Project List Parks Pahoa gym and playfields Pahoa skateboard - PDF document

Project List Parks Pahoa gym and playfields Pahoa skateboard park and master plan Pohoiki Fire/Police Pahoa Keaau Roads/Trails County Pohoiki and Kalapana realignments PEAR (Ainaloa


  1. Project List • Parks – Pahoa gym and playfields – Pahoa skateboard park and master plan – Pohoiki • Fire/Police – Pahoa – Keaau • Roads/Trails – County • Pohoiki and Kalapana realignments • PEAR (Ainaloa & Hawn Acres Rd 8) • Old Volcano Trail (survey phase) – State • Hwy 130 shoulder lane • Hwy 130 widening (Planning phase) – Prospective • Hwy 130 intersection improvements • PMAR • RR ROW bike/pedestrian trail • Water– emergency spigots Keaau Police/Fire Station– Still looking for a site, preferably along Hwy 11. Small size of Keaau Police Station constrains hiring additional personnel. 1

  2. Pahoa Park/Fire/Police Complex K e K i a k a o u ' u - P S a t h o a R S t d a n i u A ` O Kahakai Blvd a l o S t Pahoa By-Pass Rd La`au Way La`au Pl ( J a p Pahoa Village Rd a n S t e s (New Pahoa Subd. Rd) a e ` C a a p m A ` p R d ) ² Kau Hale Rd 0 550 1,100 2,200 3,300 4,400 3 Feet 2

  3. Pahoa Park/Fire/Police Complex Scope: District Park to include a gymnasium, ballfields, comfort stations, pavilions, parking, landscaping and all necessary improvements associated with a new park and related facilities. Budget: Gym/Playfield: $750,000 (design) + $12M (construction) Fire: $4.5M (design and construction) Police: $2.685M (design and construction) Hwy access: $2M (design and construction) Total: $21.935M Status: Design underway 3

  4. Pahoa Skatebd Park & Master Plan Pahoa By-Pass Rd L a ` La`au Pl a u W a y (Japanese Camp Rd) `Apa`a St P a (New Pahoa Subd. Rd) h o a V i l l a g e R d Kau Hale Rd Kekauonohi St K a p o h o R d Kaohe Homestead Rd Cemetery Rd Pahoa - Kalapana Rd ² 0 430 860 1,720 2,580 3,440 Feet Pahoa skateboard park: Location: open area between the Pahoa Neighborhood Facility and the new parking lot and existing basketball courts at TMK 1-5-02:020 Funding: Coumcilmember Safarik had appropriated and funded the $90k for the skate park. Community is raising the balance of funds required. Schedule: The community plans on starting on or around August 21, with a completion date of November 13, 2006. Pahoa Park Master Plan: $50,000 appropriated. 4

  5. Isaac Hale Beach Park Pohoiki Rd Kalapana-Kapoho Beach Rd ² 0 500 1,000 2,000 3,000 4,000 Feet 5

  6. Isaac Hale Beach Park Contract: $5M Schedule: Start construction: August 21, 2006 Complete: October 4, 2007 6

  7. Isaac Hale Beach Park Near ramp (Area “A”): picnic tables, parking, restroom (temporary) and shower Along beach: picnic shelters and tables, parking, 5’ concrete path Inland: campsites w/ picnic tables, restroom and shower, additional boat parking 7

  8. Pohoiki Road Realignment Scope: 0.5 mile bypass. Status: EA complete, design 90% complete. Construction NTP estimated October 2006. Appropriation: $2M 8

  9. Kalapana Road Realignment Scope: Realignment of two sections (approx. 1000’ l.f. each) further inland. Status: EA and design complete. Estimated construction start August 2006. Contract: $1,522,000 9

  10. PEAR– Ainaloa Blvd Scope: Improve sight distance at two locations, install pedestrian sidewalks along portions of the road, install street lights at selected intersections Status: Design and survey complete. Construction NTP estimated January 2007. Appropriation: $1.5M 10

  11. PEAR– Hawaiian Acres (Rd 8) Macadamia Dr y w H k S c h a b i p n Kipimana St m a i S t a n R d Keaau-Pahoa Bypass Hwy Hawaii Belt Rd (Mamalahoa Hwy) Ohe St Pilikai Rd ` A ` w A North Rd k Pala'ai St a p a u l a h A K i a A v l e R d a v n a u e ` A a i K u a Keaau-Pahoa Rd n w u H a A v i a A v e Kahili Ave l o e ` South Rd A Kaloli Dr a l Ola'a Rd o A e v Kika Ave e A Shower Dr Kukui Ave ` R d E v n a Pikake St k e H u i H a i n h Ala Hele O Puna Rd K a a a ` h A Luhi Rd Oliana St a i v a Kiele Ave n e R d h a w e l u Mai`a Ave H a i Lai Ave A A Koali Ave v v Napua St e e d N `Olena Ave a Pohaku Cir a L o n a `Ala Loop R ` Pohaku Dr i a a `Ohe Ave l m A i ` M i i Kehaulani St A e r a P l i D u v a A a e v Poha Ave A u e k v u Akialoa Rd 36th Ave 35th Ave a Melekule St l e k o N a Kea Rd M A a v u Po`ouli Rd e `Okika Ave p 40th St a P k a P a a l a A p U P i a p v o 39th Ave o a e Opae St S a l n l i a t A i v M A e o v Niuhi St Makuu Rd 38th Ave i e A U Moana St 34th Ave v h e a l Orchid Land Dr o Koloa Maoli Rd a Kiele St Aulii St K d Waa Waa Rd A v v a l e B ` t o i S Pakaka Rd M 37th Ave a h k e u a o H a `Ope`ape`a Rd h w h n Hapuu Dr i n a A o 41st Ave `O`o`a`a Rd a a K A l R l u w e a d Aloha Dr e Tiki Lane D S P o w t ` a r Alula Rd I l Vista Dr e o i Kaluahine St o l a Aku St S H K Rose St R t o e a d Uilani Dr Railroad Ave p Punawai St u Rainbow Dr R Kapika Pl `A`o Rd e Kio`ele Rd Ainaloa Blvd d R Pueo Rd d `Auina St Mauna Kea Rd r D Coral Dr Lehua St a o a l Ale Rd n A i Hibiscus St Kapuna Rd P Kehau Rd Flower Rd Hapuu Rd Plumeria St a h o Pikake St a B y - P Road A Pahoa Village Rd a s Laau Rd s Gardenia St R d ² F o R d r e s t o R d o h a p K 0 4,400 8,800 17,600 26,400 35,200 Feet Scope: Improve drainage and sight distance alongs portions of the road. Status: Design 30% complete. Construction NTP estimated February 2007. Appropriation: $2M 11

  12. Old Volcano Trail Hoaka Rd Kealakai St Waikahe Rd Alawaena St Macadamia Dr Y o u n g S t Kipimana St Ainaola Dr Kulaloa Rd t S o M i l K ( i a Loke Rd i l c k a c e Pala'ai St R K s North Rd d s e a r o a `Awa Ave North Rd u a d - P K ) a Kaloli Dr a h h South Rd Huina Rd o i i l a Kika Ave A A l N Kulani Rd R v a e Hawelu Rd d H Kukui Camp Rd Lai Ave Mikana Ave e d `Ohe Ave Mai`a Ave l e a r o D O d R u Poha Ave R Koloa Maoli Rd a k P A h e Akialoa Rd o 3 u p N Pszyk Rd P n o 3 5 a Kea Rd h Hawaii Belt Rd (Mamalahoa Hwy) 7 t h R I Uala Ave Makuu Dr 40th St t d P Stainback Hwy N h A 39th Ave a p A v i K e o o v S N Peck Rd e t p `Io Kea Rd u t Ka`ohuwalu Dr a S Kahakai Blvd R a Aulii St i d Puhala St e l Moho Rd M Plumeria St d 41st Ave v B l Palila Rd R a Kaluahine St o a l Aku St i a l r n o t i S A a Kahikopele St e `A`o Rd d s o A Mauna Loa Dr R `O`o`a`a Rd S t v Ainaloa Dr e Lehua St a n u i Hopue Rd Pikake St A Kehau Rd Hapuu Rd ` Lehuanani Rd Alii Rd Pueo Rd N Glenwood Rd S t S t e i Palainui Ave l a U ` a p A Forest Rd ` Kapoho Rd e Ohia Ave Cemetery Rd v A a i l Amaumau Rd L e Pohoiki Rd `Omeka Rd t Kopaa St S i `Ohialani Rd Road M a k u a h K Kaleponi Rd Leilani Ave M i d d Makoa Rd R d Malama St e o Uluhe Rd v a l e Wright Rd A W Pa Alii St Road E h i i i R P a A l k i o d Pahoa - Kalapana Rd ` Haunani Rd t k Ala'ili Rd m i S o d K Iiwi Rd a i R a k K u a e u e l a n Liona St H p m a a R u a ( h i D P u e l i L r a b R r k y d R A d v Upper Puna Rd ) Kalapana-Kapoho Beach Rd e D r m i R e r a t C r Hilina Pali Rd ² d R a i h 0 7,500 15,000 A 30,000 45,000 60,00 Fe Appropriation: Survey-- $80,000 (Councilmember Jacobson’s discretionary funds) Planning/Design– TBD Construction– TBD Schedule: Start survey: June 21, 2006, starting from National Park and working down Complete: one year 12