SUCCESSOR AGENCY TO THE SAN FRANCISCO REDEVELOPMENT AGENCY OSCAR PARK DRAFT CONCEPT DESIGN SEPTEMBER 11, 2012 D D D D G G E E A A A Y B B R R I I Transit District Site Context Oscar Park and Essex Street Improvements - 75%


  1. SUCCESSOR AGENCY TO THE SAN FRANCISCO REDEVELOPMENT AGENCY OSCAR PARK DRAFT CONCEPT DESIGN SEPTEMBER 11, 2012

  2. D D D D G G E E A A A Y B B R R I I Transit District Site Context Oscar Park and Essex Street Improvements - 75% Concept Design Phase Folsom Street Improvements - 95% Schematic Design Transbay District Redevelopment Area CMG scope of improvements Per 2006 Transbay Redevelopment Project Area Streetscape & Open Space Concept Plan TRANSBAY DISTRICT: OSCAR PARK CONCEPT DESIGN

  3. 11 SEPTEMBER 2012 NORTH NORTH SBCA

  4. OSCAR PARK PLAN - WITH RAMP AND OFFRAMP OSCAR PARK PLAN - WITHOUT RAMP AND OFFRAMP HOWARD ST. HOWARD ST. TJPA BUS RAMP, ABOVE TEHAMA ST. TEHAMA ST. CALTRANS FREMONT ST. OFFRAMP, ABOVE CLEMENTINA ST. FOLSOM ST. FOLSOM ST. ESSEX ST. 1ST ST. ESSEX ST. 1ST ST. HARRISON ST. HARRISON ST. TRANSBAY DISTRICT: OSCAR PARK CONCEPT DESIGN

  5. OSCAR PARK PLAN - CLEMENTINA ST. ZOOM HOWARD ST. HOWARD TERRACE BIKE PATH TEHAMA ST. GARDEN BEER GARDEN PLAY ZONE TERRACE CLEMENTINA ST. CLEMENTINA GREEN FOLSOM BEACH FOLSOM ST. MATCH LINE 11 SEPTEMBER 2012 NORTH SBCA

  6. MATCH LINE FOLSOM ST. BASKETBALL COURT ESSEX ST. GUY PL. DOG PARK GUY PLACE SLIDE LANSING STAIR LANSING ST. HARRISON ST. TRANSBAY DISTRICT: OSCAR PARK CONCEPT DESIGN

  7. VINE WALL BIKE PARKING & REPAIR AREA MURAL WALL BLEACHER SEAT TERRACE PARK BIKE PATH 11 SEPTEMBER 2012 NORTH SBCA

  8. HOWARD STREET TEHAMA STREET 2 CLEMENTINA STREET CLEM MENTINA A STREET FOLSOM STREET SECOND STREET GUY PLACE ESSEX STREET FIRST STREET HARRISON STREET TRANSBAY DISTRICT: OSCAR PARK CONCEPT DESIGN

  9. COURT SPORTS + EXERCISE PLAYGROUND STATIONS CLEMENTINA STREET SUN DECK OPTION 1: “SHARED BOARDWALK THROUGH PUBLIC WAY” STORM WATER TREATMENT GARDENS PORCH SWINGS 41 TEHAMA PLAZA CLEMENTINA STREET BEER GARDEN 41 TEHAMA PROPERTY LINE 11 SEPTEMBER 2012 NORTH SBCA

  10. VARIES 5’ MIN. 4’ 25’ 16’ 12’ 8’ 4’ 6’ 40’ GARDEN WITH SEATING DECK PLAY AREA DRIVE BOARDWALKS AISLE PEDESTRIAN SAFE ZONE PARKING STALL TREE PLANTING & TEXTURED PAVING BAND PEDESTRIAN SAFE ZONE 120’ +/- TRANSBAY DISTRICT: OSCAR PARK CONCEPT DESIGN

  11. 77’ 41 TEHAMA PROPERTY LINE 12’ 8’ 100’ +/- 10’ 10’ 35’ 8’ 12’ CLEMENTINA TEHAMA SIDE- TEHAMA PLAZA STAIR BEER GARDEN SIDE- STREET STREET WALK WALK PORCH SWING TERRACE 170’ +/- 11 SEPTEMBER 2012 NORTH SBCA

  12. TRANSBAY DISTRICT: OSCAR PARK CONCEPT DESIGN

  13. 11 SEPTEMBER 2012 NORTH SBCA

  14. TRANSBAY DISTRICT: OSCAR PARK CONCEPT DESIGN

  15. HOWARD STREET TEHAMA STREET 3 CLEMENTINA STREET FOLSOM STREET SECOND STREET GUY PLACE ESSEX STREET FIRST STREET HARRISON STREET NORTH 11 SEPTEMBER 2012 NORTH CLEMENTINA STREET AND FOLSOM STREET- BIRD’S EYE VIEW: From above Clementina Street looking south towards Folsom Street. SBCA

  16. “FOLSOM BEACH” SLOPED PUBLIC ART LAWN (ARTIST TO BE DETERMINED) FLEXIBLE EVENT + PLAY CLIMBING STRUCTURE SPACE UNIQUE CULTURAL + RETAIL SPACES CLEMENTINA STREET OPTION 2: CLOSURE CLEMENTINA STREET TRANSBAY DISTRICT: OSCAR PARK CONCEPT DESIGN

  17. VARIES: 28’ - 48’ 15’ VARIES: 60’ - 100’ 12’ 10’ 10’ 8’ CULTURAL + CAFE SEATING FLEXIBLE EVENT + PLAY SPACE STAGE WALK PLANTING 2-WAY COMMERCIAL SPACE BIKE PATH 185’ +/- 11 SEPTEMBER 2012 NORTH SBCA

  18. 12’ 115’ +/- 15’ +/- 15’ +/- 10’ +/- VARIES 12’ FOLSOM CLEMENTINA FLEXIBLE EVENT + PLAY SPACE EMBANKMENT LANDING + WALK PLANTING SIDEWALK STREET STREET WITH SLIDE TERRACE 185’ +/- TRANSBAY DISTRICT: OSCAR PARK CONCEPT DESIGN

  19. 11 SEPTEMBER 2012 NORTH SBCA

  20. HOWARD STREET TEHAMA STREET CLEMENTINA STREET 4 FOLSOM STREET SECOND STREET GUY PLACE ESSEX STREET S REET FIRST STREET E S X ST T E SE E E ES R T S X E HARRISON STREET REET S S E NORTH FOLSOM STREET TRANSBAY DISTRICT: OSCAR PARK CONCEPT DESIGN

  21. GUY PLACE SLIDE REBUILT LANSING STAIR RENE CAZENAVE APARTMENTS: CURRENTLY UNDER CONSTRUCTION REDWOOD GROVE DOG PARK T E E R T BASKETBALL S X COURT E S S E FOLSOM STREET OSCAR PARK 11 SEPTEMBER 2012 NORTH SBCA

  22. 16’ +/- 10’ 15’ 11’ 8’ 10’ 10’ 80’ RENE CAZANAVE CAFE SIDE- PLANTING TRANSIT AUTO AUTO SIDE- BASKETBALL COURT + BLEACHERS APARTMENTS WALK SEATING LANE LANE LANE WALK 160’ +/- R.O.W. TRANSBAY DISTRICT: OSCAR PARK CONCEPT DESIGN

  23. 11 SEPTEMBER 2012 NORTH SBCA

  24. TRANSBAY DISTRICT: OSCAR PARK CONCEPT DESIGN

  25. END 11 SEPTEMBER 2012 NORTH SBCA

  26. Mission Creek Park, San Francisco CA Mission Creek Park, San Francisco CA New York, NY Portland, OR SOMA Skatepark, San Francisco CA (construction planned 2013) TRANSBAY DISTRICT: OSCAR PARK CONCEPT DESIGN

  27. Milwaukee, WI Portland, OR New York, NY Edinburgh, Scotland 11 SEPTEMBER 2012 NORTH SBCA

  28. San Diego, CA Japan Vancouver, BC TRANSBAY DISTRICT: OSCAR PARK CONCEPT DESIGN