us 41 sr 45 south 50 th street at csx grade separation
play

US 41/SR 45/South 50 th Street at CSX Grade Separation Design - PowerPoint PPT Presentation

US 41/SR 45/South 50 th Street at CSX Grade Separation Design Change Re-evaluation AGENCY/ELECTED OFFICIALS KICK-OFF MEETING December 7, 2018 Project Overview Project purpose: - Fix CSX Queues - Improve operations at US 41 & SR 676


  1. US 41/SR 45/South 50 th Street at CSX Grade Separation Design Change Re-evaluation AGENCY/ELECTED OFFICIALS KICK-OFF MEETING December 7, 2018

  2. Project Overview Project purpose: - Fix CSX Queues - Improve operations at US 41 & SR 676 (Causeway Blvd) Intersection - Improve safety for vehicles, pedestrians, and bicyclists Need for re-evaluation: - Time since last approved PD&E study - Changes in land use and traffic volumes - Address environmental and stakeholders concerns

  3. Project Location Project Limits: South of US 41B/SR 45/SR 676/Causeway Boulevard to North of Causeway Boulevard Approximately 1.5 miles Includes the CSX railroad crossing south of St. Paul St Studying intersection improvement alternatives including a grade separation at the CSX railroad crossing

  4. Previous Efforts Environmental Assessment with a Feasibility Study Finding of No Significant Impact (FONSI) completed in 2017 approved in 1994

  5. Ongoing Efforts Kick-off of project completed with FDOT District 7 July 18, 2018 Re-evaluating the PD&E study findings (EA with FONSI) Using the feasibility study (2017) to refine alternatives to be brought to the public - Applying new FDOT design criteria - Determine needs from updated traffic projections Preparing for both an alternatives public meeting to present refined alternatives and public hearing in 2019 Coordinating to begin preliminary design activities through the FDOT SWAT process

  6. SWAT P T Process ss S tate w ide A cceleration T ransformation process Purpose: to begin concurrent design activities within our re-evaluation process PD&E/ PD&E/ Re-evaluation Re-evaluation Design Design Project Completion Process SWAT Process

  7. Alternative 1 • Option 1B • US 41 Grade Separation at CSX • Flyover for Northbound to Westbound Movement • DS = 30 mph • Causeway Blvd. Widening to the North This is a conceptual level graphic/table/graph created for planning and discussion purposes only. It is not intended for use in PD&E, design, or construction.

  8. Alternative 1 Revised SR 45 (US 41) S. 45th St. S. 47th St. • El Camino Blanco Blvd. Option 1B • US 41 Grade Separation at SR 676 (Causeway Blvd.) CSX S. 47th St. CSX Railroad • Flyover for Northbound to Westbound Movement • DS = 50 mph • St. Paul St. Causeway Blvd. Widening to the CSX Railroad South • Dead-End Frontage Road from St. S. 34th Ave. Sagasta St. Paul St. Legend Columbia St. 36th Ave. S. Columbia St. Existing Right-of-Way Existing Parcel Lines Raleigh St. Proposed Right-of-Way Proposed Pavement Proposed Bridges Impacted Parcels This is a conceptual level graphic/table/graph created for planning and discussion purposes only. It is not intended for use in PD&E, design, or construction.

  9. Alternative 2 • Option 1C • US 41 Grade Separation at CSX • Flyover for Northbound to Westbound Movement • DS = 30 mph • Flyover for Thru Movement • Causeway Blvd. Widening to the North This is a conceptual level graphic/table/graph created for planning and discussion purposes only. It is not intended for use in PD&E, design, or construction.

  10. Alternative 2 SR 45 (US 41) Revised 24th Ave. S. • Option 1C • US 41 Grade Separation at CSX S. 47th St. S. 45th St. El Camino Blanco Blvd. • Flyover for Northbound to SR 676 (Causeway Blvd.) Westbound Movement • S. 47th St. CSX Railroad DS = 50 mph • Flyover for Thru Movement • Causeway Blvd. Widening to the South St. Paul St. CSX Railroad • Northbound to Eastbound Crosses Legend CSX At-grade Existing Right-of-Way S. 34th Ave. Existing Parcel Lines Sagasta St. Proposed Right-of-Way Proposed Pavement Columbia St. 36th Ave. S. Columbia St. Proposed Bridges Impacted Parcels Raleigh St. This is a conceptual level graphic/table/graph created for planning and discussion purposes only. It is not intended for use in PD&E, design, or construction.

  11. Alternative 3 • Option 2B • US 41 Grade Separation at CSX • New alignment for removing high volume Northbound to Westbound and Eastbound to Southbound movements from intersection • Flyover for Northbound to Westbound and Eastbound to Southbound Movements • DS = 30 mph This is a conceptual level graphic/table/graph created for planning and discussion purposes only. It is not intended for use in PD&E, design, or construction.

  12. Alternative 3 Revised S. 45th St. S. 47th St. • El Camino Blanco Blvd. Option 2B • SR 676 (Causeway Blvd.) US 41 Grade Separation at CSX S. 47th St. CSX Railroad • New alignment for removing high volume Northbound to Westbound and Eastbound to St. Paul St. Southbound movements from CSX Railroad intersection • Flyover for Northbound to S. 34th Ave. Sagasta St. Westbound and Eastbound to Legend Columbia St. 36th Ave. S. Columbia St. Southbound Movements Existing Right-of-Way Existing Parcel Lines • DS = 50 mph Raleigh St. Proposed Right-of-Way • Proposed Pavement Dead-End Frontage Road from St. Proposed Bridges Paul St. Impacted Parcels This is a conceptual level graphic/table/graph created for planning and discussion purposes only. It is not intended for use in PD&E, design, or construction.

  13. Alternative 4

  14. Anticipated Public Involvement Schedule 2018 2019 2020 Summer Fall Winter Spring Summer Fall Winter Spring Summer Study Begins Newsletter #1 Data Collection Engineering & Environmental Analysis Newsletter #2 Alternatives Public Workshop Newsletter #3 Public Hearing Newsletter #4 Study Complete Design Activities Begin

  15. Submit a comment (at any point in the study) • In person/mail: Lilliam Escalera Florida Department of Transportation 11201 N. McKinley Drive, MS 7-500 Tampa, FL 33612 • Email: Lilliam.Escalera@dot.state.fl.us • Project Website: Your input is http://active.fdotd7studies.com/us41/csx-tosr676 valued (All comment submittal info is included in your handout) throughout the Attend our public meetings re-evaluation • Alternatives Public Meeting: Spring 2019 • Public Hearing: Winter 2019 *Check our project website if you ever need a reminder of the schedule or current activities…

  16. DI DISCU CUSSION

Recommend


More recommend