§ Ow Owne ner: Texas Department of Transportation (TxDOT) Owner Developer : Blueridge Transportation Group, LLC (BTG) § De – ACS Servicios y Concesiones.– 21.6%. – InfraRed Capital Partners. – 21.6%. Developer – Shikun & Binui Concessions USA, Inc.– 21.6%. – Northleaf Capital. – 18%. – Clal. – 12.1%. – Star America. – 5%. Equity Members § Lead C d Contractor: Almeda-Genoa Constructors (A-GC) – Dragados USA, Inc – 30%. Lead Contractor – Pulice Construction, Inc – 20%. – Shikun & Binui America – 50%. § Lead E d Engineering Fi Firm: Stantec (Formerly KBR Infra.) Joint Venture Partners § O&M : : A-GC has subcontracted with Roy Jorgensen Co. the O&M responsibilities of the Project during the Operations Lead Engineering Firm Phase 2
De Develo lope per: : Bl Bluerid idge ge Transp nsportation G n Group up, L , LLC ( (BTG) ) Leasi sing ng T TXDOT Ri Right o of W Way f for a a 5 52 y year p period f from U US59 t to C Clear C Creek (just ust so sout uth o of B Beltway 8 8) Fina nanc ncing ng, Op , Operating ng a and nd M Maint ntaini ning ng T Toll R Road a and nd G Gene neral Pur Purpose se l lane nes 3
Lead Con d Contractor or: : Al Almeda-Ge Geno noa a Con Constructor ors ( (A-GC GC) Respon onsible le f for or D Design a and Con d Construction on of of Pr Proj oject Con Constructing 1 10.3 .3 m mile les of of T Toll L oll Lanes Approximately ly 5 54 b bridg dges - 2 M Medi dical Con l Connector or r ramps f from om T Toll L oll Lanes - 8 R Ramps f for or IH IH 6 610 i interchange - 8 R Ramps f for or t the B Belt ltway 8 8 i interchange - 36 V Variou ous b bridg dges o over r roa oadw dways, r , railr lroa oad a d and b d bayou ous 4
5
* ** 6
• Demolishing & rebuilding entire interchange • Challenging bridge demolition • Excavating ponds – over 1 million cubic yard of dirt removed 7
I 610 Interchange 8
• Constructing 8 direct connect ramps • Over 5.5 miles of bridges in this interchange • Coordination with other project - Harris County Toll Road Widening (General Contractor - Pulice Construction) 9
BW 8 Interchange 10
11
Texas Medical Center 12
• Financial Close achieved on 05/09/2016 • Notice to proceed achieved October 25, 2016 • Groundbreaking Ceremony on November 15, 2016 • The plan is completing the work within 1,0 ,000 da days s (33 months) of Notice to Proceed • The critical path is controlled by the work at both the IH 610 and BW 8 interchanges. 13
Social Media § We Website – www.drive288.com § Fa Facebook – Drive288 § Tw Twitter – @drive288 § Em Email ail – info@drive288.com 14