SOUTH SIDE PARK PHASE 1 Public Meeting Schematic Design HOW DID WE GET HERE? Master Plan completed in May 2018 by Department of City Planning and Studio Bryan Hanes Outlined programming and improvements for the park.


  1. SOUTH SIDE PARK – PHASE 1 Public Meeting – Schematic Design

  2. HOW DID WE GET HERE? • Master Plan completed in May 2018 by Department of City Planning and Studio Bryan Hanes • Outlined programming and improvements for the park. • Identified a phasing plan with Green Infrastructure, a Boardwalk, Basketball Court, Children’s Discovery Area, Shared -Use Bike Path, Renovated Parking, etc. as Phase I • Project transitions from Department of City Planning to Department of Public Works for implementation Images by Studio Bryan Hanes • City received Capital funding to further design and construct Phase I of the Master Plan. • City applied for GTRP and LWCF Grants • Pashek + MTR was hired as a consultant to the City to implement above-ground features of Phase I. • Partnering with PWSA to design Green Infrastructure to manage stormwater SOUTH SIDE PARK - INTRODUCTION

  3. GREEN INFRASTRUCTURE AND STORMWATER SOUTH SIDE FLATS STORMWATER SEPARATION MANAGEMENT – FUTURE PHASE HOW DID WE GET HERE? SOUTH 21 ST STREET GREEN • Presented Final Preliminary Design at August INFRASTRUCTURE PROJECT 2019 Community Meeting – WESTERN PENNSYLVANIA CONSERVANCY • M-16 Priority Watershed in Green First Plan • 103 Million Gallons (MG) Combined Sewer Overflow (CSO) • Watershed Goals • 1.5” from 23 Acres of Impervious Area • Reduce CSOs • Create Capacity in Combined Sewers SOUTH SIDE PARK PROJECT • Project Goals • 1.5” from 9 acres of Impervious Area • Capture and Retain Stormwater to Slowly Release • Currently in 60% Design Phase SOUTH SIDE PARK - INTRODUCTION

  4. Phase 1 Scope – How it fits in with the Master Plan Phase 1 Project Schedule Review of Preliminary Design for Phase 1 Next Steps Community input via “stations” and comment forms SOUTH SIDE PARK - AGENDA

  5. Image by Studio Bryan Hanes SOUTH SIDE PARK – PHASE 1 SCOPE SUMMARY

  6. SOUTH SIDE PARK – SCHEDULE

  7. SOUTH SIDE PARK – SCHEMATIC DESIGN SITE PLAN

  8. SOUTH SIDE PARK – STORMWATER MANAGEMENT

  9. 42 spaces EXISTING CONDITIONS Concessions Building Quarry Field SOUTH SIDE PARK – QUARRY FIELD PARKING

  10. • Various storage nodes throughout the valley to detain runoff and slow release into the open swale. • Each node will have overflow connections to the combined sewer to engage during large storms. • Underground systems will all have access for long term maintenance SOUTH SIDE PARK – UNDERGROUND STORMWATER STORAGE SYSTEMS

  11. EXISTING CONDITIONS Serpentine Steps 5 spaces Playground Rain Garden Quarry Field Discovery Garden Basketball Court SOUTH SIDE PARK – PLAYGROUND, DISCOVERY GARDEN AND RAIN GARDEN

  12. SOUTH SIDE PARK – DISCOVERY GARDEN AND RAIN GARDEN

  13. SOUTH SIDE PARK – PLAYGROUND

  14. Bike Racks Marble Rings Lawn Steps (future phase) Food Trucks Picnic Lawn Picnic Pavilion EXISTING CONDITIONS (future phase) Rain Garden Planted Swale Amphitheater Area (future phase) SOUTH SIDE PARK – FESTIVAL GREEN

  15. SOUTH SIDE PARK – FESTIVAL GREEN

  16. Connection to Existing Stairs Shared Bike Lane Boardwalk Overlook EXISTING CONDITIONS B 56 spaces A Overlook Stepped Stormwater Garden SOUTH SIDE PARK – BOARDWALK AND PARKING

  17. Connection to Existing Stairs Shared Bike Accessible Route Lane Boardwalk Overlook EXISTING CONDITIONS B 56 spaces A Overlook Stepped Stormwater Garden SOUTH SIDE PARK – BOARDWALK AND PARKING

  18. Stepped Stormwater Garden Section A Stepped Stormwater Garden Section B SOUTH SIDE PARK – SCHEMATIC DESIGN SECTIONS

  19. Image by Studio Bryan Hanes SOUTH SIDE PARK – STEPPED STORMWATER GARDENS

  20. Entrance Median EXISTING CONDITIONS Rain Garden Stormwater Storage SOUTH SIDE PARK – 21 ST STREET ENTRANCE

  21. Image by Studio Bryan Hanes SOUTH SIDE PARK – 21 ST STREET ENTRANCE STORMWATER STORAGE

  22. SOUTH SIDE PARK – SCHEDULE

  23. WE WANT YOUR INPUT !! SOUTH SIDE PARK