project the future innovating at present
play

PROJECT THE FUTURE, INNOVATING AT PRESENT. Index 2 Company 3 - PDF document

ENGINEERING PROJECT THE FUTURE, INNOVATING AT PRESENT. Index 2 Company 3 Experience 5 Roads and Highways 5 Public Transport Infrastructure 8 Environment and Water 12 Ports and Coasts 14 Town planning 18


  1. ENGINEERING PROJECT THE FUTURE, INNOVATING AT PRESENT.

  2. � � � Index 2 Company 3 Experience 5 � Roads and Highways 5 � Public Transport Infrastructure 8 � Environment and Water 12 � Ports and Coasts 14 � Town planning 18 � Edification 20 � Airports 24 � Ground engineering 26 � Rehabilitation and pathologies 28 � Materials’ Technology 29 � Auscultation 30 Certifications 31

  3. Company 3 COMAYPA provides its technicians services to public and private clients, in the national and international area. Throughout its 30 years of history, the company has gradually expanded its business areas and currently develops complex engineering and architectural projects. Professionalism and experience. GUARANTEE OF SUCCESS 2010 2012 Transformation of “del Mar” Avenue (Castellón). Before and after the construction of the pallet booked (TRAM) Our company has an important multidisciplinary human team, with 8 different degrees: Civil Engineers, Industrial Engineers, Environmental Engineers, Geologists, Chemists, Public Works Engineers, Engineers Surveyors and senior technicians in development and implementation of construction projects. We also have regular collaboration of experts in diverse subjects such renowned Architects, Agronomists, Aeronautical, etc. In the area of material resources, it has evolved to have high technology, incorporating a computer system with extensive services and equipped with the latest updates, including developing own programs which are processed all stages involved in Engineering and Geotechnics field, as well as modern means of production and analysis that made allow global approaches and get the best solutions.

  4. 4 EFFORT TO INNOVATION AND CONTINUOUS IMPROVEMENT. It applies in all our processes an integrated management system articulated according to ISO 9001 and ISO 14001. It is a betting to continuous improvement, boost staff training, orientation to quality, respect for the environment and work safety. It also encourages the application of new technologies and research by developing its own R + D + I, in collaboration with universities and official agencies of research. FULL SERVICE

  5. Experience 5 Roads and Highways The competitiveness of a territory is based on modern transport infrastructure, roads with sufficient capacity to interconnect big productive, logistics and population centres, in a fast, safe and effective way. The quality in planning, design and construction of these facilities is essential for its later exploitation and conservation. Design and Project of over 100 km of dual carriageway. Technical Assistance to the construction management of over 100 km of dual carriageway service. Geotechnical studies for new construction projects or enlargement and improvement project of more than 300 km of dual carriageway. New Castellón - Benicassim Improving road safety in the CV-16, section road axis connecting. between the CV-10 and CV-160, San Juan de Moro. Castellón. Castellón.

  6. 6 Castellón - La Pobla Tornesa Dual carriageway. CV-238 Road. Castellón - South Borriol New expressway Castellón - Grao and roadway reserved for public transport.

  7. 7 Improving road safety in CV-20, section Villareal. (Castellón) OUTSTANDING REFERENCES Projects: � Basic project: CV-100 conditioning from pk 5 +000 to 9 +000 in Rosell (Castellón) � Construction Project: Variant of San Rafael del Rio (Castellón). � Improving Access Platform and reordering N-238. Vinaroz-Uldecona, between KP 0 +000 to 2 +500. Castellón Province. � Expansion and improvement of layout of CV-173 from Ballestar Pobla to Mosqueruela, Villafranca del Cid. � Modified Project 1 of connection vial between Peñiscola and Benicarló in Peñiscola. � Peñiscola Benicarló connecting road project in Benicarló municipality. � Modified Project 1 of the road axis Castellón Benicasim. � Bridge over Mijares River in Ribesalbes Project. � Project of layout improvement of CV-170 pk 5 +000 to 7 +000 in Useras (Castellón) � Via Park CV-18 KP 8 +050 to 14 +700 Project. Technical Assistance Project Management: � Improving Safety road in the CV-20, KP 0 +200 to 3 +500. Villarreal. Castellón Province � Improving road safety in the CV-20, pk 5 +200 to 8 +000. Onda (Castellón) � Benicàssim - Castellón new road, on the stretch of west road, road “La Ralla”. � Benicàssim - Castellón new road, on the stretch of road “La Ralla”- Old railway. � Puebla Tornesa - Castellón motorway CV-238, on the stretch of road Castellón- south Borriol � CS-800 road from PK 2 +700 to 32 +600 Pobla Tornesa-Albocacer. � New Ares - Morella Road. � Maintenance Road, dependent of Infrastructure Department of Castellón. Years 1994-1996 1997-1999, 1999- 2002, 2002-2005, 2005-2007, 2008-2009 and 2009-2012. � Improving road safety in CV-16, on the stretch of road between CV-10 and CV-160. San Juan de Moro. (Castellón Province)

  8. 8 Public transport infrastructure Urban traffic is complicated today in most metropolitan areas of developed countries where congestion has become a daily problem difficult to solve. It is a problem that produces undesirable effects on drivers’ and pedestrians’ mobility. Breach timetables for public transport, increased travel time on public and private transport, air pollution and intolerable noise levels that they seriously affect health, are some of those effects. All this redounds in an evident decline of population welfare, but also it has its correlate in significant economic losses. One of the most effective responses to the problem of congestion lies in the extensive use of computer systems and telecommunications applied to traffic management, known as Intelligent Transportation Systems (ITS) are being an efficient support for citizens and for public institutions in an attempt to palliate the congestion problems of urban and intercity transport, not only helping to improve their mobility but making it more sustainable. Recinte Castellón station, to platform reserved for urban transport (TRAM). Del Mar Avenue – Columbretes Street. Castellón. SPECIFIC SERVICES OFFERED: � Tracer and holdings studies. � Study of disease to adjacent buildings. � Pathologies and Rehabilitation’s Studies of structures. � Geotechnical studies. � Foundation design. � Drafting Project. � Construction Management. � Quality control of materials.

  9. 9 Bridge over Seco River, Platform reserved for public transport. Castellón. Platform reserved for public transport in Castellón.

  10. 10 Tunnel Construction under General Urrutia Street, T2 line. Valencia subway. T2 Line Valencia subway Maristas Brothers Station Project. T2 Line. Valencia subway.

  11. 11 Hermanos Maristas Station Project. T2 Line. Valencia subway. OUTSTANDING REFERENCES Projects: � Drafting of Project: Maristas Brothers Station T2 Line Valencia subway. Network Managing entity of transports and ports of Generalitat. Valencia. 2008. � Amended project 1 T2 Line subway south of Valencia. � Amended project 1 Network Platforms reserved to Public Transport in Castellón on the stretch of road Uji- Ribalta. � Amended project 1 Network Platforms reserved to Public Transport in Castellón on the stretch of road Ribalta Park � Amended project 1 Network Platforms reserved to Public Transport in Castellón on the stretch of road Coloumbretes-Serradal. Works: � Construction Management: Network Platforms reserved to Public Transport. Phase I. On the stretch of Columbretes-Serradal road. Castellón. C.I.T. 2011 � Technical Assistance to Construction Management: Infrastructure Construction Line 2 Subway of Valencia. On the stretch of Ruzafa - Maristas Brothers. Valencia. Management Body of the transport network and Ports of Generalitat. 2007. � Technical Assistance to Construction Management: Network Platforms Subject and Public Transport in Castellón. Phase I. On the stretch of UJI-Ribalta Park. Castellón. C.I.T. 2008. � Technical Assistance to Construction Management: Car ride Upgrading of Ribalta Park. Castellón. C.I.T. 2008. Geotechnical: � Geotechnical study for drafting project of T2 line, Valencia subway. On the stretch of Ruzafa-Maristas Brothers. Valencia. 2009. � Geotechnical study for construction of the bridge over the Seco River, Network platforms reserved to public transport in Castellón. On the stretch of UJI-Ribalta Park. 2007. � Screen Wall’s Geotechnical Study for the underpass, Network platforms reserved to public transport in Castellón. On the stretch I. Columbretes-Grao Castellón. 2010.

Recommend


More recommend