works lockmith s and welding
play

Works Lockmiths and Welding Prask tda 155/4 500 04 Hradec Krlov - PowerPoint PPT Presentation

Works Lockmiths and Welding Prask tda 155/4 500 04 Hradec Krlov Czech Republic tel./phone: +420 498 522 111 www.wlwgroup.cz Who we are? Established on April 27, 2011 on the basis of twenty years of experience


  1. Works – Lockmith’s and Welding Pražská třída 155/4 500 04 Hradec Králové Czech Republic tel./phone: +420 498 522 111 www.wlwgroup.cz

  2. Who we are? • Established on April 27, 2011 on the basis of twenty years of experience • Installation of Technological Equipment • Manufacturing and installation of piping systems Manufacturing and installation of Steel Structures • Realization of “turnkey” investment units. With customer studies

  3. Organizational chart MANAGING DIRECTOR Marie Dvorakova BUSINESS AND HEAD OF PROJECT ACCOUNTING PRODUCTION SAFETY MANAGER QUALITY MANAGER MARKETING MANAGERS DEPARTMENT DEPARTMENT HIRING OF THE STAFF MANAGERS Josef Feifer MANPOWER PLANNING Miroslav Jakubský Zuzana Tomenukova Petr Koza Zdena Tenglerova Aleš Polák PROJECT MANAGERS INSTALLATION EXTERNAL TAX WELDING ENGINEER GROUPS (3 Persons) SPECIALIST Ing. Jiří Vlček Safety technicians 5 Site managers + 1 person - specialist for Ing. Monika Hujerova on sites French market Xavier Walch TECHNICAL AND WORKSHOP HAND OVER PRODUCTION DOCUMENTATION PURCHASE TECHNICIANS DEPARTMENT Boleslav Niedoba WORKSHOP & INSTALLATIONS STORING & TOOLS STORING EXTERNAL DESIGN OFFICE

  4. Our human resources 5% 8% 3% 5% Administration Projects managers Quality manager & International welding technologist Safety managers 79% Employed and self employed Our workers and cooperation have following authorization: Slinger, Crane Operator, mobile platform operator, Forklift Driver.

  5. Our production capacities Stainless SteelWorkshop • New areal of 8500 m ² • New workshop 1500 m ² with crane 5T • Plasma cutter 4m x 2m, Th 1,5 - 25/40 incl. Total area of the workshop: 2000 DEC 2019 pipe cutting and water spraying for m² with 5T crane stainless steel cutting

  6. Our production capacities Transporters x5 TIG welding machine x15 MIG / MAG welding machine x5 Ventilated welding helmet x5 Drill press x2 Band-saw x1 George fisher x3 x2 Hand Plasma cutter x2 1.6T Forklift x1 3.5T Forklift

  7. Full Investment Unit Management Painting Site Scaffolding facilities Transport Electro + on site MaR "Turnkey„ Projects CNC Insulation machining Plastic NDT piping Mechanism

  8. Certifications and Authorizations Certifications : • Execution of steel structures - EN 1090-2 • Pressure vessels - PED 2014/68 / EU (PED: Pressure Equipment Directive). • Quality requirements for fusion welding processes - ČSN EN ISO 3834 -2: 2006 Authorizations : • Installation and repair of a dedicated gas equipment - type a, b, c, d, e, f, g -TICR (Technical Institute of the Czech Republic) • Production, installation and repair of a dedicated pressure equipment • Installation and repair of technical equipment dedicated to gas and technical equipment under pressure - mining areas - issued by the mining office.

  9. Our Welding qualification • FM4 - FM1 - CS o Th = 1 mm to Inf Proc : 135 / 141 + 111 o Ø 25 to Inf • FM5 - SS o Th = 1 mm to Inf m Proc 141 + 111 o Ø 12 to Inf • W41 - Ni o Th = 2.8 to 5.6 mm Proc 141 o Ø 30.15 to Inf • Position H-L045 • EN ISO 9606-1

  10. Our mobility Installation works: • Czech Repulic • Slovakia • Norway • Faroe Island • United Kingdom • Germany • France • Slovenia • Spain • Switzerland • Poland Deliveries: • Russia • Pakistan • Belgium • Mexico

  11. Our achievements in pictures… • Supply, pre-assembly and installation of ON & OFF SKID – Process equipment of hydrogen production plant. Delivery to Russia at Antipinsky. • 30.000 Nm3 / h hydrogen plant • Packing in containers incl. necessary marking • Builder folder (according ASME norm) and installation folder

  12. Stainless steel piping production for Pakistan • Petrochemical sector • Line identification, production of the manufacturer's file and assembly • 22 containers of 85m3

  13. Production and installation of stainless steel platform for food industry

  14. Stainless steel pipe installation (double jacket piping) for food industry next ..

  15. Realization of Skid units

  16. Transport on the position of heavy equipment

  17. Installation of technological equipment • Autoclave installation for AirFrance, Paris CDG. • Electrical connection and pipe.

  18. Industrial displacement • From Spain to the Czech Republic • Combination of new technology with the old one – e.g. green tower

  19. CS Cabot – Soot Production • Dismantling ducts and existing steel structure • Manufacture and installation new steel structure • Disassembly of old exchanger • Manufacture and installation of a new heat exchanger of about 48T • Connection of the heat exchanger with new pipes to the existing lines. 1st CABOT Safety Challenge on 12 subcontractors

  20. Tanks and vessels Vessels installation Cooperation with vessel producers Production of small pressure tanks according to PED

  21. Galvanizing Basin Manufacturing Delivery for Mexico

  22. Piping

  23. Conclusion / Contact • Wide spectrum of activities Steel Structures / Piping / Technology - Installation Production from different type of materials • Long-term cooperation with verified subcontractors • Quality and safety monitoring • Big scale of Certification • Open to innovation

Recommend


More recommend