2 school can earn under this credit? C. 3 Answer

  4. What is the maximum number of point A. 1 that a retail project can earn under the B. 2 credit joint use of facilities? C. 3 D. None Answer

  5. Within how many days of inspection A. 30 should the maintenance, repairs and B. 60 stabilization be done under SS Credit - C. 90 Rainwater management? D. 120 Answer

  6. A project located in downtown Atlanta has total site area of 45,000 sq.ft. The site has A. 1500 5,000 sq.ft. of impervious area. How much B. 2000 water has to be captured and treated C. 2500 using GI and LID practices in order to earn D. 4000 exemplary performance under SS credit - rainwater management? Answer

  7. How often should the high-reflectance A. Every year roof surface be cleaned for Option 2. roof B. Once every 2 years under Heat Island Reduction credit? C. Once every 3 years D. Once every 5 years Answer

  8. The illumination level measured with the A. 10% lights on must not be more than _____% B. 20% above the level measured with lights off C. 30% for light pollution reduction credit. D. 35% Answer

  9. The project is planning to earn light A. 8 measurements and 100 feet spacing pollution reduction credit using perimeter B. 10 measurements and 100 feet spacing measurement option. How many C. 5 measurements and 100 feet spacing measurements are required and with how D. 2 measurements and 100 feet spacing much spacing between them. Answer

  10. What are the topics that site improvement A. Hydrology plan should include in order to attain SS B. Vegetation credit site improvement plan C. Soils credit?(Choose 3) D. Energy E. Water F. Indoor Air Quality Answer