september 10 2019 public information meeting
play

September 10, 2019 Public Information Meeting S-27 275-6(1052) N - PowerPoint PPT Presentation

S-27 275-6(1052) N Norfolk Wisner; C ; C.N .N. 3 . 32319 September 10, 2019 Public Information Meeting S-27 275-6(1052) N Norfolk Wisner; C ; C.N .N. 3 . 32319 PROJECT LOCATION S-27 275-6(1052) N Norfolk Wisner; C ; C.N


  1. S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319 September 10, 2019 Public Information Meeting

  2. S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319 PROJECT LOCATION

  3. S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319 SCHEDULE & COST • Development of preliminary engineering and environmental activities. • NDOT has applied for additional federal funding through a BUILD Grant. • Project costs are estimated at $63 million.

  4. S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319 PROJECT PURPOSE • Fulfill legislative intent to continue development of the expressway system identified in the 1988 Nebraska Highway Needs Study. • Improve regional connectivity for vehicles in northeast Nebraska, including commercial vehicles, by providing important expressway connections with Nebraska Highway 57 (N-57), N-15 & N-51, while maintaining convenient highway access for communities within the area. • Reduce the annual corridor delay of 477,300 vehicle hours between Norfolk and Wisner, which is expected to worsen as traffic volumes increase in this area. • Maximize use of existing transportation infrastructure , including connecting highways, and existing right-of-way (ROW) and improve the reliability and condition of existing facilities.

  5. S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319 2 PLUS 2 APPROACH Goals Criteria • Stay consistent with 2+2 • Existing lanes concept § Remain in place • Minimize impacts to § Asset preservation existing lanes § Resurface § Analyze and balance • New lanes the system § Offset of existing § New & Reconstruction Standards

  6. S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319 SCOPE OF WORK

  7. S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319 TYPICAL SECTION

  8. S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319 ALTERNATIVES Design modifications during preliminary engineering may be required to avoid impacting resources.

  9. S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319 ALTERNATIVES Design modifications during preliminary engineering may be required to avoid impacting resources.

  10. S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319 ALTERNATIVES Design modifications during preliminary engineering may be required to avoid impacting resources.

  11. S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319 ALTERNATIVES Design modifications during preliminary engineering may be required to avoid impacting resources.

  12. S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319 FEEDBACK https://dot.nebraska.gov/projects/ Questions or comments should be submitted by September 25, 2019 to: Sarah Soula Public Involvement Manager Nebraska Department of Transportation PO Box 94759 Lincoln, NE 68509-4759 Sarah.soula@Nebraska.gov Tel (402) 479-4871

  13. S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319 THANK YOU! S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319

Recommend


More recommend