Test & Measurements – TEM The multi rotor turbine Project Manager, Søren O. Lind 17-11-2016 This material is not for public distribution. Any use of the material must be given the appropriate reference: “Source: DTU Wind Energy”. For users other than the SARETEC Study Tour members visiting DTU 15 and 17 November 2016, prior permission must be obtained before using this material.
Turbines through time Vestas 225kW Bonus 600kW Bonus 1300kW Siemens 3600kW in Footer via ”Insert”; 2 DTU Wind Energy, Technical University of Denmark Vestas V164 8MW 09 March 2016 ”Header & Footer”
So why! Test activity on DTU, Campus Risø. The Vestas Babylon concept turbine. in Footer via ”Insert”; 3 DTU Wind Energy, Technical University of Denmark 09 March 2016 ”Header & Footer”
Well, let’s look at nature!! The square cube law in Footer via ”Insert”; 4 DTU Wind Energy, Technical University of Denmark 09 March 2016 ”Header & Footer”
But Why!! Argentavis The biggest known flying bird Argentavis magnificens Weight 70 kg Wind span 7 m in Footer via ”Insert”; 5 DTU Wind Energy, Technical University of Denmark 09 March 2016 ”Header & Footer”
That’s why! in Footer via ”Insert”; 6 DTU Wind Energy, Technical University of Denmark 09 March 2016 ”Header & Footer”
4 times area, 4 times nacelle and blade weight! Test activity on DTU, Campus Risø. The Vestas Babylon concept turbine. in Footer via ”Insert”; 7 DTU Wind Energy, Technical University of Denmark 09 March 2016 ”Header & Footer”
Vestas statement Challenges • One of the main aims is to find ways to circumvent the negative consequences linked to the infamous square-cube law. 20/4-2016, Windpower Monthly in Footer via ”Insert”; DTU Wind Energy, Technical University of Denmark 09 March 2016 ”Header & Footer”
Thank you! in Footer via ”Insert”; 9 DTU Wind Energy, Technical University of Denmark 09 March 2016 24 November, ”Header & Footer” 2016
Recommend
More recommend