A1307 Cambridge South East Transport Study Local Liaison Forum 12 th September 2018 Greater Cambridge Partnership
General Progress – Phase 1 scheme design development • Current work on scheme design − Review of previous work − 2018 consultation comments − Value Engineering workshop − Discussions with key stakeholders • Surveys • Programming of works Image source: https://www.greatercambridge.org.uk/transport/transport- projects/cambridge_south_east_study/ Mott MacDonald | Presentation 2 12 September 2018
Scheme 1 – Granham’s Road junction Linton Greenway Proposed right turn lane 30mph speed Remove existing island limit to be extended south Mott MacDonald | Presentation 3 12 September 2018
Scheme 2 – Babraham P&R Additional Cycle Parking Location of proposed cycle parking Mott MacDonald | Presentation 4 12 September 2018
Scheme 3 – Linton Greenway Widen existing Widen existing Existing route Signal crossing Options being On road route reassessed here Widen existing Widen existing Cross via new signals Mott MacDonald | Presentation 5 12 September 2018
Scheme 4/5 – Haverhill Road/ Wandlebury Underpass Realigned Haverhill Road Proposed underpass with pedestrian/ cycle route connection Mott MacDonald | Presentation 6 12 September 2018
Scheme 6 – Babraham Research Campus Roundabout Proposed signalised crossing Mott MacDonald | Presentation 7 12 September 2018
Scheme 7 – Eastbound Bus Lane near A11/ High Street, Babraham Proposed bus lane Proposed signal crossing Proposed bus lane End of bus lane Mott MacDonald | Presentation 8 12 September 2018
Scheme 8 – A11 Multi-user Crossing Existing footbridge amendments Connection to former A11 and Granta Park Equestrian route via underpass Mott MacDonald | Presentation 9 12 September 2018
Scheme 9 – Hildersham Crossroads Proposed signal crossing Mott MacDonald | Presentation 10 12 September 2018
Scheme 10/11 (Interim) – Dalehead Foods Access Mott MacDonald | Presentation 11 12 September 2018
Scheme 10/11 – Dalehead Foods to Linton Village College Mott MacDonald | Presentation 12 12 September 2018
Scheme 12 – Linton High Street Signalise junction Proposed right turn ban being reviewed following 2018 consultation Mott MacDonald | Presentation 13 12 September 2018
Scheme 13/14 – Linton Bus Improvements/ Westbound Bus Lane Proposed bus lane Proposed bus lane Proposed bus lane Mott MacDonald | Presentation 14 12 September 2018
Scheme 15 – Linton Rural Hub Proposed parking Alternative layouts/ alignments being considered at present Realigned arm Mott MacDonald | Presentation 15 12 September 2018
Scheme 16/17 – Dean Road Crossroads/ Linton to Horseheath Central reservation gap to be closed Mott MacDonald | Presentation 16 12 September 2018
Next stages • Scheme design development • Refining overall programme to develop scheme-specific programmes • Tranche 1 schemes delivery • Tranche 2 and Tranche 3 scheme development • Phase 2 development, including interface with Phase 1 and other schemes/ emerging development proposals Mott MacDonald | Presentation 17 12 September 2018