S E RT T COM OMPA PANY NY LT LTD. D. FO FOR OI OIL L SER SERVI VICES CES
1- Background • SERT CO. LTD. For Oil services is a private entity established in Iraq with headquarters in Baghdad and its subsidiaries in UAE – Dubai and in Istanbul – Turkey • SERT was established with a vision of serving E&P operators as an EPCC contractor • SERT Delivers a wide range of services, including: - EPC - Project Managements Consultancy - Site surveys - Procurement - Installation, Erection and Construction - Pre-commissioning, testing & commissioning - HAZOP Studies - Material Selection report for New Project
• Baghdad Head office AL Watheq Sq. P.O.Box: 3055 AL-Elweya-Baghdad-Iraq Phone: +964 7830877779 ADDRESS sertco@yahoo.com , www.sertoil.com • Basrah Site Camp and Workshops North Rumaila- Basrah-Iraq Phone: +964 7830877779 • Missan Site Camp Halfaya Oil Filed-AL-Kahla- Missan- Iraq Phone: +964 7830877779 • Missan Site Camp BUZURGAN Oil Filed-Missan- Iraq Phone: +964 7830877779
2- Details Certification SERT has the following Certification - ISO 9001 :2015(Quality Managements System), QMS is ISOs Standard set for organization management System - ISO 14001: 2015 ( Environmental Management System), EMS, among other things, enables us to identify and control the environmental impact of our activates. - OHSAS 18001:2007 (Occupational Health & Safety Managements System) to control occupational health and Safety risks - ISO/ TS 29001:2010, SOC EPCC for Energy , Natural Gas and Petroleum Facility
3-References SERT works as EPCC contractor with Following companies SERT works with the following main vendors
4- Completed Sample Projects by SERT • Source water treatment Plant Complementary basic design and full detail design of SWP in Halfya oil filed (Total Capacity 23,500 M3/d) consist to the following - Water Intake System - Source Water Treated System - Clean Water Transport System - Fire Fighting System - Utility System - Power Distribution System - Instrumentation & Control System, - OCC SCADA System. - Telecommunication System
• Central Process Facility Expansion CPF Complementary basic design and full detail designs of CPF1 Expansion in Halfya oil filed consist to the following - Expansion the main Production header - Installation new 2 multi flow valve selector - Installation SDV System - Installation & commissioning Scada and DCS system
• Manufacturing and Erection of Crude oil Tanks Complementary basic design of 4X5000 m3 and 4x10000 m3 crude oil Tanks in Basra consist to the following - Manufacturing and Erection - Installation of gas boot System - Installation of foam pump - Installation of spray and foam units - Installation of LP fuel gas scrubber - Installation of water draw-off pump
• POWER SUPPLY TO WELL PADS FOR FCP SUSTAINED PROJECT Complementary detail design of OHTL in Halfya oil filed consist to the following: - Pre-fabricated outdoor substation (POS) - Auxiliary facilities - 33 kV OHTL - T-off of power line to pad/wellheads - Power distribution system - MV/LV Cable system - Lighting system
• OIL AND GAS TRUNK LINES Complementary full detail design of 130 KM (24 ” , 20 ” , 18 ” & 12 ” ) Trunk lines - Installation launcher & receiver - Installation Cathodic protection System - Installation FOC and connecting with RTU - Nitrogen Injection - Pigging & Cleaning
S ERT STRATEGY AND GOAL • CONCENTRATE ON THE COMPLETION TARGET DATE • FOLLOW COMPANY INSTRUCTIONS • TAKING OFFICE WORK PARALLEL TO PHYSICAL ACTIVITIES • DEPENDING ON THE WORK INTENSITY, SERT HAS FLEXIBILITY TO INCREASE THE NUMBER OF STAFF AND EQUIPMENTS AS NECESSARY • SERT IS PLANING AND IMPLEMENTING ACCORDINGLY • METEOROLOGICAL CONDITION (HEAVY RAIN STORMS), CUSTOM CLEARANCE PROBLEMS, VISA PROBLEMS OF EXPAT WORKERS IS NOT OF ANY CONCERN FOR SERT. ALL THESE PROBLEMS INCLUDED IN THE SERT PLANS
Recommend
More recommend