UC SANTA CRUZ STUDENT HOUSING WEST DAB REVIEW 16 APRIL 2016 100% - PowerPoint PPT Presentation

UC SANTA CRUZ STUDENT HOUSING WEST DAB REVIEW 16 APRIL 2016 100% SCHEMATIC DESIGN REVIEW Team Commitment Project Evolution Project Tenets 1. Nature as Guide 2. Reducing Scale 3. Placemaking 4. Building Community Architecture Team


  1. UC SANTA CRUZ STUDENT HOUSING WEST DAB REVIEW 16 APRIL 2016 100% SCHEMATIC DESIGN REVIEW

  2. Team Commitment Project Evolution Project Tenets 1. Nature as Guide 2. Reducing Scale 3. Placemaking 4. Building Community Architecture

  3. Team Commitment Project Evolution Project Tenets 1. Nature as Guide 2. Reducing Scale 3. Placemaking 4. Building Community Architecture

  4. “ An Architecture here “…. The University belongs to a complex must grow out of the history of interactions problems, restrictions and transformations- and potentialities of it is a composite the site..." environment always being assembled and Tommy Church reassembled with founding UCSC Campus Landscape Architect friction and difficulty. ” - In the Ecotone- The UC Santa Cruz Campus, James Clifford

  5. “Build many trails, reveal many places where a student, or a teacher, or an administrator could sit in a quiet hour with only the Redwoods... ” -Ansel Adams

  6. 1. 2. 3. Initial RFP RFP Concept Phase Schematic Design UG, G, F UG, G, F UG, G

  7. PROJECT TENETS 1. Nature as a Guide 2. Reducing Scale 3. Placemaking 4. Building Community

  8. PROJECT TENETS 1. Nature as a Guide 2. Reducing Scale 3. Placemaking 4. Building Community

  9. Zero-Net-Energy - use less energy Zero-Net-Water - use less water Zero-Net-Waste - consume less materials Our approach - A Simple Formula: Efficient Buildings & Site + Innovative Infrastructure + Demand Management

  10. Drainage Student Housing West Arboretum

  11. 1 2 4 3 5 6 7 50% Schematic Design Current

  12. PROJECT TENETS 1. Nature as a Guide 2. Reducing Scale 3. Placemaking 4. Building Community

  13. RESTORATION OF NATURAL LANDSCAPE AND FOREST

  14. HIGHER DENSITY BUILDINGS MIMIC FOREST EDGE

  15. “EDGE” IS PERFORATED TO PROVIDE VISUAL RELIEF AND PHYSICAL CONNECTION TO FOREST

  16. LOWER DENISTY BUILDINGS DEFINE COURTYARDS WITHIN THE FOREST “CLEARING”

  17. AN INTEGRATED CIRCULATION ROUTE TIES UNDERGRADUATE AND GRADUATE BUILDINGS TOGETHER WITHIN THE LANDSCAPE

  18. THE SOUTHERN COURTYARD IS ACTIVATED WITH PUBLIC “HUBS”; THE HUBS PROMOTE CONNECTION TO THE BROADER CAMPUS COMMUNITY

  19. PORTER QUAD PORTER QUAD COWELL PLAZA COWELL PLAZA

  20. PROJECT TENETS 1. Nature as a Guide 2. Reducing Scale 3. Placemaking 4. Building Community

  21. 1 2 4 3 5 6

  22. PASSAGE CLEARING

  23. 1 CLEARING 2 PASSAGE 4 3 5 R D VIEWS R 6 E L L E H LEGEND COMPONENTS PASSAGE VIEWS CLEARING

  24. LEGEND COMPONENTS PASSAGE VIEWS CLEARING

  25. TOPOGRAPHY

  26. 3 5 6 4 2 1 H E L L E R D R

  27. PROJECT TENETS 1. Nature as a Guide 2. Reducing Scale 3. Placemaking 4. Building Community

  28. BUILDING 4 HUB BUILDING 5 HUB

  29. Overall Gross Square Feet (OGSF) Level Area B1 LOWER LVL 1 3316 B1 LEVEL 01 28000 B1 LEVEL 02 28000 B1 LEVEL 03 26190 B1 LEVEL 04 26190 B1 LEVEL 05 26190 B1 LEVEL 06 26190 B1 LEVEL 07 26190 DN B1 LEVEL 08 26190 UP 216456 UP DN 0A_Program Areas_Unit Accessibility Mix Unit A - Studio Triple UG01 56 480 SF 3 168 3 1 4 1 55 Unit B - 2BR Shared UG22 30 817 SF 4 120 1 1 2 1 29 Unit C - 3BR Private UG31-ADA 7 719 SF 3 21 5 2 2 1 5 Unit D - 3BR Hybrid UG31 1 719 SF 4 4 0 0 1 1 0 Date Issued For Unit E - 4BR Private UG41 102 900 SF 4 408 0 0 4 4 0 3/23/18 100% SD Unit F - 4BR-Ext Private UG41B-ADA 1 1013 SF 4 4 0 1 0 1 0 Unit G - 4BR-Ext Hybrid UG41B 7 1013 SF 5 35 0 0 1 1 0 Unit H - 2BR CRE CRE21 2 817 SF 1 2 0 1 1 1 1 UP Building Total : 206 206 762 9 6 15 11 90 DN UP UP DN UP Overall Gross Square Feet (OGSF) Level Area B1 LOWER LVL 1 3316 B1 LEVEL 01 28000 B1 LEVEL 02 28000 B1 LEVEL 03 26190 B1 LEVEL 04 26190 B1 LEVEL 05 26190 B1 LEVEL 06 26190 B1 LEVEL 07 26190 DN B1 LEVEL 08 26190 UP 216456 DN DNUP UP DN 0A_Program Areas_Unit Accessibility Mix UP DN Unit A - Studio Triple UG01 56 480 SF 3 168 3 1 4 1 55 Unit B - 2BR Shared UG22 30 817 SF 4 120 1 1 2 1 29 Unit C - 3BR Private UG31-ADA 7 719 SF 3 21 5 2 2 1 5 Unit D - 3BR Hybrid UG31 1 719 SF 4 4 0 0 1 1 0 Date Issued For Unit E - 4BR Private UG41 102 900 SF 4 408 0 0 4 4 0 3/23/18 100% SD Unit F - 4BR-Ext Private UG41B-ADA 1 1013 SF 4 4 0 1 0 1 0 Unit G - 4BR-Ext Hybrid UG41B 7 1013 SF 5 35 0 0 1 1 0 Unit H - 2BR CRE CRE21 2 817 SF 1 2 0 1 1 1 1 UP Building Total : 206 206 762 9 6 15 11 90 DN UP DN BUILDING 1 TYPICAL FLOOR A-B1-001 UP UP DN UP BUILDING 1 GROUND FLOOR DN DNUP UP DN UP DN A-B1-001

  30. UG41

  31. UG42 - EXTENDED

  32. UG31

  33. UG31 - ADA

  34. UG22

  35. UG01

  36. CRE21

  37. Team Commitment Project Evolution Project Tenets 1. Nature as Guide 2. Reducing Scale 3. Placemaking 4. Building Community Architecture

  38. EARTH, MEADOW, FOREST, BARK

  39. BASE PRECAST UNIT

  40. PRECAST PROCESS

  41. FOREST TYPE EARTH TYPE PRECAST PROCESS

  42. VIRTUAL TOUR