Presented by Daniel Gilbert Raw Water Mains Modelling Prioress Mill WPS Network Overview Operational Incident Burst on 48inch Isolate 48 inch Prioress Mill 8 bar Max Is there enough pressure to reach SOR WPS Sluvad Water Treatment
Presented by Daniel Gilbert Raw Water Mains Modelling
Prioress Mill WPS Network Overview
Operational Incident Burst on 48inch ‐ Isolate 48 inch ‐ Prioress Mill 8 bar Max Is there enough pressure to reach SOR WPS – Sluvad Water Treatment Works ?
Model Construction Modelling Constraints Time Data
Critical Point (89m AOD) SOR WPS (48m AOD) Prioress Mill WPS (22m AOD)
Conclusion Head losses Velocity Pressures 1.4 m/s 73.4m Required 0.8m/km 6.4m total